Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Homeland Security was posted on March 13, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

20 -- Manufacture of shafts for CGC ACUSHNET

Awarded
HSCG85-08-R-625454Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 332111
New
DIBBS
BAR, METAL
Solicitation # SPE8E4-27-T-0076
Solicitation SPE8E4-27-T-0076 is a request for quotations issued by the Defense Logistics Agency Troop Support Construction and Equipment Metals office for the procurement of 48 metal bars, identified by NSN 9510015276320. These components, also described as long retaining rods without retaining rings, are intended for use in a Tactical Water Purification System. The procurement falls under NAICS code 332111 and requires the submission of quotes via the DIBBS system. Delivery is specified as FOB Origin with a required delivery date of March 22, 2027, and a need ship date of October 14, 2026, with a delivery window of 66 days after order. Inspection and acceptance will occur at the destination, specifically the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The contract mandates strict adherence to technical and quality requirements, including Metal Certification Contract Data Requirements Lists and DD Form 1423s. Packaging must comply with ASTM D3951 and MIL-STD-129, though the DLA Master List of Technical and Quality Requirements takes precedence. Palletization must follow RP001 standards. Key regulatory requirements include compliance with the Buy American Act, the Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information. Payment and receiving reports must be processed electronically through the Wide Area WorkFlow system. Offerors must be registered in the System for Award Management and are prohibited from using additive manufacturing processes unless specifically authorized.
DDSP NEW CUMBERLAND FACILITY

POSTED

2 days ago

DEADLINE

in 1 day
NAICS: 332111
New
DIBBS
GUIDE, CAM FOLLOWER, FO
Solicitation # SPE7L1-27-T-1579
This procurement, solicitation number SPE7L1-27-T-1579, is a total small business set-aside issued by the DLA Weapons Support Land Supply Chain for the acquisition of 149 units of Guide, Cam Follower, Folding Floor (NSN 5340-01-540-4920). The requirement is governed by NAICS code 332111 and specifies a need ship date of February 5, 2026, with an original required delivery date of April 7, 2027. Delivery is FOB Origin, with inspection and acceptance occurring at the destination, specifically DLA Distribution San Joaquin in Tracy, California. The contract mandates strict adherence to technical and quality standards, including TDP Rev D Gen 4 and specific Quality Assurance Provisions (QAP 13873 and QAP 16236). Quality compliance requires a Certificate of Quality Compliance and Metal Certification. Sampling must follow MIL-STD-1916 or ASQ H1331, with specific AQLs assigned to critical, major, and minor attributes. Packaging and marking must comply with MIL-STD-2073-1E, MIL-STD-129, and DLA packaging requirements (RP001). Key regulatory requirements include the Buy American and Balance of Payments Program (DFARS 252.225-7001) and the Berry Amendment. Offerors must be registered in the System for Award Management (SAM) and utilize the Wide Area Workflow (WAWF) for electronic invoicing. All quotations must be submitted via the DLA Internet Bid Board System (DIBBS) by October 26, 2026. Additionally, the contract incorporates cybersecurity requirements under DFARS 252.204-7012 and prohibits the use of additive manufacturing unless specifically authorized.
DLA WEAPONS SUPPORT LAND SUPPLY CHAIN

