Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

PCL CONSTRUCTION SERVICES, INC,2000 S COLORADO BLVD #2-500 ,DENVER CO 802227928

UEI: SLED_A4BC0022BEB4CAA3

PCL CONSTRUCTION SERVICES, INC,2000 S COLORADO BLVD #2-500 ,DENVER CO 802227928 is a federal contractor, registered under UEI SLED_A4BC0022BEB4CAA3. It has been awarded $12,107,736 across 1 federal contract. Primary work spans Unknown NAICS. Top awarding agencies include Dsc Contracting Services Division.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_A4BC0022BEB4CAA3

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Dsc Contracting Services Division$12.1M100%
Awards by NAICS
- Unknown NAICS$12.1M100%
Awards by Agency Over Time
Awards by Place of Performance

Open opportunities in PCL CONSTRUCTION SERVICES, INC,2000 S COLORADO BLVD #2-500 ,DENVER CO 802227928's top NAICS codes and agencies

NAICS: 237110
New
Federal
Y--BRCA 318695 - CONSTRUCTION
Solicitation # 140P2026B0004
Solicitation 140P2026B0004 is a total small business set-aside for the rehabilitation of the main water system at East Creek and Yovimpa within Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, the project has an estimated price range of 15 million to 20 million dollars and an anticipated performance period of 550 calendar days. The scope of work includes replacing and upgrading water lines, repairing leaks in the raw water line, installing new valves, enlarging storage tanks, repairing service connections, and decommissioning obsolete assets. Additionally, the project involves rehabilitating or replacing the Lodge Loop Fire Protection Supply, which may require increasing the finished water line from 6 to 8 inches. The project is located in the Bryce Canyon Recreational Area, with certain elements, including wells and approximately 500 linear feet of the raw water line, situated on Dixie National Forest land, requiring coordination with the US Forest Service. Due to the park remaining open during construction, contractors must minimize visitor impact and implement protective measures to ensure the surrounding area remains undisturbed. Logistics are further complicated by the rural location, with the nearest major suppliers and lodging in St. George or Salt Lake City. Bids are due by September 30, 2026, and the award will be based on FAR Part 14 procedures. The project is currently an unfunded requirement with a high expectation that funds will be available.
Dsc Contracting Services Division

POSTED

3 days ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Federal
Y--Rehabilitation of Water and Wastewater System
Solicitation # 140P2026B0003
Solicitation 140P2026B0003 is a sealed bid invitation for the rehabilitation of water and wastewater systems at the Curecanti National Recreation Area in Colorado. Managed by the National Park Service Denver Service Center, the project involves replacing and upgrading water distribution, wastewater collection, electrical, mechanical, and SCADA infrastructure across the Elk Creek, Lake Fork, and Iola areas. The scope of work includes the installation of large-scale HDPE water-distribution systems using both horizontal directional drilling and open-cut methods within remote, rocky terrain. A critical requirement is the maintenance of operational continuity for existing water services, roadway access, and visitor operations throughout the construction process. This project is a total small business set-aside with an estimated value ranging from 5 million to 15 million dollars. The contract is expected to be a firm-fixed-price award with a performance period extending through October 31, 2028, or approximately 365 to 550 calendar days. Bids are due by September 29, 2026, following a formal site visit scheduled for September 10, 2026. Awardees must provide bid, performance, and payment bonds, maintain required insurance, and comply with all local Colorado construction licensing and permitting regulations. Technical requirements are supported by detailed geotechnical reports and construction drawings covering primary sanitary lift stations and RTU panel layouts.
Dsc Contracting Services Division

POSTED

3 days ago

DEADLINE

in 24 days
View Details
NAICS: 237110
New
Federal
Z--Yellowstone - Mammoth Water Line Replacement
Solicitation # 140P2026B0005
Solicitation 140P2026B0005 is a construction project for the National Park Service, Department of the Interior, to replace the water line in the Mammoth Housing Area of Yellowstone National Park, Wyoming. The project aims to re-establish a looped water system and ensure year-round water service to apartments. The scope of work includes installing approximately 750 linear feet of 6-inch HDPE water main and new water services to apartments, reconnecting and relocating fire hydrants, and rehabilitating or replacing faulty pressure-regulating valves. The estimated contract value ranges from 250,000 to 500,000 dollars, though it is currently noted as an unfunded requirement with a high expectation that funds will become available. This procurement is set aside for SBA Certified Women-Owned Small Businesses under NAICS code 237110, with a size standard of 45 million dollars. The estimated period of performance is 120 calendar days, which may include winter construction and weather-related shutdowns. Due to the rural location and the fact that the park remains open, contractors must implement unique material delivery logistics and schedule activities to minimize visitor impact. Bids are to be submitted via sam.gov by September 15, 2026, and will be opened and read according to FAR Part 14 procedures. The primary point of contact for this effort is Vicki Freese-Supler.
Dsc Contracting Services Division

POSTED

3 days ago

DEADLINE

in 10 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the construction of a new 0.65 MGD Membrane Bio-Reactor wastewater treatment plant at the South Rim Village in Grand Canyon National Park, Arizona. The project is a design-bid-build, firm-fixed-price contract with a magnitude exceeding 100 million dollars. The scope of work includes the construction of new treatment facilities, administrative and support buildings, and process systems, as well as the complete demolition and removal of existing infrastructure. Additional requirements include access road improvements, the construction of a compost facility, and a 12-month operational support period. The period of performance is scheduled from February 1, 2027, to February 1, 2030, with a total performance duration of 1095 calendar days following the notice to proceed. The government will utilize a multi-factor, best-value tradeoff process for award, evaluating technical experience, technical approach, past performance, price, schedule, and small business participation. Key personnel requirements include a Project Manager, Superintendent, and specialists for quality control, safety, and historic preservation. Contractors must provide performance and payment bonds and adhere to union prevailing wage rates for heavy construction in Coconino County. Proposals must be submitted electronically via email by November 2, 2026. Payment will be processed through the Treasury's Invoice Processing Platform, requiring specific documentation such as pay estimate forms and current construction schedules.
Dsc Contracting Services Division

POSTED

3 days ago

DEADLINE

in about 2 months
View Details