Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

TURTLE CREEK CONSTRUCTION, LLC Kearney NE USA

UEI: SLED_F9F18BC967264811

TURTLE CREEK CONSTRUCTION, LLC Kearney NE USA is a federal contractor, registered under UEI SLED_F9F18BC967264811. It has been awarded $4,000,000 in federal contracts. Primary work spans Plumbing, Heating, and Air-Conditioning Contractors. Top awarding agencies include FA4600 55 Cons Pkp.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_F9F18BC967264811

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

1

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with TURTLE CREEK CONSTRUCTION, LLC Kearney NE USA

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for TURTLE CREEK CONSTRUCTION, LLC Kearney NE USA

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in TURTLE CREEK CONSTRUCTION, LLC Kearney NE USA's top NAICS codes and agencies

NAICS: 238220
New
MJCC EXHAUST FANS BLD. 1429
Solicitation # mjcc-exhaust-fans-bld-1429
Insights Training Group LLC, on behalf of the Muhlenberg Job Corps Center, is soliciting fixed-price quotes from qualified HVAC/mechanical contractors to restore the exhaust fan and louver systems in Building 1429 located in Kentucky. The scope of work includes a variety of repairs across multiple units, specifically replacing the selector switch and motor for Fan 2, relocating the thermostat for Fan 3, replacing the motor for Fan 4, installing a missing motor, blade, and guard for Fan 5, verifying the operation of Fan 6, and replacing the louver actuator for Fan 7. All work must adhere to applicable building codes, manufacturer requirements, and general HVAC practices, with the contractor providing all necessary labor, materials, and disposal. The contract will be awarded to the responsible offeror who provides a technically acceptable quote at the lowest price. Interested parties must submit their proposals by October 30, 2026, including a detailed cost breakdown with line-item pricing for each fan and system-wide components. Required submission documents include evidence of Kentucky state licensing and registration, a completed New Vendor Profile, a W-9, and proof of the ability to secure performance and payment bonding. Compliance with the Davis-Bacon Act and certified payroll wage rate requirements is mandatory, with weekly certified payroll records required for invoice acceptance. Contractors must also provide proof of insurance and maintain Material Safety Data Sheets for all products used on-site. Final acceptance is contingent upon a successful substantial completion walk-through, the delivery of operating manuals, and the provision of lien releases from all subcontractors and suppliers.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 238220
New
MJCC HVAC BLD. 1403-04 B HALL
Solicitation # mjcc-hvac-bld-1403-04-b-hall
Insights Training Group LLC is soliciting fixed-price quotes for the furnishing and installation of two 4-ton twinned split systems using R-454B refrigerant at Building 1403-04 B Hall of the Muhlenberg Job Corps Center in Greenville, Kentucky. The scope of work includes the installation of Trane 17 SEER condensing units, 95% AFUE high-efficiency gas furnaces, matching indoor evaporator coils, new refrigerant line sets, and a Honeywell Pro 8000 programmable thermostat. The project must be completed within 45 days of award, with all work adhering to manufacturer specifications, local codes, OSHA, and EPA regulations. This is a small business set-aside solicitation open to VOSB, SDVOSB, WOSB, and HUBZone certified firms. To be technically acceptable, offerors must provide evidence of Kentucky state licensing and registration, a minimum 90-day bid guarantee, proof of ability to secure performance and payment bonding, a completed New Vendor Profile, and a W-9. Award will be granted to the responsible offeror with a technically acceptable quote and the lowest price. Contractors must comply with Davis-Bacon Act labor standards, requiring the submission of weekly certified payroll and a signed Statement of Compliance with every invoice. Payments are subject to net terms and the reconciliation of payroll records against daily visitor logs. Final acceptance requires a substantial completion walk-through by the center director, verification of proper zoning and temperature control, and the delivery of all training and maintenance manuals. Quotes are due by October 30, 2026, at 5:00 PM via email to mjccpurchasing@insightsllc.net.
Muhlenberg Job Corps Center / Insights Training Group LLC

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 238220
New
CBP#9772 HVAC Air Handling Unit (AHU) and Ductwork Cleaning Services
Solicitation # CBP#9772
Management and Training Corporation (MTC) is soliciting bids for a fixed-price, lump sum subcontracting opportunity to provide comprehensive HVAC air handling unit (AHU) and ductwork cleaning services at the Edison Job Corps Center in Edison, New Jersey. The scope of work involves cleaning twelve AHUs, divided equally between the Kilmer Male and Edison Female dormitories, including all associated supply, return, and outside air ductwork, heating and cooling coils, and air diffusers. The estimated price range for this project is between $100,000 and $250,000. Bidders must provide all labor, equipment, and approved cleaning agents, and are required to submit pre-cleaning inspection reports, operation and maintenance manuals, and manufacturer warranties upon completion. This is a small business set-aside opportunity under NAICS code 238220. To be considered, bidders must complete a mandatory physical site visit and submit their bids by October 16, 2026, at 3:00 PM EST. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, three comparable project references, and a completed supplier self-certification packet including a W-9. For bids equal to or exceeding $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The contract is subject to various Federal Acquisition Regulations and labor standards, including the Davis-Bacon Act and specific wage determinations for building construction in Middlesex County, New Jersey. Contractors must submit weekly certified payroll reports and use AIA G7/02 and G7/03 forms for progress payments. Award decisions will be based on overall best value, with MTC serving as the sole judge of responsiveness. Performance will begin following a Notice to Proceed and a pre-construction meeting to establish the project schedule.
Management & Training Corporation

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 238220
New
CBP6404 Bldg. 63B Drain Replacement
Solicitation # CBP6404
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to perform plumbing services at the San Diego Job Corps Center in Imperial Beach, California. The project, identified as CBP6404, involves repairing three identified root intrusions in the sanitary piping system of the Building 63B student restrooms. The scope of work includes all labor, materials, and equipment necessary for excavation, removing and replacing damaged piping, backfilling, compacting, and restoring concrete surfaces to match existing conditions. The estimated price range for this effort is between $0 and $25,000, with bids due by October 13, 2026. Award will be based on overall best value, and bidders must complete a physical site visit and sign an attendance roster to be considered. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, along with performance and payment bonds upon award. Contractors must comply with Davis-Bacon Act prevailing wage rates for San Diego County and provide weekly certified payroll. Final payment is contingent upon the submission of a Notice of Final Completion, final certified payroll, lien releases, and two sets of Operation and Maintenance manuals. Required submission documents include a detailed cost breakout, a UEI number, and a completed Supplier Self-Certification form.
San Diego Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details
NAICS: 238220
New
International
Contractor Services for Cooling System Upgrade at Whitehorse Correctional Centre
Solicitation # RFB-2026-7-5503
The Government of Yukon, through the Department of Highways and Public Works, is soliciting bids for contractor services to upgrade the cooling system at the Whitehorse Correctional Centre located at 25 University Drive, Whitehorse. This stipulated price contract, based on the CCDC 2 2020 framework and governed by the laws of Yukon, involves comprehensive mechanical, electrical, and structural upgrades. The scope of work includes the installation of LG heat pumps, Trane chillers, Grundfos pumps, and Axiom glycol feed systems, as well as necessary power distribution to new HVAC equipment and structural modifications compliant with applicable building codes. Bids will be evaluated primarily on price, with potential bid value reductions available for registered Yukon First Nation businesses. Requirements for bidders include a bid bond of at least 10 percent of the total bid price and a consent of surety for performance and labour and material payment bonds, each totaling at least 50 percent of the contract value. Due to the nature of the facility, all contractor personnel must obtain WCC security clearance prior to site access. Payments are processed within 28 calendar days following the receipt of a certificate for payment, subject to a 5 percent performance holdback and compliance with the Financial Administration Act of Yukon.
Government of Yukon

POSTED

about 7 hours ago

DEADLINE

in 30 days
View Details
NAICS: 238220
New
SLED
FY27 -01 CIHA Mini -Split Heat Pump Project Unit 821 D Sagebrush Lane Nespelem, WA 99155
Solicitation # FY27-01
The Colville Indian Housing Authority is soliciting quotations for the installation of a mini-split heat pump system at a tenant-occupied single-family home located at 821 D Sagebrush Lane, Nespelem, WA. The scope of work includes the demolition of the existing HVAC system and the installation of a new indoor single-zone wall-mounted air handler, an outdoor inverter heat pump on a new concrete composite equipment pad and mounting stand, a hardwired thermostat, and necessary line-set covers. The contractor is responsible for all electrical work, which must be performed by a licensed electrician in compliance with NEC codes and Washington State L&I permitting requirements. The project must be completed within four consecutive calendar days, and the contractor must ensure tenant privacy and confidentiality throughout the process. Award of the contract is based on price, with a strong preference given to qualified Indian-owned economic enterprises or organizations per the Indian Self-Determination and Education Assistance Act; such entities may be awarded the contract if their bid is reasonable and within 10 percent of the lowest responsive quotation. Contractors must adhere to TERO and TOSHA regulations, provide a TERO Compliance and Utilization Plan, and maintain comprehensive insurance, including Commercial General Liability of at least 1 million dollars. Final acceptance of the work is contingent upon a final inspection by the Contracting Officer and the provision of all warranty and user manuals.
Colville Indian Housing Authority

POSTED

about 13 hours ago

DEADLINE

in 9 days
View Details
NAICS: 238220
New
SLED
FY27 -02 CIHA HVAC System Replacement Project Three (3) Single Family Homes Unit 706 B Bitterroot Lane Nespelem, WA 99155, Unit 714 Bitterroot Lane Nespelem, WA 99155 Unit 1054 Bull Rope Street Omak, WA 98841
Solicitation # FY27-02
The Colville Indian Housing Authority (CIHA) is soliciting quotations for the FY27-02 HVAC System Replacement Project to upgrade systems in three single-family homes located in Nespelem and Omak, Washington. The scope of work requires the contractor to provide all labor and materials to demolish existing HVAC units, install three new heat pumps and three new fan coils, and perform comprehensive duct cleaning, sanitizing, and sealing. Additional requirements include installing new breakers and electrical service in compliance with NEC codes, providing programmable thermostats, and ensuring all exterior wiring is contained in conduit or PVC covers. The contractor is responsible for obtaining all necessary Washington State Department of L&I electrical and low voltage permits and must provide a detailed maintenance schedule along with all warranty and user manuals upon completion. The contract will be awarded based on price, with a strong preference for qualified Indian-owned economic enterprises, which may be awarded the contract if their quote is reasonable and within 10 percent of the lowest responsive bid. Bidders must be registered in the System for Award Management (SAM) and comply with TERO, TOSHA, and Davis-Bacon wage requirements. Required documentation for submission includes a Form of Quote, Non-Collusion Affidavit, HUD Form 5369-A, and a TERO Compliance and Utilization Plan. The contractor must maintain specific insurance coverages, including Commercial General Liability of at least 1 million dollars, and adhere to a strict daily cleanup and disposal plan. Final acceptance of the work is contingent upon a final inspection by the Contracting Officer.
Colville Indian Housing Authority

POSTED

about 13 hours ago

DEADLINE

in 8 days
View Details