POSTED

2 days ago

DEADLINE

in 1 day
NAICS: 332111
New
DIBBS
BAR, METAL
Solicitation # SPE8E9-27-T-0228
Solicitation SPE8E9-27-T-0228 is a request for quotations issued by DLA Troop Support for the procurement of 232 feet of flat chrome-molybdenum (4130) steel bars. The material must be 0.250 inches thick and 2.00 inches wide, supplied in whole foot lengths between 10 and 12 feet. This is designated as a critical application item and must comply with technical standards SAE AMS-S-6758B Revision B and SAE AMS2806 Revision D. Delivery is required by May 23, 2027, with a need ship date of April 12, 2027, shipped FOB Origin to the DLA Distribution Depot Oklahoma at Tinker AFB. Eligibility for award is restricted to suppliers listed on the Qualified Suppliers List for Distributors (QSLD) or Manufacturers (QSLM). A Certificate of Quality Compliance (Mill-Material Certification) is mandatory for every shipment. Strict adherence to marking and packaging requirements is required, including compliance with MIL-STD-129 and ASTM A700; failure to provide legible, waterproof continuous identification markings—including the contract delivery order number, NSN, and heat/lot number—will result in the rejection of the product. Inspection and acceptance will occur at the destination, though source inspection is waived for approved QSL suppliers. The procurement incorporates various FAR and DFARS clauses, including the Buy American Act and Berry Amendment restrictions. Offers must be submitted via the DIBBS system. Payment will be processed electronically through the Wide Area WorkFlow (WAWF) system. A price evaluation preference is available for HUBZone Small Business Concerns, and the use of additive manufacturing for the produced items is prohibited unless specifically authorized.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

2 days ago

DEADLINE

in 1 day

AI Contract Overview

Show more

Solicitation HSCG85-08-R-625454 is a request for proposals for the manufacture, finish machining, testing, preservation, and packaging of two propeller shafts for the CGC ACUSHNET. The project includes the fabrication of associated components such as propeller nuts, keys, and securing devices. Shafts must be manufactured from MIL-S-23284 Class 3 or ASTM-A-688 Class B material, and the Coast Guard has specified a flangeless design. Performance is scheduled to begin around February 26, 2008, with a completion deadline of June 1, 2008, and delivery to NESU Seattle, WA. The contract requires strict adherence to various military and industry standards for ultrasonic testing, magnetic particle inspection, and fiberglass covering. Contractors must maintain a documented inspection system and a NIST-traceable calibration program. Award decisions will be based on a firm fixed price evaluation where past performance is weighted approximately equal to price. Proposals were due by February 20, 2008, and must include the contractor's Tax Identification Number and DUNS Number.

General Info

Contract Value

$157,860

NAICS

332111 - Iron and Steel Forging

Place of Performance

CA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed. The point of contact changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts2 people available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA

Full Description

Show more
**Due date for proposals remains: 20 Feb 2008, 11:00 AM Local Alaska Time** The following are contractor questions and Coast Guard provided responses: Question 1) If we manufacture the shafts using ABS grade 2 forgings (ASTM-A-688) can we substitute this same material for the propeller nut and keys? Would 1045 material be acceptable? Answer 1) If the shaft is manufactured of ABS grade 2 forgings (ASTM-A-688) then the same material shall be used for the propeller nut and keys. ASTM 1045 is not acceptable. Question 2) The key and keyway dimensions are not given on the drawing. Answer 2) Review of 167WAT-4301-10 shows detail 9-A and Section 8-C provides questioned dimensions. This should be sufficient to prepare an accurate bid. Upon award Coast Guard will work in cooperation with the Contractor to establish any additional details (not clear or deficient on drawing) required to complete fabrication. Question 3) The propeller shaft in the original drawing (167WAT-4301-1) is a 1 piece shaft with a forged flange. Was this detail changed due to availability of material? Answer 3) Good observation. The flange was removed in 1999, due to pitting/damage. The adjoining stern tube shaft (that will remain in place) has been modified to use the existing straight coupling. Coast Guard has intentionally decided to continue with a flangeless propeller shaft (as depicted in (167WAT-4301-10). All other requirements remain unchanged. This is a combined synopsis/solicitation HSCG85-08-R-625454 for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This Request for Proposal incorporates provisions and clauses in effect through Federal Acquisition Circular 2005-23. This is an unrestricted procurement. The NAICS is 332111. 1. Contract Line Item: Contractor will manufacture, finish machining, test, preserve and package two propeller shafts for the CGC ACUSHNET Propeller shafts (two) Total Price $ 2. Performance will commence upon award (approx 26 Feb 2008) and complete no later than 1 June 2008. 3. Place of Delivery: NESU Seattle, WA, 1519 Alaskan Way S., Seattle, WA 98134, POC: LT David Melton +1 (555) 000-0000 4. Description of Requirement: All work will be accomplished in accordance with the following specification 1.0 SCOPE 1.1. This document sets forth the requirements for the manufacturing, finish machining, testing, preservation, and packaging of two propeller shafts to be used on USCGC Acushnet. Shaft material shall be MIL-S-23284, Class 3 (CL3) or ASTM-A-688 Class B (Corresponding to ABS Grade 2). The accompanying propeller nut, keys, nut securing device, as well as balancing keys (all detailed in the drawing) will also be provided in this procurement. 2.0 APPLICABLE DOCUMENTS 2.1. GOVERNMENT DOCUMENTS - The following specification and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the documents listed here by number and date shall be those in the current Department of Defense Index of Specifications and Standards (DODISS) and supplements thereto. 2.1.1. SPECIFICATIONS - MILITARY a. MIL-S-23284A (SH) - Dated 15 June 1990, Steel Forgings, Carbon and Alloy, for Shafts, Sleeves, Couplings, and Stocks (Rudders and Diving Planes) b. MIL-DTL 2845E (SH) - Dated 18 Aug 1999, Preservation, Packing and Storage of Propulsion Systems, Boat & Ship; Main Shafting, Propellers, Bearings, Gauges, Special Tools, & Associated Parts. c. MIL-R-23461A, Dated 26 Jun 1987; Resin Compound, Room Temperature Curing, for Metal Coating 2.1.2. Military Standards a. MIL-STD-2191, Dated 05 Nov 1992; Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting. b. MIL-STD-2199 (1) Dated 05 Oct 1993; Glass Reinforced Plastic Coverings for Propeller Shafting. 2.1.3. NAVSEA Technical Publications a. T9074-AS-GIB-010/271(1), Dated 16 Feb 1999; Requirements for Nondestructive Testing Methods. 2.1.4. Drawings, Shafts a. 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET? b. 2145807-803 Rev C 19 Dec 1988 NAVSEA Standard Propulsion Shafting Drawing 2.2. COMMERCIAL DOCUMENTS - The following documents form a part of this specification to the extent specified herein. The documents shall be the version listed by number and date from the referenced industry organization. Commercial documents may also be listed in the Department of Defense Index of Specifications and Standards (DODISS). 2.2.1. Society of Automotive Engineers (SAE) a. SAE-J-448A-63 Dated June 1963, Surface Texture, Standard. 2.2.2. American National Standards Institute (ANSI), National Conference of Standards Laboratories (NC SL) a. ANSI/NCSL Z540-1-1994 DATED 1994, Calibration Laboratories and Measuring and Test Equipment - General Requirements. 2.2.3. American Society for Testing Materials (ASTM) a. ASTM-A-688/A688M-00, DATED Mar 10, 2000, Standard Specification for Steel Forgings, Carbon and Alloy, for general Industrial Use. b. ASTM-B-369-96, Re-approved 2003; Standard Specification for Copper-Nickel Alloy Castings. 2.3. SPECIFICATION ORDER OF PRECEDENCE - In the event of a conflict between the text of this specification and the references cited herein, this specification shall take precedence. 3.0 REQUIREMENTS 3.1. General - The contractor shall provide all labor and material required to manufacture, finish machine, assemble, test, inspect preserve, and package the propulsion shafts as outlined in this specification, the applicable drawings, data sheets, and NAVSHIPS drawing 2145807-803 Rev C. Shaft material shall be MIL-S-23284, Class 3 (CL3) or ASTM-A-688 Class B (Corresponding to ABS Grade 2). 3.2. Blank (Rough Forging) 3.2.1 The blanks shall be manufactured in accordance with the listed specification, and as specified herein. a. Blanks are to be fabricated in accordance with (a) MIL-S-23284, Class 3 (CL3) or ASTM-A-688 Class B (Corresponding to ABS Grade 2) b. The blanks shall be dimensioned and toleranced as required to allow for final propulsion shaft delivery per 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET? c. The contractor shall insure that all shafts are stress relieved. d. If straightening is required before or after machining, the shaft shall be subsequently stress relieved in accordance with MIL-S-23284A sections 3.7.1 and 3.8.3. e. Cold rolling of blank (rough forging stage) shall not be allowed for any reason. Cold rolling of specific areas during final machine process is discussed later in this specification. 3.2.2 Newly Forged Blank (Rough Forging) Tests & Inspections 3.2.2.1 Blanks of MIL-S-23284, Class 3 (CL3) Material 3.2.2.1.1 Ultrasonic Testing/Magnetic Particle Testing - UT & MT testing/inspection shall be performed in accordance with Appendix A of MIL-S-23284A over the entire length of each forging produced. 3.2.2.1.2 Chemical analysis, mechanical properties, and 3 charpy V-notch tests shall be performed on each heat that produces shaft blanks under this specification, in accordance with MIL-S-23284A section 4. 3.2.2.1.3 NOTES - A. The sample area shall be in accordance with the referenced locations in specification MIL-S-23284A. 3.2.2.1.4 Each shaft shall be inspected as required here and in MIL-S-23284A Section 4.4.3.1.4 thru 4.4.3.1.7. 3.2.2.1.5 Repair of Defects - Repair by welding is authorized for MIL-S-23284A Class 3 & 4 forgings only. 3.2.2.1.6 Defects shall be documented and reported. 3.2.2.2 Blanks of ASTM-A-688 Class B (Corresponding to ABS Grade 2) Material 3.2.2.1 Blanks shall be fabricated in accordance with American Bureau of Shipping (ABS), Publication 2, and Rules for Building and Classing Steel Vessel as required obtaining ABS certification. 3.2.3 Existing-Used Shafts (Previously Forged) 3.2.3.1 Fully documented and certified existing and/or used shafts that were manufactured and certified to (a) MIL-S-23284, Class 3 (CL3) or ASTM-A-688 Class B (Corresponding to ABS Grade 2) shall also fulfill the material requirements. Contractor has the burden of providing the proof of certification, for Coast Guard?s concurrence, prior to this option being exercised (and prior to final machining commencing). 3.2.3.2 Ultrasonic Testing/Magnetic Particle Testing - UT & MT testing/inspection shall be performed over the entire length of the shaft in accordance with NAVSEA T9074-AS-GIB-010/271. 3.3 FINAL SHAFT MACHINING AND ASSEMBLY 3.3.1 Dimensions ? All dimensions and dimensional tolerances shall be as indicated on drawing 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET?. 3.3.1.1 If not specified, fractional dimensions shall be +/- 1/64?, decimal dimensions (xx) +/-0.01?, (xxx) +/-0.001, (xxxx) +/-0.0005?, and angular dimensions +/- 15 seconds of arc. 3.3.2 Straightening- Any shaft straightening required shall be done in accordance with MIL-STD-2191 section 11, or an equivalent method approved by the Contracting Officer. 3.3.2.1. Determine location, magnitude, and type of bend- Prior to initiating straightening processes, the location, magnitude, and type of bend shall be determined. The entire shaft shall be supported between centers on a lathe with no auxiliary supports. * NOTE: This procedure shall be used for all concentricity checks on shafts finished IAW this specification. 3.3.3 Measurement Procedures- 3.3.3.1 Run out- The run out shall be measured using a dial indicator with the shaft supported between lathe centers (NO ADDITIONAL SUPPORTS SHALL BE USED). a. All dial indicators shall be rigidly supported above the shaft, allowing no movement of the indicator body whatsoever while measurements are being taken. b. The dial indicator(s) shall be in constant contact with the shaft undergoing inspection for the entire rotation and set in the middle of its range. c. Total indicated run out shall be determined by marking the position of maximum run out on the periphery of the shaft at each survey location. 3.3.4 Sleeves ? Procure and installed sleeves shall be concentric with the axis of rotation to within 0.002? 3.3.4.1 Sleeves are to be manufactured from ASTM-B-369 alloy C96400 centrifugal casting. 3.3.4.2 Sleeves shall be secured to the shaft by the shrink fit specified on drawing 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET?. Any other method of securing shaft sleeves to the shaft is prohibited. In the event the shrink fit is not specified use Table 59F on sheet 8 of the NAVSEA Standard Drawing, ref. 2.1.4.b of this specification. 3.3.4.3 Prior to installing the sleeves, the shaft journal OD and the sleeve ID shall be measured and recorded on the inspection report. 3.3.4.4 After installing and finish machining the outside diameter of shaft sleeves, the contractor shall perform a liquid penetrant inspection of all sleeves for cracks/discontinuities in accordance with T9074-AS-GIB-010/271, Requirements for Nondestructive testing methods, ref. 2.1.3.a of this specification. Use Section 5, Group I (Solvent removable) or Group III (water removable) of this reference. Pay particular attention to lock-ring and o-ring groove locations. If cracks/discontinuities are detected, a report, detailing the specific location(s) and dimensions (length/depth) of these defects, including recommendations for repair shall be submitted to the Contracting Officer for technical review and approval. 3.3.5 Welding (during Finish Machining Process) - No welding shall be permitted on any shaft unless specifically approved by the Contracting Officer. If welding is approved the following shall apply. 3.3.5.1. Welding Procedure Specifications, Procedure Qualification Records, and Welder Performance Qualifications shall be submitted to the Contracting Officer for approval and shall be in accordance with MIL-STD-2191 section 5. 3.3.6 Post Weld Heat Treatment (during Finish Machining Process) ? All shafts, which have been welded, shall be heat treated in accordance with section 10.4.7.3 of MIL-STD-2191 ref. 2.1.2.a of this specification. 3.3.6.1 Heat resistant scale preventative- any anti-scale compound used on finish-machined surfaces shall comply with MIL-STD-2191 section 10.4.5.2 as specified here or equal. a. Protect-O-Metal No. 2 from G.W. Smith & Sons, Inc. +1 (555) 000-0000, www.gwsmithandsons.com b. Keepbryte, from Kasenite Company, available from many U.S. suppliers. 3.3.6.2 Any material offered, as ?equal? shall be submitted to the Contracting Officer for approval. Documentation detailing the chemical and material analysis shall accompany the submittal. 3.3.7 Cold Rolling ? Cold roll the areas of the shaft surface indicated on drawing 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET? per that drawing?s instructions. 3.3.8 Surface Finish Standards - All surface finishes shall be in accordance with SAE-J-448 to the RMS number indicated on drawing 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET?. 3.3.9 Fiberglass Covering- All shaft coverings shall be made of fiberglass and epoxy resin in accordance with MIL-STD-2199, ref. 2.1.2.b of this specification. 3.3.9.1 The resin used shall be an epoxy in accordance with MIL-R-23461. 3.3.9.2 Thixotropic fillers can be used as specified in section 5.2.1 of MIL-STD-2199. 3.3.9.3 Fairing compound shall be in accordance with section 5.2.2.b of MIL-STD-2199. 3.3.9.4 The environmental conditions required in section 5.4.6 of MIL-STD-2199 shall be followed. 3.3.10 The sleeve details on drawing 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET? shall be followed 3.3.11 The fiberglass coverings shall not be painted. 3.4 Associated Component Fabrication 3.4.1 In addition to the propeller shaft, the following components, all described in 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET?, shall be fabricated to the drawing requirements and delivered in the final delivery. These parts are required to mate the propeller to the propeller shaft. Part Number Identification From 167 WAT 4301-10 Bill of Material Quantity Description 4 2 Propeller Key 5 2 Dowel Pin 6 1 Propeller Nut 7 1 Locking Key 8 2 Balancing Key 3.5 Final Tests and Inspections? All applicable test and inspection procedures, and acceptance criteria shall be in accordance with the references found in section 2.0 of this specification. 3.5.1 Post Repair Inspections & Tests- The contractor shall perform the following inspections and tests after final machining work is complete. a. Any areas repaired by welding shall be inspected for cracks and other defects by magnetic particle or liquid dye penetrate methods in accordance with T9074-AS-GIB-101/271 NAVSEA Tech pub, Requirements for Nondestructive testing methods, ref. 2.1.3.a of this specification, and the approved welding procedure. b. Each shaft shall be dimensionally inspected for conformance to drawing 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET? and this specification. c. Concentricity inspections shall be conducted in accordance with the procedure outlined in section 11.2.1 of MIL-STD-2191, ref. 2.1.2.a of this specification, and drawing 167 WAT 4301-10, ?DETAIL OF PROPELLER SHAFT FOR ACUSHNET?. d. Each fiberglass protective covering shall pass a spark test in accordance with section 5.6.1 of MIL-STD-2199, ref. 2.1.2.b of this specification. 3.6 Reports ? All reports prepared for submission shall contain at a minimum, the following information. 3.6.1 Prime contractor company name, address, and telephone number. 3.6.2 Testing contractor contact info (if different from above) 3.6.3 Contract and delivery order numbers 3.6.4 Test equipment used, nomenclature, serial number, and calibration date. 3.7 Notifications & Inspections ? The contractor shall be responsible for notifying the Contracting Officer at least seven (7) working days prior to said contractor being ready for any inspections or testing. 4 QUALITY ASSURANCE 4.1 GENERAL - The Contractor shall maintain an inspection system which shall insure that each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements. The inspection system shall be documented and available for review by the Coast Guard. 4.2 RECORDS - The Contractor shall maintain records of all inspections and tests. The records shall indicate the nature and number of observations made, the number and type of deficiencies found, and the corrective action taken. 4.3 CALIBRATION SYSTEM - The Contractor, as well as any subcontractors, shall be required to maintain a test equipment calibration program in compliance with ANSI/NCSL Z540- 1. The program shall be documented and traceable to the National Institute of Standards (NIST). 4.3.1 The calibration system records shall be maintained for inspection for the duration of any contract referencing this specification. 4.4 RESPONSIBILITY FOR INSPECTION - The Contractor shall be responsible for the performance of all inspection requirements specified herein. The Contractor shall provide space, personnel and test equipment for the conduct of all inspection requirements. All inspection and testing shall be performed at the Contractor?s plant or at other facilities acceptable to the Coast Guard. The Coast Guard reserves the right to verify or have performed any of the inspections set forth in this specification where such inspections are deemed necessary to assure that supplies and services conform to the prescribed requirements. 4.5 VISUAL INSPECTION - Prior to testing, all forgings shall be visually inspected for quality of workmanship, conformity to this specification and the intrinsic safety of equipment operation and the test apparatus. 4.6 INSPECTIONS/TESTS - The inspections/tests required herein are the minimum required and are not intended to supplant any controls, examinations, inspections or tests normally employed by the Contractor to assure the quality of the propeller shafts. 4.6.1 Ultrasonic Testing as stated in 3.2.2.1. 4.6.2 Final dimensional inspection reports as per paragraph. Error! Reference source not found..1 of this specification. 4.6.3 Chemical, Mechanical properties, & Charpy V-Notch tests per paragraph 3.2.2.1.1 of this specification. 4.6.4 Each shaft shall be inspected as required here and in MIL-S-23284A Section 4.4.3.1.4. 4.7 TEST AND INSPECTION REPORTS. One copy of any required inspection, test or tolerance check shall be sent to the Contracting Officer. 4.7.1 A copy of any test, inspection or tolerance check shall also be turned over to the Contracting Officer?s Representative upon his arrival at the contractor?s plant. 5.0 PRESERVATION, PACKAGING, PACKING & MARKING ? Each shaft shall be preserved, packaged, packed & marked as specified herein. 5.1 Preservation ? Cleaning, drying, preservatives, preservation application criteria, and methods of preservation shall be in accordance with MIL-DTL-2845E Section 3.15.2 ?Shafting Preservation?. 5.2 Packaging ? Shall be in accordance with MIL-DTL-2845 section 3.15.4. As stated below, the provision at FAR 52.212-2, Evaluation-Commercial Items, applies with the following addenda: Award of a contract will be based on the following criteria: Past Performance and price. Offerors are cautioned that the government intends to evaluate offers and award a contract without discussions. Therefore, offeror?s initial offer should contain its best terms. The contract will be awarded as a firm fixed price contract using simplified acquisition procedures. The following factors shall be used to evaluate offers: Past Performance and Price. 1) Price: The total price will be the evaluated price. 2) Past Performance: In accordance with FAR 52.212-1(b)(1) and the following the offeror is required to identify past or current contracts for efforts similar to this requirement. Offerors are to submit three (3) references. Provide as a minimum the following applicable information: contract number, type of service involved, total dollar amount, procuring activity or firm?s complete name, include addresses, telephone numbers and the point of contact. Past Performance will look at relevant experience, responsiveness, resources, quality and consistency of services, customer satisfaction, and management. The Government will award a contract resulting from this synopsis/solicitation to the responsible offeror whose offer conforming to the solicitation will be more advantageous to the Government, price and other factors considered. For the purpose of this solicitation past performance is approximately equal to price. Potential sources having the expertise and required capabilities are invited to submit proposals that will be considered by the agency. Proposals should be written and submitted in a legible format. Award will be made to the responsible offeror whose offer conforms to the solicitation. Proposals must contain the contractor?s Tax Information Number, and DUNS Number. Proposals must be received not later than 20 Feb 2008, 11:00 A.M. Local Alaska time. Proposals received after the date and time specified will not be considered. Offerors may fax their proposals to: +1 (555) 000-0000 Attn: Rebecca Budde or e-mail contact@example.gov. The following FAR clauses apply to this solicitation, and Offerors may obtain full text versions of these clauses electronically at http://www.arnet.gov/far: FAR 52.212-1, Instructions to Offeror-Commercial Items (Nov 2007), FAR 52.212.2, Evaluation Commercial Items (JAN 1999), FAR 52.212-3 Offeror Representations and Certifications-Commercial Items (NOV 2007) with Alt 1 included. FAR 52.212-4 Contract Terms and Conditions-Commercial Items (FEB 2007). FAR 52.212-5 Contract Terms and Conditions Required to Implement Statues or Executive Orders, Commercial Items (DEC 2007). The following clauses listed in 52.212-5 are incorporated: FAR 52.203-6, 52.215-1,52.219-6, 52.219-1, 52-219-8, 52-219-14, 52.219-28, 52-222-3, 52.222-19, 52.222-20, 52.222-21, 52.222-26, 52.222-35-36-37, 52-222-39, 52.225-1, 52.225-13, 52.232-1, 52.232-8, 52.232-23, 52.232-25, 52.232.33, 52.233-1, 52.233-2, 52.233-3, 52.242-2, 52.243-1, 52.249-2, 52.253-1 and HSAR 3052.209.70. Offerors are advised of the requirement to include a completed copy of the provision at FAR 52.212-3, Offeror Representations and Certifications-Commercial Items, with its offer. Offerors may contact Rebecca Budde at +1 (555) 000-0000 for information regarding the solicitation.

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS