Tinker AFB 2026 Multiple Award Construction Contract (MACC)

Open
FA8137-26-R-0040Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation FA8137-26-R-0040 is a competitive Request for Proposal for a Multiple Award Construction Contract (MACC) to provide general construction services at Tinker Air Force Base, Oklahoma. This Indefinite Delivery Indefinite Quantity (IDIQ) vehicle has a total aggregate maximum value of $950,000,000 and a performance period consisting of a five-year base period with one five-year option. The scope of work encompasses a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects. Project execution will be categorized into three methods: Design-Build, Construction with Limited Design, and Construction Only. The procurement is divided into a Small Business set-aside pool and a Full and Open pool. Award decisions are based on the Highest Technically Rated Offeror (HTRO) methodology, utilizing a Minimum Technical Threshold Rating (MTTR) of 8,190 points for the Small Business pool and 7,140 points for the Full and Open pool. Evaluation is based solely on technical experience, including relevant construction and design experience, certifications, and staffing, with no cost evaluation performed at the IDIQ level. Contractors are required to adhere to strict technical and safety standards, including the Tinker AFB Facility Standard 2020 Edition, OSHA regulations, and ADA requirements. Key administrative requirements include the use of Wide Area Workflow (WAWF) for invoicing, CMMC Level 1 certification for the initial award, and the provision of 100 percent performance and payment bonds. Following several amendments to address RFIs and finalize documentation, the final proposal response deadline was extended to November 16, 2026.

General Info

$950M MACC for general construction services at Tinker Air Force Base, Oklahoma.

NAICS

236210 - Industrial Building Construction

Place of Performance

OK, 73145, USA

Set-Aside

partial-small-business

Documents

54
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first255 pages · general-requirements
High
PDF, High priority: read this first2 pages · cdrl
High
PDF, High priority: read this first2 pages · cdrl
High
PDF, High priority: read this first2 pages · cdrl
High
PDF, High priority: read this first2371 pages · specifications
High
PDF, High priority: read this first73 pages · specifications
High
PDF, High priority: read this first115 pages · specifications
High
PDF, High priority: read this first10 pages · evaluation-criteria
High
XLSX, High priority: read this first9 pages · scoring-matrix
High
XLSX, High priority: read this first9 pages · self-scoring-matrix
High
PDF, High priority: read this first82 pages · rfp
High
PDF, High priority: read this first82 pages · amendment
High
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this first82 pages · rfp
High
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this first3 pages · amendment
High
XLSX, High priority: read this first1 page · self-score-sheet
High
PDF, High priority: read this first82 pages · rfp
High
XLSX, High priority: read this first63 pages · q-and-a
High
PDF, High priority: read this first22 pages · rfp
High
PDF, High priority: read this first22 pages · rfp
High
PDF, High priority: read this first22 pages · rfp
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first82 pages · rfp
High
PDF, High priority: read this first82 pages · rfp
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this first82 pages · rfp
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this first82 pages · rfp
High
PDF, High priority: read this first51 pages · sow
High
PDF, High priority: read this first13 pages · sop
High
PDF, High priority: read this first9 pages · instruction
High
PDF, High priority: read this first58 pages · sow
High
PDF, High priority: read this first210 pages · facility-standard
High
PDF, High priority: read this first89 pages · instruction
High
DOCX, High priority: read this first3 pages · work-sample
High
PDF, Low priority4 pages · other
Low
PDF, Low priority250 pages · instruction
Low
PDF, Low priority13 pages · instruction
Low
PDF, Low priorityother
Low
PDF, Low priority1 page · other
Low
PDF, Low priority1 page · other
Low
XLSX, Low priority2 pages · supporting-document
Low
XLSX, Low priority1 page · appendix
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

11 updates
PhaseSolicitation
Posted

Solicitation

Notice updated

Response deadline changed from Aug 12, 2026 to Sep 11, 2026. Set-aside changed from Partial Small Business Set-Aside (FAR 19.5) to Small Business Set Aside - Partial. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 11, 2026 to Sep 25, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 25, 2026 to Oct 13, 2026. The notice description changed.

Notice updated

Response deadline changed from Oct 13, 2026 to Oct 28, 2026. The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Oct 28, 2026 to Nov 16, 2026.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA
Contacts

Full Description

Show more

October 22, 2026


Please see amendment 0006 attached.  Complete RFI responses and documents will be posted at a later date.


October 7, 2026


The government is still working through RFI followup responses and the subsequent amendment.  This amendment adjusts the proposal due date to 28 October, 2026, while the government finalizes documents.


September 23, 2026


The government is sitll working through RFI followup responses and the subsequent amendment.  This amendment adjusts the proposal due date to 13 October, 2026, while the government finalizes documents.


September 16, 2026


Complete RFI responses posted.  Followup questions related to these RFIs can be submitted by September 21 at noon CST.  The government is not accepting new questions.  Any question submitted must be tied to an answer provided in the attachment.  The proposal due date will remain unchanged but the government will continue to monitor the need to extend.


September 10, 2026


It was brought to the government's attention that previous solicitation amendments cannot be accessed.  They now have been activated and are accessible.


September 3, 2026


Amendment posted with updated Proposal due date, please see attachment.  The government is still working to answer all RFIs.


August 25, 2026:


See attachment for a complete list of RFIs received to date.  Some have already been answered, and the government is working to answer the rest.  The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry. 


August 19 2026:


Please see amendment 0002 attached and an updated Section L.


August 11 2026:


1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026.


2. The government is accepting RFIs until 21 August at 3PM EDT.  If you have already sent your RFIs to the POCs you do not have to resubmit them.  


4 August 2026: 


Please see the attached RFP (FA8137-26-R-0040) and all attachments.



---------------------------------------------------------------------------------------------------------------


THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation 


Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals.


Project execution methods will fall into one of the following classifications.  The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. 


Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government.  The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed.  These documents will be equivalent to a schematic 15% or greater design.  When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government.


Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project.  This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted.  The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project.  These documents will be equivalent to a design submittal 35% to 65%.  When awarded the TO the Contractor will complete any additional design efforts required by the project and produce a set of working documents for use during construction. 


Construction only method will include the Government providing 100% design package, including the SOW, drawings, specification, and any other documents as necessary to establish requirements for the work to be accomplished.  When awarded the TO the Contractor shall commence with construction in accordance with the design and contract requirements. 


The Contractor is required to furnish all materials, labor, plant, tools, transportation, equipment, testing services, quality control, and incidentals necessary to provide a complete useable end product as specified in the TO/project documents.


The North American Industry Classification System (NAICS) Code is 236210, Industrial Building Construction with a small business size standard of $45 million. 


The MACC will be executed for one base period of five (5) years with one option period of five (5) years.  


The Government will negotiate equitable adjustments resulting from change orders in the shortest practicable time.  Approximately 120 days are required to definitize equitable adjustments associated with change orders for construction.  The definitization of an equitable adjustment begins when the contracting officer receives an adequate change order definitization proposal and ends when the contracting officer executes a contractual action to definitize the change order. 


IMPORTANT NOTICE: Offerors are required to complete their registration in the System for Award Management (SAM) database via the website https://www.sam.gov.  Offerors are strongly encouraged to review their informaiton in SAM to validate that it is current and up to date.  Failure to do so could result in the offeror being ineligible for award of Department of War contracts IAW RFO 4.203-1 registered in SAM database.


DISCLAIMER: The information being requested does not constitute a commitment on the part of the Government to award a contract, nor to pay for any costs incurred as a result of replying to this notice.  This notice should not be construed as a commitment by the Government for any purpose. 

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
F-15EX 8-Bay Maintenance Hangar Complex-Industry Day
Solicitation # W50S8527H1CU0
The National Guard Bureau is seeking market intelligence and industry capability assessments for the construction of an F-15EX 8-Bay Maintenance Hangar Complex at Selfridge Air National Guard Base in Harrison Township, Michigan. This project, estimated between 150 million and 200 million dollars, involves the creation of an environmentally safe and energy-efficient complex to support 21 Primary Aircraft Authorization F-15 EX aircraft. The scope includes the demolition of buildings 3, 5, 117, and 120, the construction of new parking, and necessary utility and infrastructure upgrades. The facility will be developed in three phases: Hangar 1 for corrosion control and fuel cell maintenance, Hangar 2 as a 4-bay maintenance hangar, and Hangar 6 for munitions and training. The government is considering a fixed-price Other Transaction Agreement under 10 U.S.C. section 2808a, with funding potentially phased at approximately one-third of the total cost per fiscal year. Design completion is anticipated for early 2027. All construction must adhere to DoD, Air Force, and base design standards, including strict antiterrorism, force protection, and flood plain requirements. Interested firms must provide information regarding their bonding capacity, experience with mission-critical operational facilities, and potential labor constraints. An Industry Day is scheduled for December 8, 2026, at the Selfridge Air National Guard Base Dining Facility, with registration required for up to three participants per company.
W7NF Uspfo Activity Miang 127

POSTED

4 days ago

DEADLINE

in 23 days
View Details

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 236220
New
Federal
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation # FA813727R0002
This hybrid design-build project involves the installation of the React VII Facility in Building 9001, Post V19, at Tinker Air Force Base, Oklahoma. The contractor is responsible for providing all design, materials, labor, equipment, and quality control necessary to deliver a complete and fully operating system. The scope includes architectural and structural work, HVAC system installation and commissioning, plumbing, electrical panel updates, and the installation of specialized components such as helical piles, fire protection wet pipe sprinkler systems, and steel doors and windows. All work must adhere to Tinker AFB Facility Standards and various Unified Facilities Criteria, with a strong emphasis on environmental compliance, hazardous material management, and strict safety protocols. This solicitation is set aside exclusively for SBA Certified Women-Owned Small Businesses (WOSB). Award will be based on the Lowest Price Technically Acceptable (LPTA) basis, requiring a low-risk technical approach and a realistic construction schedule that meets the mandatory completion date. The period of performance for the primary line items is 240 calendar days from the notice to proceed. Proposals must include a technical volume detailing the on-site management approach and a cost proposal provided as an electronic cost model breakdown in Microsoft Excel format. The final response deadline is November 23, 2026, at 2:00 pm.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 15 days
View Details
NAICS: 236220
Federal
2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221
Solicitation # FA813726R0021
Solicitation FA813726R0021 is a firm-fixed-price, design-build construction project at Tinker Air Force Base, Oklahoma, specifically for Building 3221. The scope of work involves the removal and replacement of fire sprinklers within plasma booth dust collectors and the complete replacement of the building fire alarm system. This effort is a 100 percent small business set-aside and is restricted exclusively to current Tinker AFB MACBOA holders under NAICS 236220. The project requires a mandatory performance period of 300 calendar days, starting within 10 days of the notice to proceed. The government is utilizing a two-step sealed bidding process. Step one requires prime contractors to attend a mandatory site visit and submit a technical proposal without pricing; only those found technically acceptable proceed to step two. In the second step, eligible offerors submit a price bid, and the award is granted to the lowest evaluated priced proposal that meets all technical and responsibility standards. Key requirements include the submission of bid, performance, and payment bonds, as well as compliance with the Buy American Act and specific cybersecurity standards. Invoicing and payments are processed electronically through the Wide Area WorkFlow system.
Commercial and Institutional Building Construction

POSTED

10 days ago

DEADLINE

in about 2 months
View Details
NAICS: 238190
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

23 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS