Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

GOV Parking and Roadway paving, Camp Murray, WA

Active
W50S9E26BA002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation W50S9E26BA002 is a 100% small business set-aside under NAICS 238990 for the Washington Air National Guard, 194th Wing. The project involves the construction of government vehicle parking areas and roadway surfaces at the new ASOG Complex, building 140, at Camp Murray, WA. The scope of work includes asphalt paving, concrete curbing, retaining wall construction, covered parking installation, lighting, security fencing, and landscaping. The project magnitude is estimated between 5 million and 10 million dollars, and the contract will be awarded as a firm-fixed-price agreement to the responsible bidder offering the most advantageous bid based on price and past performance. The performance period is 360 calendar days from the Notice to Proceed, with work required to commence within 10 days of that notice. Key requirements include the submission of a bid bond on form SF24, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act and EM 385-1-1 safety standards. Bidders must be registered in SAM and submit invoices electronically via Wide Area Workflow. Following an update, a second site visit is scheduled for September 17, 2026, with requests for information due by September 27, 2026, and the final bid opening moved to October 15, 2026, at 0900 local time.

General Info

Small business contract for parking and roadway construction at Camp Murray, WA.

NAICS

238990 - All Other Specialty Trade Contractors

Place of Performance

building 140, Camp Murray, WA, Camp Murray, WA, 98430, USA

Set-Aside

SBA

Documents

(26)

10078627 Camp Murray ASOG Facility Construction Drawings

PDF•specifications

Attachment 5 - 05c Specifications (Camp Murray Air National Guard Base)

PDF•481 pages•specifications

Camp Murray ASOC Facility - GOV Parking and Armor Drive Drawings

PDF•46 pages•specifications

Camp Murray ASOS Facility - Construct Infantry Dr to B116 Drawings

PDF•specifications

ETRD 249361 Bid Schedule - Construct Parking and Roadway

XLSX•3 pages•bid-schedule

ETRD249361 - Camp Murray ASOG Site Improvements Type B-3 Specifications

PDF•specifications

ETRD249361 Construct GOV Parking and Roads SOW

PDF•29 pages•sow

ETRD 249361 - Construct GOV Parking and Roads SOW

PDF•29 pages•sow

ETRD 249361 - Construct Parking and Road Bid Schedule

XLSX•3 pages•specifications

Section 01 11 00 Summary of Work / Project Table of Contents

PDF•481 pages•sow

Type B-3 Final Specifications - ETRD249361

PDF•specifications

W50S9E26BA0020001 Amendment - Camp Murray Parking and Roadway Construction

PDF•20 pages•amendment

W50S9E26BA0020001 - Construction of Parking and Roadways Camp Murray

PDF•110 pages•ifb

W50S9E26BA002 - Construct Parking and Roadways Camp Murray, WA

PDF•ifb

W50S9E26BA002 Invitation for Bid - Construct Parking and Roadways

PDF•ifb

ETRD 249361 GOV Parking and Roadway - Site Visit Sign-in

PDF•other

GOV Parking and Armor Drive Drawings - G004 Civil Site Legend

PDF•46 pages•specifications

Attachment+1+-+WA+ANG+Construction+Solicitation+SOW+Construct+Parking+and+Road+28+Sep+26.pdf

PDF

Attachment+2+-+Type+B-3+-+Final+GOV+Parking+and+Armor+Dr+Draw.pdf

PDF

Attachment+3+-+Type+B-3+-+Final+Specifications.pdf

PDF

Attachment+4+-+Type+B-3+-+Final+Infantry+Drive+Drawings.pdf

PDF

Attachment+6+-+Example+Bid+Report++Construct+Parking+and+Roadway.xlsx

XLSX

Attachment+7+-+Tree-Removal+Areas_28Sep26.pdf

PDF

Attachment+8+-+Contractor+Environmental+Guide-July2026.pdf

PDF

Solicitation+Amendment+-+W50S9E26BA0020002.pdf

PDF

Solicitation+Amendment+W50S9E26BA0020002+SF+30.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseSolicitation
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Oct 8, 2026 to Oct 15, 2026. The notice description changed.

Notice updated

Set-aside added: Small Business Set Aside - Total. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7N6 Uspfo Activity Waang 194
Contacts1 person available
OfficeCAMP MURRAY, WA, 98430-5035, USA
Office AddressCAMP MURRAY, WA, 98430-5035, USA

Full Description

Show more

The Washington Air National Guard, 194th Wing at Camp Murray requires to complete government vehicle parking area and roadway surfaces at the new ASOG Complex, building 140. This project will include asphalt paving, concrete curbing, retaining wall construction, covered parking installation, and well as some lighting and security fence installation.



UPDATE: We are holding a second site visit 17 Sep 2026 at 0900 local.  Initial meet up will be at building 127, 41st Division Way, on Camp Murray, WA. 


RFI's due out is extended to being due by the end of the day 27 Sep 2026, and Bid Openning is going to be moved to 15 Oct 2026 at 0900 local.  Ammendment to the Soliciation forthcoming to show those changes.


See Amendment W50S9E26BA0020001 in attachments for amended soliciation and W50S9E26BA0020001 SF30 for the changes.


See Amendment W50S9E26BA0020002 in attachments for amended soliciation and W50S9E26BA020002 SF 30 for the changes.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
Federal
REPAIR AC PAVING
Solicitation # W50S74-26-Q-A020
Solicitation W50S74-26-Q-A020 is a request for quotation for the Repair AC Paving project at March Air Reserve Base, California, for the 163 ATKW CA ANG. This 100 percent small business set-aside under NAICS 238990 involves the repair of approximately 60,000 square yards of asphalt concrete paving across various parking areas, storage lots, and roads. The scope of work includes mechanical preparation, crack filling, the application of Type II or Type III slurry seals, mill and overlay, full depth replacement, grading, curb installation, and ADA-compliant striping and signage. The project magnitude is estimated between 500,000 and 1,000,000 dollars, and the period of performance is 120 days after the notice to proceed. The government will award a firm-fixed-price contract to the lowest priced, technically acceptable quote with acceptable past performance. Offerors must submit a complete electronic package including a signed SF 1442, a two-page capability statement, and detailed technical drawings for the replacement parking lot identified in CLIN 0009. Key requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon wage determinations for Riverside County, and completion of Anti-Terrorism Level 1 and Cyber Awareness training for personnel. Invoicing must be processed through the Wide Area Workflow system. While the solicitation is active, the government has noted that funds are not presently available and no award will be made until appropriated funds are secured.
W7MX Uspfo Activity Caang 163

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 238990
New
On-Call Maintenance and Minor Construction Services
Solicitation # RFP-VC-26-008
The Inland Empire Regional Composting Authority is seeking licensed and qualified general contractors under solicitation RFP-VC-26-008 to provide on-call maintenance and minor construction services in California. This master services contract will utilize a task order structure for two primary types of work: emergency call-outs for immediate repairs typically under 35,000 dollars and routine task orders where contractors submit price proposals for selection based on the lowest cost. The scope of work encompasses a wide range of services, including millwright work, welding, electrical repairs, plumbing, and the maintenance of heavy equipment, conveyors, and hoppers. Proposals must be submitted electronically via PlanetBids by October 29, 2026. The Authority intends to award multiple contracts based on an evaluation of experience, capabilities, responsiveness, hourly rates, and proximity to the service area. Contractors must adhere to California Labor Code Section 1770 regarding prevailing wages and maintain registration with the Department of Industrial Relations. Key requirements include providing performance and payment bonds for any task order exceeding 25,000 dollars and maintaining specific insurance limits, including 1,000,000 dollars per occurrence for general liability. Additionally, offerors must submit a non-collusion affidavit and a waiver of liability. Invoicing is handled electronically, with an option for expedited payment in exchange for a percentage-based discount on the invoice amount.
Inland Empire Utilities Agency

POSTED

about 18 hours ago

DEADLINE

in 29 days
View Details
NAICS: 238990
New
Ruby Creek Park & Ride Construction
Solicitation # ruby-creek-park-ride-construction
The Ruby Creek Park and Ride Construction project involves the development of a fully operational 273-stall park and ride facility located near the intersection of SW Sedgwick Road and Sidney Road SW in Port Orchard, Washington. Managed by James W. Fowler Co. for the owner, Kitsap Transit, the comprehensive scope of work includes the installation of bus shelters, a ticketing kiosk, restrooms, passenger vehicle chargers, and inductive bus chargers. Additional infrastructure requirements consist of stormwater piping, CCTV security systems, lighting, utilities, and landscaping to ensure a complete and functional transit hub. This solicitation is designated as a Small Business set-aside and was issued on September 8, 2026, with a response deadline of September 30, 2026. James W. Fowler Co. is actively seeking subcontractor and supplier pricing across various trades and materials. The project emphasizes inclusive participation, specifically encouraging bids from minority, women, and disadvantaged (M/W/DBE) firms. To support these efforts, the prime contractor is prepared to divide contract requirements into smaller portions and assist M/W/DBE subcontractors in securing necessary equipment, supplies, bonding, lines of credit, or insurance. Detailed plans and specifications are available at no cost via the James W. Fowler website.
James W. Fowler Co.

POSTED

about 18 hours ago

DEADLINE

in about 2 hours
View Details
NAICS: 238990
New
SLED
Maintenance, Repair, Installation and Inspection of Overhead Doors and Gates (Annual Contract with 4 Options to Renew)
Solicitation # 2026-106-ITB
DeKalb County, Georgia, is soliciting sealed bids for an annual contract to provide maintenance, repair, installation, and inspection services for various door and gate systems, including roll-up, overhead, sliding, and automatic gate systems. The scope of work covers multiple locations throughout the county and requires ensuring that all systems remain operational 24 hours a day, 7 days a week. The contract includes an initial twelve-month term with four optional twelve-month renewal periods. Key deliverables include quarterly preventative maintenance for all doors and gates, annual detailed analyses for fire station doors, and the submission of detailed service reports and electronic service tickets within 30 days of work completion. Bids must be submitted via the County's eProcurement Portal no later than 3:00 pm on October 28, 2026. The contract will be awarded to the lowest, responsive, and responsible bidder, with specific evaluation processes in place regarding Local Small Business Enterprise (LSBE) participation. Prime contractors are required to meet a 20% LSBE benchmark or demonstrate good faith efforts, and they must attend a mandatory LSBE meeting. Compliance requirements include adhering to Davis-Bacon prevailing wage standards, providing both performance and payment bonds, and maintaining specific insurance ratings. Additionally, contractors must comply with the First Source Jobs Ordinance to support local employment and utilize the CV360-iSupplier platform for invoicing and electronic reporting.
Purchasing & Contracting

POSTED

1 day ago

DEADLINE

in 29 days
View Details

More opportunities from Department Of Defense → W7N6 Uspfo Activity Waang 194

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS