Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

VETERANS RANGE SOLUTIONS, LLC Fredericksburg VA USA

UEI: SLED_6A2CD0EE8D1AD5ED

VETERANS RANGE SOLUTIONS, LLC Fredericksburg VA USA is a federal contractor, registered under UEI SLED_6A2CD0EE8D1AD5ED. It has been awarded $70,000,000 across 1 federal contract. Primary work spans Industrial Building Construction. Top awarding agencies include Fci Bastrop.

Contact Information

Registration and classification details

Registration

UEI Code

SLED_6A2CD0EE8D1AD5ED

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

Key Performance Metrics

Awards Count

0

All time

Active

0

Currently performing

Completed

0

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Fci Bastrop$70.0M100%
Awards by NAICS
236210 - Industrial Building Construction$70.0M100%
Awards by Agency Over Time
Awards by Place of Performance

Compete with VETERANS RANGE SOLUTIONS, LLC Fredericksburg VA USA

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for VETERANS RANGE SOLUTIONS, LLC Fredericksburg VA USA

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS

Open opportunities in VETERANS RANGE SOLUTIONS, LLC Fredericksburg VA USA's top NAICS codes and agencies

NAICS: 236210
New
SLED
Design Build Precision Guided Munitions (PGM) Facility Nellis AFB
Solicitation # W912PL26RA022
The U.S. Army Corps of Engineers, Los Angeles District, is soliciting proposals for the design and construction of a Precision Guided Munitions (PGM) Facility at Nellis Air Force Base, Nevada. This firm-fixed-price, single-phase design-build project is a total small business set-aside with an estimated magnitude between 10 million and 40 million dollars. The scope involves the creation of a 14,685 square foot base facility with an option for an additional 1,531 square foot maintenance bay. The high-bay facility will feature reinforced concrete foundations, structural steel frames, fully grouted CMU, and a standing seam metal roof. It is designed to accommodate missile and glide munitions assembly, disassembly, inspection, testing, and repair, including four drive-through work bays, each equipped with a 2-ton overhead bridge crane, a test cell for rocket motors, and secure administrative spaces. The facility must adhere to strict technical and security standards, including DoD Unified Facilities Criteria, Nellis and Creech AFB Installation Facility Standards, and ICD/ICS 705 for secure spaces. Key security requirements include an intrusion detection system, access control, CCTV, and specific cybersecurity protocols for facility systems. The project has a performance period of 730 calendar days following the Notice to Proceed. Award will be based on a best-value tradeoff process, prioritizing the past performance of the prime construction contractor and lead design firm, followed by the technical approach, management plan, and proposed schedule. Eligible offerors must meet CMMC Level 1 requirements and submit their proposals electronically by September 14, 2026.
Bristol Alliance of Companies

POSTED

about 14 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation FA8137-26-R-0040, is a competitive Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for general construction services. The contract supports a broad range of sustainment, maintenance, repair, alteration, and renovation projects for real property facilities at Tinker AFB, Oklahoma. The scope includes three execution methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total aggregate maximum value of 950 million dollars and is structured with an initial five-year ordering period beginning March 26, 2027, followed by a five-year option period. The procurement is a partial small business set-aside under NAICS 236210. Award decisions are based on the Highest Technically Rated Offeror (HTRO) methodology, where candidates must meet a Minimum Technical Threshold Rating (MTTR) of 8,190 points for Appendix C or 7,140 points for Appendix D. Evaluation focuses exclusively on technical experience, including construction and design history, certifications, and staffing, with no cost evaluation performed at the IDIQ level. Contractors are required to provide 100 percent performance and payment bonds for task orders and must adhere to strict TAFB facility standards, safety regulations, and cybersecurity requirements. Proposals must be submitted electronically to the designated MACC Workflow Org Box, and all offerors must maintain active registration in the System for Award Management.
FA8137 Afsc Pzioc

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 236210
New
SLED
Mission San Marcos Industrial Park
Solicitation # SDP22-0009
The Mission San Marcos Industrial Park project, identified by permit application SDP22-0009, involves the redevelopment of a 10.8-acre site at 528 East Mission Road in San Marcos, California. The scope of work includes the demolition of two existing industrial buildings and the construction of three two-story warehouse buildings totaling approximately 132,810 square feet, including ancillary office space. Site improvements feature 141 parking spaces, 14 truck-loading bays, landscaping, lighting, and utility connections. Additional requirements include frontage improvements along East Mission Road, the relocation of a bus stop, the dedication of a bicycle path easement, and the installation of a public storm drain easement along the eastern boundary. The project is managed by the City of San Marcos as the lead agency with Caprock Partners as the applicant. Comprehensive technical evaluations have been conducted, including a Mitigated Negative Declaration for environmental impacts, a Phase II Environmental Site Assessment identifying historical industrial contaminants, and studies on geology, paleontology, and archaeology. Transportation analysis includes a Vehicle Miles Traveled study and a Transportation Demand Management Plan to reduce single-occupant vehicle use. The project must adhere to ADA accessibility standards and Title VI civil rights requirements. Final acceptance of water and sewer facilities is contingent upon Board approval, and the project requires specialized oversight from a corrosion engineer and a project paleontologist during excavation.
City of San Marcos

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 236210
New
SLED
U-01-06 Amendment #2 (HD Ranch Biogas Facility)HD Ranch is seeking Amendment #2 to Use Permit U-01-06 to construct and operate a biogas upgrading and trucking station at its dairy facility located near Dixon in Solano County, California. The project involves the installation of a covered anaerobic digester and a biogas conditioning plant designed to capture biogas from dairy operations and convert it into renewable natural gas for use as transportation fuel. The development will result in approximately 191,000 square feet of ground disturbance across the 621-acre site and includes the installation of essential electrical, control, pressure relief, and leak detection systems. The facility is expected to produce energy exceeding its own consumption and will support an average of one biogas transport truck trip per day. The project is being managed by the Solano County Department of Resource Management, with Travis Kroger serving as the Senior Planner. Environmental reviews have been conducted under CEQA guidelines, resulting in a Mitigated Negative Declaration which concludes that significant environmental effects can be avoided through specific mitigation measures. The project adheres to the California Green Building Standards Code, Title 24 of the California Code of Regulations, and state policies including SB 100 and Executive Order B-55-18. A public review period was established from September 11 to October 11, 2026, to gather community input before the final adoption of the permit amendment.
California Solano County, Resource Management Department of

POSTED

2 days ago

DEADLINE

N/A
View Details