This Solicitation opportunity from Department Of Defense was posted on August 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

17--JACK,AIRCRAFT LANDI

Closed
N0038326RPA69Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336413
New
Federal
RECOVERY SEQUENCER,
Solicitation # SPRPA127QYA44
Solicitation SPRPA1-27-Q-YA44 is issued by the DLA Aviation office in Philadelphia under Emergency Acquisition Flexibilities for the overhaul, upgrade, repair, testing, and inspection of one Recovery Sequencer, identified by NSN 1680-99-753-8672 and Part Number MBEU241040. The contractor, identified as Martin-Baker Aircraft Company Limited in the United Kingdom, is responsible for providing all necessary facilities, labor, materials, and tooling to return the item to a Ready For Issue condition in accordance with the latest technical publications. The scope includes strict adherence to configuration management, quality systems meeting ISO 9001/SAE AS9100 standards, and specific protocols for handling items that are Beyond Economical Repair or Missing on Induction. The government intends to make a single award based on a trade-off between price and past performance, with past performance weighted as more important. Deliveries are required within 90 days on an FOB Destination basis, with inspection and acceptance occurring at the origin using the contractor's equipment. Packaging must comply with MIL-STD-2073 and marking must follow MIL-STD-129, including specific DLR labeling requirements. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with Buy American and specialty metals restrictions. All repairs must be performed at the identified facility in the United Kingdom, and any deviations from approved procedures require formal government acceptance.
Pa DLA Aviation At Philadelphia

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation NO0383-26-R-PA69, issued by NAVSUP Weapon Systems Support Philadelphia, is for the procurement of one Aircraft Landing Jack (NSN IRW 1730-00-854-2237 SX). The contract requires the item to be manufactured and inspected according to Columbus Jack Corporation drawing 00994 (CJ67D0250-1). The award will be made to a single, technically acceptable offeror based on a trade-off between past performance and price, with past performance designated as the primary evaluation factor. The contractor is subject to rigorous quality assurance requirements, including 100% mandatory inspection by the Procurement Contracting Officer at the source, overseen by a DCMAO Quality Assurance Representative. Critical characteristics require 100% inspection, and all welds must undergo non-destructive testing via dye penetrant or magnetic particle methods. The contract mandates a First Article Test (FAT) for one unit, requiring a 14-day notice prior to testing and a report submission within 15 days of completion. Technical specifications emphasize strict welding standards in accordance with AWS D1.1, D1.2, D1.3, and D1.6, with specific requirements for aluminum filler materials and chemical deoxidizing processes. Packaging must comply with MIL-STD-2073-1, and marking must adhere to MIL-STD-129 and MIL-STD-130 for unique item identification. Administrative requirements include the use of the Wide Area Workflow (WAWF) system for invoicing and payment, and compliance with Buy American and Trade Agreements regulations.

General Info

Procurement of one Aircraft Landing Jack with strict quality and inspection requirements.

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

PA

Set-Aside

NONE

Documents

4

Amendment 0001 to Solicitation NO03383-26-R-PA69

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation NO0383-26-R-PA69

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation NO00383-26-R-PA69

PDF, High priority: read this firstamendment
High

Solicitation NO0383-26-R-PA69

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Type Changed

Solicitation → Presolicitation

Type Changed

Presolicitation → Solicitation

Deadline changed

Response deadline changed from Oct 30, 2026 to Aug 13, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Office AddressPHILADELPHIA, PA, 19111-5098, USA
Contacts

Full Description

Show more
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8||||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26||||||||||||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving report combo||TBD|N00383|TBD|TBD|See Schedule|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Columbus Jack Corporation; drawing number ( ;00994; ) ;CJ67D0250-1; , Revision ;LATEST; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 Welding and welder qualifications shall be in accordance with AWS D1.1 for steel, AWS D1.2 or MIL-W-22248,Class 4 for aluminum, AWS D1.3 for sheet steel and AWS D1.6 for stainless steel. Proper controls shall be used to prevent melt through or burn through. For aluminum, filler for welding 6061 alloy shall be 4043: filler for welding 5000 series alloys to themselves or to 6061 shall be 5356 or 5556. In addition,welding and weld inspection shall include: (1) Visual inspection shall include 5X (5power) magnification when a suspect condition is to be examined beyond the capability of normal vision. (2) Critical and major welds may be subjected to further non destructive testing (such as dye penetrant inspection)as prescribed by the buying activity. (3) Proper documentation shall be available for review by Government personnel. 3.2 WORK INSTRUCTIONS. Work instructions shall be posted at theoperator's work station giving procedures to control the welding process, i.e., filler material, weld size, electrical and gas characteristics, including flow rate. 3.3 MATERIALS AND MATERIALS CONTROL. The quality program shall assure that the materials used in fabrication or processing, i.e., base metals and weld filler material, be inspected and conform to the applicable physical, chemical and other technical requirements (supplier's certification is sufficient). 3.4 CONTROLS. Weld filler materials shall be clearly identified and segregated from each other both when in storage and at the work station. Work station environment shall be controlled to prevent conditions adverse to proper gas shielding. 3.5 CLEANING. Parts to be welded shall be cleaned to remove surface soils such as oils, waxes, grease, inks, etc. except that uninhibited alkaline solutions such as sodium hydroxide shall NOT be used. 3.6 DEOXIDIZING. The cleaned parts shall be chemically deoxidized NO MORE THAN 10 DAYS PRIOR TO WELDING to remove thick surface oxide films. (If the material or work is exposed to an outdoor environment, this time limit shall be reduced to a maximum of 3 days, to account for atmospheric effects.) Mechanical cleaning methods shall be applied just prior to the actual start of welding, to remove any reoxidation or residual thin oxide films. 3.6.1 CHEMICAL TREATMENT. An acid deoxidizing treatment shall be applied by either immersion or brushing/wiping. Deoxidizers acceptable for use shall include nitric acid, sulfuric chromic, phosphoric chromic, or equivalent solutions. Sodium hydroxide solutions shall not be used. Care shall be taken to assure 100% solution coverage of the area to be welded. To allow an adequately sized deoxidized area for good welding, the solution shall be applied to an area extending at least 2 inches from the weld site, or ending at any closer adjacent edge. 3.6.2 MECHANICAL MEANS. Immediately prior to welding, mechanical cleaning methods shall be applied to the weld areas previously chemically treated to assure removal of residual or reformed oxides, if any. Acceptable methods of mechanical cleaning include stainless steel wire brushing, scraping, filing, or sanding. However, abrasives containing iron and its oxides, steel wool and wire, and copper alloy based wire, which may become embedded with galvanically active metals and accelerate corrosion of aluminum alloys shall NOT be used. Mechanical methods shall be vigorous enough to adequately remove any residual oxide films, but gentle enough to avoid forming an excessively rough surface in the comparatively soft metal underneath. 4. QUALITY ASSURANCE 4.1 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;a pco mandatory inspection of 100% is required on all items for compliance to drawings, specifications, dimensions, and general workmanship. any deviation will be cause to reject the piece. each and every weld must be NDI tested by either dye penetrant or magnetic particle method. the inspection results of each inspection of each weld must be witnessed by the dcm(QAR) and a test report of results submitted by the QAR. Any weld that fails NDI inspectionwill be cause to reject the piece.; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.2 SPECIAL INSPECTION REQUIREMENTS ( ;x; ) MAGNETIC PARTICLE INSPECTION ( ;x; ) SURFACE INSPECTION ( ;x; ) PENETRANT INSPECTION ( ;; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.3 CRITICAL MANUFACTURING PROCESSES ( ; ; ) HEAT TREAT ( ;x; ) WELDING ( ; ; ) CADMIUM PLATING ( ; ; ) ENGINEERING CHROME PLATING ( ; ; ) NICKEL CHROME PLATING ( ; ; ) CASTING(S) ( ; ; ) FORGING(S) ( ; ; ) MPR (MATERIAL PROCESSING REQUIREMENTS) 4.4 The test to be performed under the First Article approval clause (FAR 52.209-3) of the contract are listed below 4.4.1 Dimensional test (special) ;Nominal tolerances; 4.4.2 Requirements of: ;Applicable drawings; 4.4.3 Form ;Applies; 4.4.4 Fit ;Applies; 4.4.5 Function ;Applies; 4.4.6 Compliance with drawing ( ;MILJ26013; ) ;N/A; , Revision ;N/A; and specifications referenced therein. 4.5 In addition to the above tests, the First Article(s) to be inspected hereunder shall also be subjected to those tests which will demonstrate that the article(s) comply with the contract requirements 4.6 The contractor shall be responsible for providing the necessary parts and repair of the First Article Sample(s) during inspection 4.7 The contractor shall notify the PCO, ACO, and QAR fourteen (14) days prior to conducting the First Article test so that the Government may witness such testing. 4.7.1 The QAR shall be present to witness all First Article Testing. 4.7.2 The following additional personnel shall witness the First Article Testing: ; ; 4.8 Disposition of FAT samples 4.8.1 ; ; Sample(s) may be destroyed during testing. 4.8.2 ;APPLIES; Unless otherwise provided for in the contract, sample(s) shall remain at the contractor and may be considered as production items under the contract provided the sample(s) can be refurbished to ready for issue condition and provided the sample(s) have inspection approval of the cognizant DCMC QAR. Sample(s) may be shipped as production items only after all other units required under the contract have been produced and are ready for shipment. 4.9 Test Sample Coating Instructions 4.9.1 Samples are to be unpainted. Corrosive areas are to be coated with a light preservative if required. 4.10 Notice to Government of Testing at the contractors facility. 4.10.1 FAR 52.209-3 applies (A) The contractor shall present ;ONE; ; unit(s) of the following CAGE( ;1HBK1; ; ), Part Number ;MILJ26013; ; , Revision ;N/A; ; as specified in this contract. At least fourteen (14) calendar days before the beginning of the First Article testing, the contractor shall notify the contracting officer, in writing, of the time and location of the testing so that the Government may witness the tests. (B) The contractor shall submit the First Article Test Report within 15 calendar days from the date of testing to: ;PCO; ; The contractor shall mark the report "First Article Test Report" and cite the contract number and lot/item number. Review documentation as provided under the DD1423 requirements. (C) Within 45 calendar days after the Government inspects the First Article, the contracting officer shall notify the contractor, in writing, of the approval, conditional approval, or disapproval of the First Article. The notice of approval, conditional approval, or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for disapproval. (D) If the First Article is disapproved, the contractor, upon Government request shall repeat any or all First Article Tests. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs to the First Article or select another First Article for testing. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a disapproval. The contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified in paragraph B above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests. (E) If the contractor fails to present any First Article on time, or the contracting officer disapproves any First Article, the contractor shall be deemed to have failed to make delivery within the meaning of the default clause of this contract. (F) Unless otherwise provided in the contract, and if the approved First Article is not consumed or destroyed in testing, the contractor may deliver the approved First Article as part of the contract quantity if it meets all contract requirements for acceptance. (G) If the Government does not act within the time specified in paragraph (C) above the contracting officer, shall, upon timely written request from the contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay. (H) Before First Article Approval, the acquisition of materials or components for, or the commencement of production or, the balance of the contract quantity is at the sole risk of the contractor. Before First Article approval, the costs thereof shall not be allocated to this contract for 1) progress payments, or 2) termination settlements if the contract is terminated for the convenience of the Government. The contractor is responsible for providing operating and maintenance instructions, spare parts, and repair of the First Article during any First Article test. (I) The contractor shall produce both the First Article and the production quantity at the same facility and shall submit a certification to the effect with each First Article. (J) The test report (2 copies) shall be in accordance with MIL-STD-831, unless otherwise specified on the DD1423, and shall be submitted via the cognizant DCMC to NAVSUP, ATTN: (Cite name and code in Block 10.a of the SF33). The DCMC shall provide comments on Form DD1222 (2 copies) which shall be forwarded with the test report. Approval of the test report is the PCO's responsibility. Upon notification of approval, condition approval, the ACO shall execute the DD250 to indicate Government acceptance of the test report. 4.11 Alternate Offers - Waiver of First Article Approval Requirements. (The following provisions supersede any waiver of First Article Approval Requirements terms set forth in clause 52.209-3 or 52.209-4 as appropriate) (A) Unless otherwise specified in the solicitation, NAVSUP WSS reserves the right to waive the First Article Approval Requirements specified herein for offerors who have previously furnished identical production articles accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer. An offeror requesting waiver of First Article Requirements shall submit evidence with its offer establishing that: (I) the last production unit was delivered within three (3) years of the issue date of this solicitation, and (II) the production location to be used for this requirement is the same as used for the previous production run. Additionally, the offeror shall submit a certification, to be executed by the officer or employee for the offer, stating that: (I) the articles to be provided will be produced using the same facilities, processes, sequences of operations and approved subcontractors as those previously delivered and accepted by the Government or the Original Equipment Manufacturer/Prime Manufacturer, and (II) the previous production units were manufactured without Material Review Board disposition or waiver/deviation request or rejection of pre-production samples for cause. (NOTE: This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.) (B) Offerors requesting waiver of First Article Approval Requirements under the provisions of this clause are cautioned to submit two prices for articles required herein - one that is based on compliance with the First Article Approval Requirements and one that is based on a waiver of such requirements. Where an offeror submits only one price and fails to clearly state that the price is based on waiver of the First Article Approval Requirements it will be deemed to be based on compliance with the First Article Approval Requirements (C) In the event of the First Article Approval Requirement is granted, the delivery schedule for the production items shall be reduced by the number of days designated for delivery of First Article Test unit plus the number of calendar days indicated for the government notification of conditional approval or approval. These requirements are specified in the quality assurance section of this solicitation. If the offeror is unable to meet the desired schedule, he shall insert below the alternate delivery schedule he offers to the government. Offeror's Proposed Alternate Delivery Schedule (Based on waiver of First Article Approval Requirements) Within Days: Item No. _____________ Quantity:_______ After Date of Contract:_________ 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 332722
New
Federal
BOLT,MACHINE
Solicitation # N0038327QTA09
Solicitation N0038327QTA09, issued by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the procurement of machine bolts, specifically NSN 5306-01-706-0165 (Reference 81205 BACB30PW4P16). The government intends to make a single award to a responsible offeror based on the most advantageous offer, with past performance weighted as more important than price. Evaluation of past performance may include the use of the DoD Supplier Performance Risk System (SPRS) to assign color ratings. Amendment 0001 updated the required quantity from 2 to 1 and cancelled CLIN 0001AA. The contract requires delivery within 90 days on an FOB Destination basis. Strict adherence to quality management systems such as ISO 9001 or SAE AS9100 is mandatory. Packaging and marking must comply with MIL-STD-2073, MIL-STD-129, and MIL-STD-130, with specific requirements for Item Unique Identification (IUI) and electrostatic discharge protection where applicable. Invoicing and receiving reports must be processed electronically through the Wide Area Workflow (WAWF) system. The procurement also incorporates various Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS) clauses regarding the Buy American Act, cybersecurity, and the prohibition of certain foreign telecommunications equipment.
Bolt, Nut, Screw, Rivet, and Washer Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 334511
New
Federal
COMPUTER,FUEL MANAG
Solicitation # N0038327QAA08
Solicitation NO0383-27-Q-AA08, issued by NAVSUP Weapon Systems Support Philadelphia, is a small business set-aside for the teardown, evaluation, repair, overhaul, and modification of Fuel Management Computers (NSN 6610-01-523-8319, P/N 512010-03-01). The primary objective is to return these units to a Ready for Issue (RFI) condition. A critical technical requirement includes the mandatory replacement of all seven transorbs on the internal Fuel Interface Card (PN512023-04-01) as part of standard repair procedures. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, as the government will not provide manufacturing aids. Specific prohibitions include the use of MIL-W-81381 wire, which must be replaced by SAE-AS22759 series wire. The contract mandates strict adherence to quality and technical standards, including ISO 9001/SAE AS9100 for quality management and ANSI/NCSL Z540.3 or ISO-10012-1 for calibration. Performance is subject to government inspection and acceptance at the origin, with a required delivery timeframe of 90 days FOB Destination. The award will be made to a single responsible offeror based on a determination of the most advantageous offer, with past performance weighted as more important than price. Additional administrative requirements include the use of the Wide Area Workflow (WAWF) system for invoicing and compliance with MIL-STD-2073-1 for packaging and MIL-STD-129 for marking.
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing

POSTED

about 3 hours ago

DEADLINE

in 22 days
View Details
NAICS: 333998
New
Federal
PIVOT,SUPPORT
Solicitation # N0038327QMA20
Solicitation N00383-27-Q-MA20 is a fixed-price request for the procurement of 31 units of PIVOT, SUPPORT (part number 1680-LL-B6O-A003) for the Department of Defense, managed by Navsup Weapon Systems Support. The item is designated as flight critical, meaning only Government-approved sources may be solicited. Delivery is required within 90 days on an FOB Destination basis, with inspection and acceptance occurring at the origin. The contractor must adhere to ISO 9001 quality management standards and strict military packaging and marking requirements, including MIL-STD-2073, MIL-STD-129, and MIL-STD-147 for palletization. The Government intends to make a single award based on a best-value determination where past performance is considered more important than price. Past performance will be evaluated using the DoD Supplier Performance Risk System (SPRS) to assess item, price, and supplier risk. Invoicing and payment must be processed electronically through the Wide Area WorkFlow (WAWF) system. The contract incorporates various regulatory requirements, including the Buy American Act, hazardous material identification per FAR 52.223-3, and cybersecurity safeguarding under DFARS 252.204-7012. Offerors must maintain active registration in the System for Award Management (SAM) and provide necessary source approval documentation if not already an approved provider.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMB
Solicitation # N0038327QAA13
This solicitation, issued by NAVSUP Weapon Systems Support, seeks a contractor to perform the overhaul, upgrade, repair, testing, and inspection of various circuit card assemblies, including items with NSNs 5998-01-512-3463, 015123482, 015215180, 1680-01-619-4547, and 5998-01-620-1746. The primary objective is to return these assets to a Ready for Issue condition. The contract specifies a one-year induction period from the date of award, with final inspection and acceptance occurring at the origin. The contractor is responsible for providing all necessary facilities, labor, materials, and tooling, and must adhere to strict quality standards, including ISO 9001/SAE AS9100 and ANSI/NCSL Z540.3 for calibration. The government intends to make a single award based on a best-value determination, prioritizing past performance over price. Key operational requirements include the use of SAE-AS22759 series wire and compliance with MIL-STD-130 for markings and MIL-STD-2073-1 for packaging. The contract includes specific provisions for Beyond Economical Repair and Over and Above Repair determinations, both of which require DCMA concurrence. Invoicing and payment will be managed electronically through the Wide Area Workflow system. BAE Systems Controls Inc. is identified as a source for certain circuit card assembly repairs.
Bare Printed Circuit Board Manufacturing

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS