Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

POWERHANDLING INC

UEI: C111PM2DW3L1

POWERHANDLING INC is a federal contractor, registered under UEI C111PM2DW3L1. It has been awarded $66,308 in federal contracts. Primary work spans Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing and Farm Machinery and Equipment Manufacturing. Top awarding agencies include Department Of Defense.

Contact Information

Registration and classification details

Registration

UEI Code

C111PM2DW3L1

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

3

All time

Active

0

Currently performing

Completed

3

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with POWERHANDLING INC

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for POWERHANDLING INC

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in POWERHANDLING INC's top NAICS codes and agencies

NAICS: 333924
New
Federal
35K lb. Base Capacity 4-wheel Sit-Down AC Electric Lift Truck, including Options, Battery, Charger, and Freight
Solicitation # W911S227U0101
Solicitation W911S227U0101 is a total small business set-aside for the procurement of one new, heavy-capacity, four-wheel sit-down AC electric lift truck with a base capacity of 35,000 pounds. The equipment must be current production and is intended for indoor industrial material-handling operations at the McAlester Army Ammunition Plant in Oklahoma. Key technical requirements include a rated lifting capacity of at least 28,700 pounds at a 24-inch load center, a maximum fork height of 103.5 inches, and a 72-volt electrical system or better. The forklift must be delivered fully assembled and include a compatible battery, charger, and all necessary accessories. The contract is awarded on a fixed-price basis to the responsible offeror whose proposal is most advantageous to the government, evaluating both price and technical compliance. Delivery is required on an FOB Destination basis no later than September 30, 2027, with a preferred delivery window of 30 days. The award includes a minimum 12-month or 2,000-hour general warranty and a 36-month or 6,000-hour powertrain warranty. The successful contractor must also provide on-site operator orientation and furnish comprehensive electronic and hard-copy manuals. All quotes must be submitted via the PIEE Solicitation module and include a completed certification of country of origin.
W6QM Micc-Ft Drum

POSTED

about 16 hours ago

DEADLINE

in 10 days
View Details
NAICS: 333111
New
SLED
23NE Stoltzfuz Spreader
Solicitation # 6100066960
The Pennsylvania Game Commission is soliciting electronic bids for the procurement of one Stoltzfus WLS50 Spinner/Spreader Machine to be used for liming herbaceous openings on State Game Lands. The required equipment must feature a 103 cubic foot struck capacity hopper, a 24 inch carbon steel slat-style PTO driven body chain, dual 24 inch four-blade hydraulic spinners with 15 gpm, 11L x 15 8-ply tires, a light kit, and a low rate kit for fertilizer with a minimum of 125 lbs per acre. The contract will be awarded to the lowest responsive and responsible bidder, with the Commonwealth reserving the right to award by line item if deemed in its best interest. Bids must be submitted electronically through the SRM system by November 13, 2026. Required documentation includes the Lobbying Certification and Disclosure forms, the Reciprocal Limitations Act Requirements form with the State of Manufacture Chart, and various representations and certifications regarding Iran Free Procurement and nondiscrimination. Delivery is required F.O.B. Destination within 30 days of the effective date. Payment will be processed via Automated Clearing House (ACH), and the contractor must submit ACH information within 10 days of the award. The contractor is also responsible for adhering to strict hazardous substance labeling and Material Safety Data Sheet requirements for any applicable materials.
Pennsylvania Game Commission

POSTED

about 23 hours ago

DEADLINE

in 13 days
View Details
NAICS: 236220
New
Federal
Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility
Solicitation # W911KB29RWP01-A
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence for two military construction projects at JBER-Richardson, Alaska, with a combined estimated target budget of approximately 182.5 million dollars. The first project, the Pallet Processing Facility (JBR041), has a target budget of 79.5 million dollars to create a 52,000 square foot, all-weather, 24-hour facility that will serve as the sole hazardous cargo processing point and consolidated alert final preparation and holding area at JBER. The second project, the Rapid Deployment Facility (JBR044), has a target budget of 103 million dollars and consists of a complex to support pre-deployment and redeployment for a Brigade Combat Team (Airborne), featuring a Passenger Shed for personnel processing and a Joint Inspection Facility equipped with vehicle inspection lanes, an indoor wash rack, and a covered defuel point. Both facilities require specialized cold climate design for Climate Zone 7, cybersecurity for four platforms, sustainability measures, and comprehensive site improvements including utilities and storm drainage. The anticipated period of performance spans fiscal years 2029 through 2032, with design starting in the first quarter of FY29 and a 24-month construction period beginning in FY30. This current action is a sources-sought effort to gather industry feedback on the most effective project delivery methods, such as CM@Risk or Design-Build, and to evaluate industry capabilities regarding arctic adaptation and schedule risks.
Department Of Defense

POSTED

1 day ago

DEADLINE

in 6 days
View Details