Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

NUGEN JOHNSON, LLC

UEI: EJCNG28NZGR9

NUGEN JOHNSON, LLC is a federal contractor, registered under UEI EJCNG28NZGR9. It has been awarded $171,400 in federal contracts. Primary work spans Commercial and Institutional Building Construction. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

EJCNG28NZGR9

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

1

All time

Active

0

Currently performing

Completed

1

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with NUGEN JOHNSON, LLC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for NUGEN JOHNSON, LLC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in NUGEN JOHNSON, LLC's top NAICS codes and agencies

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution, implementing simple dimming controls, replacing ballasts, lamps, and ceiling fans, and replacing variable air volume systems. The project also requires correcting plumbing deficiencies and ensuring all work adheres to ADA accessibility guidelines and seismic-resisting system standards. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to prevailing wage rates. Key administrative requirements include submitting submittals within 14 days of award, providing a comprehensive safety plan, and managing all construction and demolition waste.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 11 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additional requirements include the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, as well as site improvements such as paving, drainage upgrades, and hazardous materials abatement. The work is divided into two primary pricing line items: building renovation and the removal and replacement of paving. The contract has an estimated value between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price. Bidders must submit responses by November 23, 2026, and an optional pre-bid meeting is scheduled for November 2, 2026. The project mandates strict adherence to quality control through a three-phase control process and requires a Contractor Quality Control Plan approved by the Contracting Officer. Bonding requirements are tiered, with proposals over 150,000 dollars requiring bid, payment, and performance bonds. Compliance with the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines is mandatory. Invoicing must be processed through Wide Area Work Flow using NAVFAC Form 4330/54.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 25 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 28, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must complete six specific GFEs prior to the bid opening date to avoid being deemed non-responsive. Mandatory requirements include providing proof of public notification via an online publication for 30 consecutive days and a print newspaper for one day, as well as evidence of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA). While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, failure to include the required publicity and agency assistance proof within the initial bid package will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of mechanical, electrical, and underground stormwater retention systems. An additional option for the P1016 Consolidated RDT&E Systems Facility includes the construction of a 17,978 square foot laboratory with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. This solicitation is set aside for various small business categories and requires adherence to Davis Bacon Wage Rates, while remaining exempt from sales tax. Bidders must provide pricing across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, and plumbing, with responses due by November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and necessary electrical and vanity/cabinet repairs. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, EPA, and local Massachusetts building codes. The contract is a small business set-aside and requires a single lump sum bid, though the lowest price does not guarantee an award. Evaluation is based on best value, weighted by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submissions include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a Massachusetts contractor's license, and wage rate certification. The contract is subject to the Davis-Bacon Act and Executive Orders regarding minimum wage and paid sick leave. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30. Key deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed and a final punch list to be corrected within 14 days of the substantial completion walk-through.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, common areas, and mechanical and utility rooms. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained throughout the process. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include providing payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the successful testing of restored mechanical, plumbing, electrical, and life-safety systems, the removal of all debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 22 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
The P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut, involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, foundations with rigid inclusions and load transfer mats, reinforced concrete floors, and comprehensive grounding, lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and buildings 524 and 393. Site work encompasses clearing, rock excavation, grading, fill, and the mitigation of impacts on existing wetlands. Infrastructure improvements include access roads, paved loading areas, landscaping, and a full electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is issued by J & J Contractors, Inc., with a project duration of 1828 calendar days. The opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 1 day
View Details
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting firm fixed price bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The project scope includes site preparation, structural work such as saw cutting reinforced concrete walls and installing headers, and the construction of an ADA-accessible route to grade or sidewalk. Additional requirements involve weatherproofing the installation, potentially adding a canopy that matches existing architecture, and restoring all interior and exterior surfaces. The contract award is scheduled for December 4, 2026, with a weather-dependent completion date of March 31, 2027. This is a price-based solicitation where the award will be made to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements under Chapter 10-3 of the Colville Tribal Code. Bidders must demonstrate technical and financial capacity, provide a detailed project schedule, and submit a subcontracting plan. Mandatory insurance coverages include Commercial General Liability of at least 1 million dollars per occurrence, Business Automobile Liability, and Worker's Compensation per Washington state law. Bids must be submitted electronically to Ryan Moses by November 20, 2026. Final acceptance is contingent upon successful inspections and approval from the Authority Having Jurisdiction.
Confederated Tribes of the Colville Reservation

POSTED

about 7 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
SLED
Soccer Field and Structural Renovations at Silver Lakes North Park
Solicitation # RE-26-04
The City of Pembroke Pines, through its Recreation and Cultural Arts agency, has issued Invitation for Bid RE-26-04 for soccer field and structural renovations at Silver Lakes North Park. The project has an estimated cost of 480,000 dollars and a required completion timeframe of 90 calendar days from the Notice to Proceed, with an estimated start date in December 2026. The scope of work includes regrading and re-sodding the soccer field, irrigation modifications, installing new concrete player seating pads, demolishing and replacing the existing pavilion, improving sports field lighting, and performing a full interior renovation of the existing restroom building. All work must adhere to the current Florida Building Code and provided construction documents, including architectural, civil, and MEP drawings. Bids must be submitted electronically via the OpenGov portal by November 3, 2026. The contract will be awarded to the most responsive and responsible bidder, with price preferences available for Local Pembroke Pines Vendors (5%), Local Broward County Vendors (2.5%), and Veteran Owned Small Businesses (2.5%). For contracts exceeding 200,000 dollars, the successful contractor must provide payment and performance bonds for 100% of the contract price within 15 days of the award. Additionally, the project is subject to HUD Davis-Bacon prevailing wage requirements and Section 3 economic opportunity regulations. Liquidated damages for delays are set at 500 dollars per day.
Recreation & Cultural Arts

POSTED

about 12 hours ago

DEADLINE

in 19 days
View Details