Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

10" Carbon Steel Pipe and Fittings Supplier

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of Defense → W071 Endist PortlandView Agency

NAICS

332996 - Fabricated Pipe and Pipe Fitting ManufacturingView NAICS

Place of Performance

Lowell, OR, USA

Set-Aside

SBA

Documents

This scope was carved out of W9127N26QA155.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

LOP Fire Protection and Unwatering Pump System

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W071 Endist Portland
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies heavy-wall carbon steel piping and flanged fittings for prime contractors on US Army Corps of Engineers (Portland District) projects. Supplies 10-inch diameter Schedule 40 carbon steel pipe, slip-joint/dresser couplings, slip-on raised face flanges, and short radius flanged-end 90-degree elbows per ASME B16.5, ASTM A53/A53M, ASTM A105/A105M, and ASME B31.3. Delivers 40 LF of pipe and associated fittings.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 333914
New
Federal
LOP Fire Protection and Unwatering Pump System
Solicitation # W9127N26QA155
Solicitation W9127N26QA155 is a total small business set-aside for the procurement of a new Fire Protection and Unwatering Pump System for the Lookout Point Powerhouse in Lowell, Oregon. Issued by the U.S. Army Corps of Engineers, Portland District, this firm-fixed-price contract is necessary to maintain critical fire protection systems during a deep drawdown of the reservoir. The scope of work includes the delivery of a 50HP nominal vertical pump/motor assembly, a 0.25 HP jockey pump system, a fire pump controller panel with remote monitoring, a manual transfer switch, overload protection, and various carbon steel piping components, including valves and flanges. All equipment must adhere to AWWA E103, HI 9.1-9.5, NFPA 20, UL 218, and NFPA 70/NEC standards. The government will award the contract to a responsible contractor based on technical compliance, past performance, and price. Deliveries are required on or before March 1, 2027, with shipping terms set as FOB Destination. Offerors must be registered in the System for Award Management and provide detailed technical documentation, including cut-sheets and O&M manuals, with their quote package. The submission deadline is September 4, 2026, at 10:00 AM, with quotes submitted via email to the primary point of contact, Aragon Liebzeit. Additional requirements include compliance with Buy American standards, cybersecurity reporting under DFARS 252.204-7012, and the provision of manufacturer certifications regarding design tests within 30 days of award.
Measuring, Dispensing, and Other Pumping Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 333415
New
Federal
Lookout Point Powerhouse Drawdown Transformer Cooling Water Supply
Solicitation # W9127N26QA125
Solicitation W9127N26QA125 is a total small business set-aside issued by the U.S. Army Corps of Engineers, Portland District, for the procurement of a 20-ton closed-loop refrigerated water chiller system. The system is required to maintain transformer cooling and fire protection at the Lookout Point powerhouse in Lowell, Oregon, during a deep reservoir drawdown scheduled from October to February. The technical requirements specify a 75 kW system capable of circulating water at 120 gpm and maintaining a maximum cooled water temperature of 80 degrees Fahrenheit in ambient temperatures ranging from -20 to 120 degrees Fahrenheit. The procurement includes the chiller, a minimum 200-gallon maintenance tank, circulation pumps, integrated controls, and associated 3-inch carbon steel piping and valves. The contract requires the system to be IP65 rated and fit within a 20 by 14 foot area with concrete seismic anchorage. All equipment must be standard commercial cataloged products, factory leak-tested and charged, and delivered with electronic and hardcopy operation and maintenance manuals. Delivery is required by March 1, 2027, with FOB Destination terms. Award decisions will be based on technical compliance, past performance, and price. Offerors must be registered in the System for Award Management and provide pricing on Standard Form 1449. The procurement adheres to various federal regulations, including the Buy American program, MIL-STD-130 for item identification, and DFARS cybersecurity and telecommunications prohibitions.
Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing

POSTED

1 day ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
Federal
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement
Solicitation # W9127N26BA024
The Department of Defense, through the W071 Endist Portland office, is soliciting bids for the Bonneville Lock and Dam Navigation Lock 1 Bridge Replacement project in Cascade Locks, Oregon. This total small business set-aside project involves replacing the existing bridge with a new single-span steel girder bridge featuring a concrete deck, four built-up steel plate girders, and a width of 34 feet 4.5 inches. The new alignment will be located immediately downstream of the current bridge, providing increased under clearance over the navigation channel. Construction includes a concrete stub abutment with spread footing anchored into rock for the north side and a concrete abutment supported by drilled shafts for the south side, along with new approach roadways. The scope of work requires the partial demolition of the existing bridge to mitigate seismic hazards and the removal of lead and asbestos. Because the existing bridge provides critical vehicular access that must remain open throughout the project, the contractor will likely need to execute the work in phases. Performance requirements include adhering to environmental and seasonal restrictions and conducting barge crane lifting in close proximity to high voltage power lines. The solicitation, identified as W9127N26BA024, has a response deadline of September 18, 2026. Government Furnished Information regarding power line layouts has been provided, though the solicitation plan set takes precedence over such data.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
John Day Dam Fish Pump Rehabilitation Project
Solicitation # W9127N26BA031
The John Day Fish Pump Rehabilitation Project, solicitation W9127N26BA031, is a total small business set-aside effort managed by the Department of Defense and the W071 Endist Portland. Located at the John Day Lock and Dam in Rufus, Oregon, the project involves the removal, refurbishment, and replacement of major components for fish pump units, specifically focusing on the South Fish Ladder Units 1 and 2. The scope of work includes the procurement and installation of a new right-angle drive gearbox, new pump shafts, and bearings featuring greaseless liners. The project requires both off-site fabrication and on-site installation, with a preliminary performance window for Unit 2 scheduled from December 1, 2026, to November 26, 2027. The estimated magnitude of construction is between 5,000,000 and 10,000,000 dollars under NAICS code 237990. Key deliverables include the hardware, a complete set of gearbox lube system spare parts, and comprehensive documentation such as operation and maintenance manuals and design calculations. All work must adhere to manufacturer specifications, particularly regarding pump shaft re-balancing and system alignment. The contractor must perform pre-test inspections and final testing before returning the pump to the project. Bids are due by September 11, 2026, at 9:00 PM PDT, with a bid opening scheduled for September 14, 2026, at 10:00 AM PDT. To access controlled unclassified information attachments, interested parties must provide a CAGE code and verify a minimum CMMC Level 1 Self verification.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 13 days
View Details