10,000 PSI Self-Consolidating Concrete (SCC) Supplier

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the supply of 10,000 PSI self-consolidating concrete for prime contractors working on US Army Corps of Engineers ERDC projects located at Fort Polk. The supplier is responsible for providing specific mix designs that achieve the required strength and delivering the ready-mix concrete directly to the site. The scope of work includes supporting on-site verification of plastic concrete properties through slump flow, T-50, T-90, and J-Ring testing. Additionally, the supplier must cast test cylinders for field-curing and subsequent laboratory delivery to ensure quality compliance.

General Info

Supplier provides 10,000 PSI self-consolidating concrete and quality testing for Fort Polk projects.

NAICS

327320 - Ready-Mix Concrete Manufacturing

Place of Performance

Fort Polk, LA, 71459, USA

Set-Aside

NONE

Documents

This scope was carved out of W912HZ27X1CTB.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Request for Information for On-Site Fabrication and Assembly of a Three-Bay High-Performance Magazine (HPM) Structure

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2R2 USA Engr R & D Ctr
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies 10,000 PSI self-consolidating concrete (SCC) for prime contractors on US Army Corps of Engineers ERDC projects. Provides mix designs achieving 10,000 PSI and supports on-site verification of plastic concrete properties including slump flow (ASTM C1611), T-50, T-90, and J-Ring (ASTM C1621) tests. Delivers ready-mix SCC to site and casts test cylinders for field-curing and lab delivery.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → W2R2 USA Engr R & D Ctr

Same awarding agency

NAICS: 238120
New
Federal
Request for Information for On-Site Fabrication and Assembly of a Three-Bay High-Performance Magazine (HPM) Structure
Solicitation # W912HZ27X1CTB
The U.S. Army Corps of Engineers Engineer Research and Development Center is issuing a Request for Information to identify US-based contractors capable of the on-site fabrication and assembly of a three-bay, monolithic reinforced concrete High-Performance Magazine (HPM) test structure. Located at Range 19, Fort Polk, Louisiana, this project requires the full in-situ assembly of the structure, including the procurement and installation of Grade 60 reinforcing steel, 10,000 PSI self-consolidating concrete, and structural sand fill with a density of 100 PCF. The scope encompasses the entire process from mobilizing equipment and erecting engineered formwork to the final curing and finishing of the structure, which is intended for experimental purposes and will eventually be destroyed. Interested respondents must provide a comprehensive capabilities statement, project experience from the last seven years, and specific technical details regarding their approach to high-strength self-consolidating concrete and complex formwork systems. The anticipated contract will be awarded as a firm-fixed-price agreement, with a performance timeline requiring all site activities to be completed within 240 days of the award. Strict quality standards are mandated, including specific tolerances for dimensions and thicknesses, as well as mandatory inspection hold points coordinated through a Government Technical Point of Contact. Responses to this RFI are due by November 4, 2026, and are intended for market research and planning purposes only.
Structural Steel and Precast Concrete Contractors

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS