Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

19725785-Modernize Foyer, B3001G, Room 127

Closed
FA813726R0044Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This contract is a solicitation for WOSB-certified construction contractors under NAICS code 236220 to perform the modernization of the foyer and adjacent areas in Building B3001G, Room 127 at Tinker Air Force Base. The core scope involves the safe decommissioning and removal of two obsolete Computer Room Air Conditioning units from a critical data center facility, followed by comprehensive restoration of the floor, wall, and ceiling systems to ensure the space meets safety, operational, and aesthetic standards. The project is designated as a SBA Certified Women-Owned Small Business (WOSB) set-aside, restricting eligibility to certified women-owned small businesses. All proposals must be submitted by September 1, 2026, and attendance at the mandatory Initial Site Visit on August 5, 2026, is required for proposal eligibility. Interested parties must RSVP by 2:00 p.m. CST on August 3, 2026, to the designated contracting points of contact, and must disclose whether attendees require base access, providing an Entry Access List if necessary. Access to detailed project documents is restricted and must be requested via email, with only prime contractor email addresses accepted for secure DoD Safe transmission.

General Info

Modernize south building foyer at B3001G with high-end finishes, energy-efficient lighting, and full restoration under WOSB set-aside, funds contingent.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

0, OK, 73145, USA

Set-Aside

WOSB

Documents

8

Amendment FA813726R00440001 SF 30

PDF, High priority: read this firstamendment
High

B3001G Foyer Modernization Scope Drawings

PDF, High priority: read this first1 page · sow
High

FA813726R0044 RFI Responses – Modernize Foyer, B3001G

PDF, High priority: read this first3 pages · q-and-a
High

Oklahoma Construction Wage Determination OK20260049

TXT, High priority: read this first5 pages · wage-determination
High

PWS Foyer Modernization v2.3 - Tinker AFB

PDF, High priority: read this first10 pages · sow
High

Solicitation FA813726R00440001 - Modernize Foyer B3001G Room 127

PDF, High priority: read this firstrfp
High

Site Visit Sign-Up Sheet for AESC/PZOC Event 10/01/2024

PDF, Low prioritysite-visit-sign-in-sheet
Low

Submittal Register / Acceptance Report

PDF, Low priority2 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Sep 1, 2026 to Aug 29, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8137 Afsc Pzioc
Contacts2 people available
OfficeTINKER AFB, OK, 73145-9125, USA
Office AddressTINKER AFB, OK, 73145-9125, USA

Full Description

Show more

Update 02- August 18, 2026


1. RFIs are attached as: RFI Response 8-18


2. PWS attached as: PWS_Foyer Modernization


3. RFPs due 29 August 2026 2PM CST. Email CS dorothy.inoa@us.af.mil AND sharla.flowers_brandon.1@us.af.mil.


Update 01- August 10, 2026


1. Site visit was held and concluded. Sign In Sheet attached as Sign In Sheet 8-10


2. RFI's are due Friday August 14, 2026 at 2PM CST email dorothy.inoa@us.af.mil AND sharla.flowers_brandon.1@us.af.mil.



This posting is for Tinker AFB – WOSB construction contractors with NAICS 236220.


Project Solicitation Number:  FA813726R0044


Project Title: 19725785-Modernize Foyer, B3001G, Room 127


Project Location: Tinker Air Force Base


19725785-Modernize Foyer, B3001G, Room 127- This project requires some demolition and modernization of the south building foyer. The existing entrance is outdated and does not reflect the professional and executive standard required for the facility. The purpose of this renovation is to modernize the space by introducing high-end finishes, improving energy efficiency with new lighting and controls. The project involves the selective removal of all designated existing finishes and fixtures, followed by a full architectural, mechanical, and electrical restoration. The final product will be a safe, durable, and fully operational entrance that provides an executive-level appearance and adheres strictly to all applicable Tinker AFB and Department of War (DoW) standards.


For project specific documents, please email dorothy.inoa@us.af.mil for access. Specific documents cannot be posted on SAM.gov. 


If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission.  In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to.  Do not include any Sub-Contractor email addresses.


After review of the attached project specific documents, if you are interested to attend the Initial Site Visit, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. The POC emails are dorothy.inoa@us.af.mil and sharla.flowers_brandon.1@us.af.mil.  Your RSVP email must be received by 2:00pm CST on 3 Aug 2026.  In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.  If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. 


The site visit will be held on 5 Aug 2026.


After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated.


You must attend the Initial Site Visit for the project to be considered eligible to propose.

More opportunities from Department Of Defense → FA8137 Afsc Pzioc

Same awarding agency

NAICS: 238190
New
Federal
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
Solicitation # FA813727R0001
Solicitation FA813727R0001 is a firm fixed price request for proposal for the repair of structural integrity at Building 1134, Post 34, and the North Wall at Tinker Air Force Base, Oklahoma. The project scope involves repairing or replacing eroded shear braces and the base of Post 34 to prevent potential failure. This opportunity is restricted exclusively to Tinker AFB MAC BOA holders, and attendance at the initial site visit on October 22, 2026, is mandatory for eligibility to propose. Interested prime contractors must RSVP by October 20, 2026, and provide an Entry Access List for any personnel requiring base access. The estimated magnitude of the construction is between $100,000 and $250,000, with a performance period of 195 calendar days from the notice to proceed. The acquisition will be awarded based on the Lowest Price Technically Acceptable (LPTA) process, where the award goes to the responsible offeror with a technically acceptable proposal and the lowest evaluated price. Technical evaluations will focus on capability and management, and any deficiency in a subfactor will render a proposal un-awardable. Proposals must be submitted in separate technical and price volumes, with pricing broken down by the CSI Master Format System. The contract is a total small business set-aside and is subject to the Davis-Bacon Act, Buy American Construction Materials requirements, and DFARS cybersecurity standards. Liquidated damages for delays are set at $227.75 per calendar day.
Other Foundation, Structure, and Building Exterior Contractors

POSTED

4 days ago

DEADLINE

in 28 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS