Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

180th FW Lift Station Repair

Closed
W50S8S26QA009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 14 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of various large-diameter valves, including contractor-furnished units and Metropolitan-furnished 54-inch and 132-inch valves, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction elements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. Civil works requirements encompass the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. Issued by James W. Fowler Co., the solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and woman business enterprises. The bid response deadline is September 29, 2026. The prime contractor is actively seeking subcontractor pricing and encourages the participation of minority, women, and disadvantaged firms, offering assistance with bonding, insurance, and equipment procurement to maximize M/W/DBE involvement. The project also encourages the utilization of apprentices. All work must be performed according to the plans and specifications provided on the James W. Fowler website.
James W. Fowler Co.

POSTED

about 14 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contractor is tasked with replacing one submersible pump and one soft starter at the 180th Fighter Wing’s main lift station, ID #3, located in Swanton, Ohio, under a firm fixed-price contract awarded through a total small business set-aside. The scope requires the safe removal and environmentally compliant disposal of the existing failed equipment, followed by the installation of a new Gorman-Rupp SF Series submersible pump (Model SFV4D) and a like-for-like replacement Allen-Bradley soft starter, ensuring full compatibility and adherence to National Electric Code standards. All work must be completed within 90 calendar days after contract award, with performance scheduled between 0700 and 1600 on weekdays, excluding U.S. holidays, at Building 158 on the installation. The contractor must supply all labor, tools, materials, supervision, and quality control measures, including developing a Quality Control Program that aligns with the Performance Requirements Summary, and ensure 100% compliance with lockout/tagout safety protocols during de-energization. Deliverables include technical cut sheets, as-built drawings of modified electrical circuits, comprehensive Operations and Maintenance manuals, and a detailed Service & Commissioning Report submitted electronically to the Contracting Officer’s Representative. All personnel must be paid wages consistent with the Department of Labor Wage Determination for the area and labor category, and must comply with federal labor laws, including wage rules and prohibitions on convict labor. Security requirements include obtaining and returning base identification and vehicle passes through the SFS Form 77 process, wearing visible identification badges on-site, and undergoing background checks as required by installation security forces. The contract mandates submission of employee training certificates for Antiterrorism Level 1 and OPSEC within 15 days of completion, and immediate return of all credentialing materials upon departure or contract termination, with failure to comply potentially resulting in withheld final payment. The contractor must use the Wide Area Workflow system for electronic invoicing via the Invoice 2in1 method, maintain active SAM registration, and ensure no excluded parties are involved in performance. The solicitation incorporates numerous FAR clauses related to payment, cybersecurity, subcontracting, antiterrorism, sustainable products, and prohibition of certain foreign-sourced equipment or services, with multiple deviations for modernized administrative processes. The acquisition is governed by the Performance Work Statement and Wage Determination attachments, and the offering entity must be a registered small business eligible under FAR 19.5.

General Info

Replace submersible pump and soft starter at 180th Fighter Wing, including disposal, installation, testing, documentation.

Agency

Department Of Defense → W7NU Uspfo Activity Ohang 180View Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Swanton, OH, 43558, USA

Set-Aside

SBA

Documents

(5)

Lift Station Repair Wage Determination Ohio Revision 29

PDF13 pageswage-determination

Solicitation W50S8S26QA009 Lift Station Repair

PDF25 pagesrfq

Lift Station Repair Justification Review Document

PDFjustification-and-authorization

Lift Station Repairs Performance Work Statement

PDF14 pagespws

Lift Station Repair Questions and Answers

PDF1 pageq-and-a

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NU Uspfo Activity Ohang 180
Contacts2 people available
OfficeSWANTON, OH, 43558-9645, USA
Organization / Agency
Department Of Defense → W7NU Uspfo Activity Ohang 180
View Agency Profile
Office AddressSWANTON, OH, 43558-9645, USA

Full Description

Show more

DESCRIPTION:


The contractor shall provide all management, tools, equipment, materials, labor, and supervision necessary to replace one submersible pump and one soft starter at the 180th Fighter Wing main lift station (ID: #3) located in Swanton, Ohio. All work shall be performed in strict accordance with the Performance Work Statement (PWS).


SCOPE OF WORK:
The required services include, but are not limited to, the following:


  • Removal & Disposal: Safe removal and environmentally compliant disposal of the existing failed submersible pump and soft starter components.

  • Brand Name Installation:


    • Procurement and installation of one (1) new Gorman-Rupp SF Series submersible pump (Model SFV4D).

    • Procurement and installation of one (1) new Allen-Bradley soft starter (fully compatible, like-for-like replacement for the existing SMC Flex model).

  • Integration & Testing: Execution of all necessary NEC-compliant electrical wiring, system start-up, and operational testing to verify proper pump cycling, alternation, and overall system integration.

  • Deliverables: Provision of required submittals, including technical cut sheets, as-built drawings, and comprehensive Operation and Maintenance (O&M) manuals.


PERIOD OF PERFORMANCE:
All work must be completed within 90 calendar days after the date of contract award.


CONTRACTOR RESPONSIBILITES:


In accordance with the PWS and federal labor laws, the contractor is responsible for:


  • Labor Wages: Strictly adhering to the attached Department of Labor Wage Determination. All contractor and subcontractor personnel must be paid the applicable prevailing wages for this area and labor category.

  • Deliverables: Providing all necessary submittals, including technical cut sheets and O&M manuals.

  • Testing: Conducting full operational testing and start-up to verify system restoration.

  • Documentation: Ensuring as-built drawings are provided upon project completion.


*See Attchments

More opportunities from Department Of Defense → W7NU Uspfo Activity Ohang 180

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS