Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

[2002-27] RFQP-CM Architecture West Mechanical Systems Improvement

Closed
PE-50300-RFP-2027-000000330State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

14 minutes ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

14 minutes ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside and Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline for this opportunity is November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which are expanded from State Water Resources Control Board standards to secure project financing. To avoid being deemed non-responsive, bidders must provide proof of specific actions within their bid package, including posting solicitations in an online publication for 30 consecutive calendar days, a print newspaper posting for at least one day, and documented utilization of the Small Business Administration and Minority Business Development Agency. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing, failure to meet the primary posting and agency utilization requirements prior to the opening date will result in disqualification.
RT CONTRACTOR CORP

POSTED

14 minutes ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

14 minutes ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a W9, a completed vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Contractors must comply with OSHA safety regulations, NFPA-101 life safety codes, EPA regulations, and all applicable local and state building codes. Insurance requirements include automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Grafton Job Corps

POSTED

14 minutes ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is seeking proposals for the interior renovation and repair of the North Wing dormitory in Troutdale, Oregon. The project focuses on restoring water-damaged areas, including residential rooms, bathrooms, common areas, and mechanical rooms, to return them to safe residential use. Key deliverables include the installation of drywall for approximately 300 square feet of floor area in mechanical rooms, the restoration of walls and ceilings, and the testing of restored mechanical, plumbing, electrical, fire/life-safety, and security systems. The contractor must provide a minimum one-year workmanship warranty and adhere to Center standards. This solicitation is a small business set-aside under NAICS 236220 and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100, Modification 1. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of the award. Proposals must include detailed relevant experience, a comprehensive description of the proposed work and phasing, and itemized pricing that remains firm for 60 days. The project timeline is scheduled for completion between February 1st and March 31st, 2024, with a response deadline for the solicitation set for November 20, 2026.
Career Systems Development Corporation

POSTED

14 minutes ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The Georgia Institute of Technology, acting on behalf of the Board of Regents of the University System of Georgia, is soliciting Statements of Qualifications for Construction Manager at-Risk services for Project No. 0535-2025, Architecture West Mechanical Systems Improvements, located on its Atlanta campus. This two-step procurement process begins with an RFQ for qualifications, with only firms deemed qualified being invited to proceed to a second step involving interviews and submission of fee proposals. The project scope includes replacing all terminal units and the central air handling unit, maintaining much of the existing ductwork while adding new controls, creating a dedicated space for mechanical systems supporting electrical infrastructure, and performing hazardous material abatement related to previously sampled duct mastic. The Construction Manager will provide comprehensive preconstruction services including technical review, cost verification, value engineering, schedule development, and evaluation, and will be responsible for construction methods, safety, and coordination of all contracts. The work is planned to occur during the summer 2027 recess from May to August, with an estimated construction cost limit of $4.2 million, subject to revision. Firms must meet strict minimum qualifications to be considered, including holding a valid Georgia General Contractor’s License, being registered to do business in Georgia, possessing sufficient bonding capacity and insurance coverage meeting specific financial strength requirements (A.M. Best A- or better, Class V or larger), maintaining an Experience Modification Rating of 1.2 or less, and demonstrating a current ratio of assets to liabilities of 1.0 or higher. All proposers are required to submit a Statement of Qualifications not exceeding 50 pages in PDF format, including mandatory certifications and affidavits such as Exhibit A (Certification of Truthfulness and Debarment Status), Exhibit B (Georgia Security and Immigration Compliance Act Affidavit for E-Verify registration), Exhibit G (Proposer’s Disclosure Statement detailing potential conflicts of interest), and completed fee proposal templates. The evaluation is weighted 45% toward relevant project experience and qualifications, 30% toward suitability and resources, and 25% toward firm stability. Only the highest-ranked firm’s fee proposal will be opened following interviews, and negotiations will proceed downward through the ranked list if an agreement cannot be reached. Submission must be made via email to Nicolas Palfrey by 2:00 PM Eastern Time on August 28, 2026, with strict formatting and naming conventions required. Any communication with the selection committee about the project from the issue date

General Info

Georgia Tech seeks qualified firms for CM at risk role on Architecture West mechanical upgrades by August 28, 2026.

Documents

8

Exhibit C CM_GC Fee Proposal for Project No. 0535-2025

DOCX, High priority: read this firstfee-proposal
High

Exhibit F - Project Cost Matrix for CM/GC Services Project No. 0535-2025

XLSX, High priority: read this firstcost-proposal-matrix
High

RFPQ 2002-27 Architecture West Mechanical Systems Improvements CM/GC Services

PDF, High priority: read this firstrfpq
High

Exhibit A Certification Form

DOCX, Low prioritycertification-form
Low

Exhibit B Contractor Affidavit for Project 0535-2025 Architecture West Mechanical Systems Improvements

DOCX, Low prioritycontractor-affidavit
Low

Exhibit D - Preconstruction Cost and Expenses Breakdown

XLSX, Low priorityexhibit
Low

Exhibit E - Construction Overhead Cost Breakdown

XLSX, Low prioritycost-breakdown
Low

Exhibit G Proposer's Disclosure Statement

DOC, Low priorityproposers-disclosure-statement
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia Institute of Technology
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia Institute of Technology
Office AddressN/A
Contacts
Donna Vongsouvan

Full Description

Show more
08/07/2026: GT Planning, Design & Construction (PDC) unit is soliciting Statements of Qualifications (Step 1 RFQ) from Firms interested in providing Construction Management (CM/GC) Services for a project known as ¿Project No. 0535-2025 Architecture West Mechanical Systems Improvements - GT Bid-Contract No. 2002-27 located at the Georgia Institute of Technology campus, Atlanta, Georgia. Respondents who are determined qualified may be shortlisted for Interview and offer fee proposals for these services (Step 2 RFP).
Please see attached CM-RFQP package in the ¿Documents¿ tab.

More opportunities from Georgia Institute of Technology

Same awarding agency

NAICS: 541330
SLED
1068-27 RFQ IDIQ_Construction Manager Cost Management Services
Solicitation # 1068-27
The Georgia Institute of Technology Office of Planning, Design and Construction is soliciting Qualifications Packages for solicitation number 1068-27 to establish an Indefinite Delivery Indefinite Quantity contract for Construction Manager Cost Management Services. The agency seeks highly qualified firms specializing in CM at Risk projects to provide on-call professional services in Atlanta, Georgia, including planning, design, and program estimates, cost models, value engineering studies, and change order cost evaluations. The contract is governed by the IDIQ General Consultant Contract and Georgia Tech’s Yellow Book, with a primary term of one year and the possibility of four one-year renewals. The selection process is multi-staged, where a committee evaluates Statements of Qualifications based on factors such as public works experience, W/MBE inclusion, firm proximity, and the qualifications of lead staff. Shortlisted firms may be invited to interview and must submit password-protected hourly rates for roles including Principals, Project Managers, Lead Cost Estimators, and Administrative Assistants. Awardees must comply with various legal mandates, including the Drug-Free Workplace Act, ADA guidelines, and Georgia state ethics and conflict of interest laws. Invoicing requires strict adherence to project-specific numbering and a detailed schedule of values, with all work subject to quality assurance reviews to ensure adequacy and correctness.
Engineering Services

POSTED

23 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS