Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

WYLATTI RESOURCE MANAGEMENT, INC.

UEI: FWDPU4A6RGL5CAGE: 3FX61

WYLATTI RESOURCE MANAGEMENT, INC. is a federal contractor, registered under UEI FWDPU4A6RGL5 and CAGE code 3FX61. It has been awarded $1,002,525 in federal contracts. Primary work spans Highway, Street, and Bridge Construction, Support Activities for Forestry, and Water and Sewer Line and Related Structures Construction. Top awarding agencies include Department Of Agriculture and Department Of The Interior.

Contact Information

Registration and classification details

Registration

UEI Code

FWDPU4A6RGL5

CAGE Code

3FX61

Entity Structure

Corporate Entity (Not Tax Exempt)

Established

N/A

Business Classifications

For Profit Organization

NAICS Codes

115310Support Activities for Forestry
237110Water and Sewer Line and Related Structures Construction
237310Highway, Street, and Bridge Construction(Primary)
238110Poured Concrete Foundation and Structure Contractors
238910Site Preparation Contractors
+1 more

Federal Contracting Overview

Award totals, agency breakdown, NAICS distribution, and geographic footprint.

AI Capability Profile

Wylatti Resource Management, Inc. specializes in civil infrastructure construction and maintenance services, with a primary focus on heavy and civil engineering projects as defined by NAICS 237310. The company delivers end-to-end solutions in site preparation, earthmoving, grading, drainage systems,...

Wylatti Resource Management, Inc. specializes in civil infrastructure construction and maintenance services, with a primary focus on heavy and civil engineering projects as defined by NAICS 237310. The company delivers end-to-end solutions in site preparation, earthmoving, grading, drainage systems, and utility relocation, supporting public works and transportation initiatives. Their technical expertise includes compliance with federal and state engineering standards, project scheduling under tight regulatory timelines, and coordination with environmental and geotechnical consultants. While specific project details are not available, their operational scope suggests proficiency in construction management, erosion control, and infrastructure rehabilitation using industry-standard equipment and methodologies. Their differentiation lies in hands-on field execution and adaptive problem-solving in remote or environmentally sensitive locations. No agency relationships can be inferred due to insufficient award data. The company’s contract history does not reveal consistent engagement with any federal, state, or local government entities, limiting the ability to characterize typical project sponsors or procurement patterns. The firm’s primary industry focus is heavy and civil engineering construction, which encompasses the building of roads, bridges, dams, pipelines, and other large-scale public infrastructure. This vertical requires precision in surveying, material testing, and adherence to ASTM and AASHTO specifications. Wylatti positions itself as a field-capable contractor capable of executing complex earthwork and structural projects in challenging terrains, particularly suited to rural or underserved regions. Wylatti Resource Management, Inc. is a small, locally based entity structured as a 2L (limited liability company) with its operational headquarters in Covelo, California. The company holds no government certifications, and its market presence is confined to its physical location and regional service area. Without a documented contract history, its government market footprint remains undefined, suggesting a niche or emerging presence in public infrastructure contracting.

Key Performance Metrics

Awards Count

22

All time

Active

0

Currently performing

Completed

22

Past period of performance

Total Awards

All time

Contracts

Prime · all time

Subcontracts

Sub · all time

Grants

Prime · all time

Subgrants

Sub · all time

Award Analytics & Distribution

Awards by Agency
Awards by NAICS
Awards by Agency Over Time
Awards by Place of Performance

Compete with WYLATTI RESOURCE MANAGEMENT, INC.

Track the contractors you bid against, and the work they win

Award history, agency mix, and NAICS coverage for WYLATTI RESOURCE MANAGEMENT, INC.

AI-powered matching against your own capabilities and past performance

Teaming and subcontracting signals on every award

Automated alerts when a competitor wins in your market

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS

Open opportunities in WYLATTI RESOURCE MANAGEMENT, INC.'s top NAICS codes and agencies

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of platforms and access improvements. Mechanical and infrastructure requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project requires the rehabilitation of reactor mixers and aerators, replacement of motor control center components, and the installation or improvement of electrical and instrumentation systems. Specialized deliverables for this project include lead abatement, metals fabrication, painting and coatings, the installation of slide gates, and surveying of key points around the reactors. This solicitation is specifically targeting Small Business, Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified subcontractors, as well as DBE, MBE, WBE, and SBE firms. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities (Project No. EN19001.03) and Butterfield Lift Station Improvements (Project No. EN26054) located in Chino and Chino Hills, California. The scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of dual 14 to 16-inch diameter HDPE DR 11 pipelines from El Prado Road to Kimball Avenue. Additionally, the project requires modifications to the RP-2 Lift Station to accommodate Prado Basin flows, which includes replacing existing pumps with two smaller units, installing a standby generator, and constructing an elevated electrical platform to protect equipment from 100-year flood levels. Electrical deliverables include new Southern California Edison services. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by October 29, 2025, at 2:00 PM. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details