Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from National Aeronautics And Space Administration was posted on November 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2024 Advanced X-ray Imaging Satellite (AXIS) Mirror Assembly Development - Partnership Opportunity Document (POD)

Closed
2024_Advanced_X-ray_Imaging_Satellite_AXIS_Mirror_Assembly_Development_PODFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336419
Federal
Weapons Shipping Harness Refurbishment Blanket Purchase Agreement
Solicitation # N6278927Q0001
Solicitation N6278927Q0001 is a request for quotes to establish a multiple award Blanket Purchase Agreement (BPA) for the refurbishment of SSN 688 class weapon shipping harnesses to support waterfront submarines at SUBASE New London in Groton, Connecticut. The scope of work includes the complete disassembly, refurbishment of all parts, reassembly, NDT testing, painting, and weight testing of these safety-critical tactical handling gear in accordance with NAVSEA specifications and strict naval nuclear safety standards. The BPA will have a five-year period of performance from January 27, 2027, to January 26, 2032, with a total ceiling of 500,000 USD and a per-call limit of 100,000 USD. Individual requirements will be competed among BPA holders based on the most advantageous quote. Awards will be made based on best value, evaluating technical qualifications and the ability to meet schedules, past performance, and price. Offerors must provide at least three references from the last three years and a description of their property management system. The procurement is not a small business set-aside and is limited to sources capable of meeting specialized military design and safety standards. Quotations are due by 4:00 PM EST on December 3, 2026, and must be submitted electronically. Contractors are required to use the Wide Area Workflow system for invoicing and must comply with CMMC cybersecurity requirements and SAM registration.
Supply Of Shipbuilding Groton

POSTED

9 days ago

DEADLINE

in about 1 month
NAICS: 336419
DIBBS
FLANGE, PIPE
Solicitation # SPE7M4-27-T-0838
Solicitation SPE7M4-27-T-0838, issued by the DLA Weapons Support Fluid Handling Division, is a request for quotations for eight 5-inch pipe flanges (NSN 4730-01-313-2154). The procurement is conducted under full and open competition with a need ship date of April 6, 2027, and a final required delivery date of May 2, 2027. Delivery is set as FOB Origin, with the destination being DLA Distribution San Joaquin in Tracy, California. The items are designated as critical application items and must adhere to specific technical drawings and specifications, including MIL-PRF-20042G. The contract imposes strict quality and environmental standards, requiring the manufacturer's inspection system to comply with SAE AS9003 or ISO 9001. Sampling must follow MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for acceptance. Prohibitions are in place regarding the use of Class I ozone-depleting chemicals and the intentional addition of mercury. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow DLA requirement RP001. Administrative requirements include electronic invoicing via Wide Area WorkFlow (WAWF) and compliance with various FAR and DFARS clauses, including the Buy American Act and the Berry Amendment. Cybersecurity compliance is mandatory, specifically referencing CMMC Level 2 and DFARS 252.204-7012 for safeguarding covered defense information. Additionally, a price evaluation preference is available for certified HUBZone Small Business Concerns.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

9 days ago

DEADLINE

in 1 day
NAICS: 336419
DIBBS
NIPPLE, PIPE
Solicitation # SPE7M3-27-T-0303
Solicitation SPE7M3-27-T-0303 is a request for quotations issued by the DLA Weapons Support Fluid Handling Division for the procurement of 674 copper alloy pipe nipples, identified by NSN 4730011152648. The items must be manufactured in accordance with ASTM B687 and are designated as critical application items. The contract prohibits the use of Class I ozone depleting chemicals and explicitly excludes any items produced via additive manufacturing processes. Delivery is required within 164 days after order, with an original required delivery date of March 17, 2027, and a need ship date of April 6, 2027. Shipping is FOB Origin, with the destination for inspection and acceptance located at DLA Distribution San Joaquin in Tracy, California. The procurement is subject to various federal regulations, including the Buy American Act and the Berry Amendment. Packaging must comply with ASTM D3951 and MIL-STD-129, while palletization must follow DLA requirement RP001. Quality assurance is managed through Certificate of Conformance procedures per FAR 52.246-15. Invoicing and payment are to be processed electronically via the Wide Area WorkFlow system. The solicitation is open to full and open competition, with a specific price evaluation preference provided for certified HUBZone small business concerns. Administrative contact for this requirement is William Cain.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

9 days ago

DEADLINE

in 1 day
NAICS: 336419
Federal
DRAFT STATEMENT OF WORK FOR REVIEW: BQM-34S Engine Repair, Overhaul and Conversion
Solicitation # RFI-N00019-242-25-076-SN
The Naval Air Systems Command is seeking industry feedback on a draft Statement of Work for the repair, overhaul, and conversion of J85-GE-5 and J85-GE-100A engines. This effort supports the United States Navy BQM-34S Subsonic Aerial Target under the Strengthen Target Inventory New Growth (STING) program. The scope of work includes performing Test, Teardown and Evaluation to return assets to Ready-for-Issue condition, executing repairs on J85-GE-100A engines, and converting J85-GE-5 engines into J85-GE-100A configurations. All work must be performed in accordance with Technical Manual 01-J85-2 and PPC50, with finished engines expected to have a service life of 10 to 15 operating hours. Key deliverables include TT&E results, performance evaluation results, and monthly progress reports. The contractor is responsible for all quality inspections, test cell verification, and packaging using government-furnished storage containers marked per MIL-STD-129. Security requirements are stringent, requiring personnel to be eligible for Non-Critical Sensitive work via a Tier-3 investigation and adherence to NIST SP 800-171 Rev 2 and CMMC Level 2 cybersecurity standards. Additionally, contractors must comply with DFARS 252.204-7012 for safeguarding covered defense information. This is currently a request for information, and feedback must be submitted to the contracting office by October 23, 2026.
Naval Air Systems Command

POSTED

13 days ago

DEADLINE

in about 23 hours

General Info

NAICS

336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

Place of Performance

Greenbelt, MD, USA

Set-Aside

NONE

Documents

2

NASA GSFC AXIS X-ray Mirror Assembly Development POD

PDF, High priority: read this firstrfi
High

NASA GSFC AXIS X-ray Mirror Assembly Partnership Opportunity Document

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Dec 10, 2024 to Dec 19, 2024. The notice description changed.

Deadline changed

Response deadline changed from Dec 19, 2024 to Dec 10, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNational Aeronautics And Space Administration → NASA Goddard Space Flight Center
Contacts2 people available
OfficeGREENBELT, MD, 20771, USA

Full Description

Show more
NASA Goddard Space Flight Center (GSFC), as part of its core function of implementing future space science missions, seeks partnerships with industry to build an X-ray telescope for AXIS (Advanced X-ray Imaging Satellite), a potential future astrophysics mission. This telescope consists of two major components: an X-ray mirror assembly (XMA) that focuses X-rays, and a detector system that records them. This POD pertains only to the building and testing of the mirror assembly. AXIS was recently selected for a Phase A study through the Astrophysics Probe Explorer (APEX) solicitation NNH23ZDA021O (https://www.nasa.gov/news-release/nasa-establishes-new-class-of-astrophysics-missions-selects-studies/). More information on APEX can be found at https://explorers.larc.nasa.gov/2023APPROBE/. More information on AXIS can be found at (https://axis.astro.umd.edu). The principal advance that AXIS will make over current and prior X-ray observatories is that it will combine high angular resolution (1.5 at the optical axis) with a large effective collecting area. This requires new technology. The construction and performance of current and previous NASA X-ray telescopes shows that, for the purpose of mission design, X-ray mirror assemblies can be characterized with three key metrics: (1) angular resolution, (2) mass per mirror surface area, which is proportional to the effective area, and (3) production cost per mirror surface area. Einstein's (1979) and Chandra's (1999) mirror assemblies were made by grinding and polishing thick substrates, achieving exquisite (<1) angular resolution at the expense of mass and cost. NuSTAR (2012) and XRISM (2023) used replication technologies and segmented mirror assemblies, achieving moderate (>60) angular resolution at very low mass and low cost. AXIS baselines mirror technology currently under development by the Next Generation X-ray Optics team (NGXO) at GSFC to achieve high angular resolution at low mass and low cost per mirror surface area. NGXO mirrors achieve high angular resolution through modern direct-fabrication techniques (grinding and polishing). They achieve low mass by using single-crystal silicon material, whose lack of internal stress allows post-fabrication lightweighting by grinding the mirror backside. Finally, the mirrors achieve low cost per unit area by combining a hierarchical and modular mirror-assembly design with a fabrication method optimized for mass production. The purpose of this POD is to select industry partner(s) with experience in the design, manufacture, assembly, test and delivery of precision optics to co-develop a manufacturable XMA architecture with the NASA AXIS team, including: 1) Participate in overall systems engineering for the XMA, including all aspects of the SE process, including XMA requirements development, validation planning and associated analysis, verification planning and associated test and facility specification and product transition of the XMA for observatory integration. 2) Participate in the Phase A study to work with the NASA AXIS team to improve NGXO mirror segment production and module integration techniques, formulate plans to manufacture the XMA, and estimate the cost and schedule for manufacturing the XMA. 3) Should AXIS be selected for implementation, manufacture the approximately 16,000 flight mirror segments and 260 mirror modules for the XMA, and deliver those modules to GSFC for acceptance testing and integration into the final mirror assembly. A description of the roles associated with the three co-development areas are articulated more clearly below. The decision to form a partnership for building the X-ray mirror assembly was informed by responses to a Request for Information (https://sam.gov/opp/f14b16a43cd147e4bbda771ad687512c/view) released in November 2023. The resulting government-industry partnership will fully define the acquisition strategy for the XMA. The acquisition strategy will define how mirrors based on the NGXO XMA design shall be manufactured to meet the requirements of high angular resolution, low mass, and low cost per unit area. Selected partners will join the NASA AXIS team to develop and deliver the XMA, including optimizing the technical and programmatic approach for building and delivering the XMA, and writing the Concept Study Report (CSR) required during Phase A. GSFC will negotiate Phase B contracts with selected partners if AXIS is selected for implementation. GSFC will retain independent technical authority over the entire AXIS project, including XMA mirror production and assembly. GSFC will maintain management and system engineering oversight of the entire XMA production and assembly. Final assembly of XMA will be conducted at GSFC. NOTE: Upon selection, GSFC may discuss and further tailor the roles proposed by respondents in the best interests of the proposal. The following schedule should be used as a basis for responses to this opportunity Competitive Phase A Start Date November 14, 2024 Concept Study Report (CSR) Due November 14 2025 Site Visit March/April 2026 (target) Down select June 2026 (target) AO-Required Launch Readiness Date NLT January 2032 (TBR) Cost and cost fidelity are important issues for the proposal. The cost cap for the APEX program is $1B (FY23$), excluding launch vehicle, and not including mission-specific adjustments to the cap. The proposed cost shall include the instrument, spacecraft, instrument to spacecraft integration support, environmental testing, launch site operations, and mission and science operations for a minimum of 5 years. Reserves will be held at the project level and not with any partners. There will be no exchange of funds between the industry partners during Phase A. Post CSR submission, the Government and industry partner will generate the necessary documentation, i.e., Government RFP, industry partner cost and technical proposal, Government cost and technical evaluation of industry partners proposal, etc. for a Bridge Phase B contract that will be awarded should NASA HQ down select the AXIS mission to proceed into Phase B. Upon down-selection and commensurate contract award, funding will be available for the industry partner to begin working with the AXIS project to manufacture the Mirror Segments and Mirror Modules.

More opportunities from National Aeronautics And Space Administration → NASA Goddard Space Flight Center

Same awarding agency

NAICS: 541715
New
Federal
HYDROSPHERE, BIOSPHERE, & GEOPHYSICS (HBG) SUPPORT SERVICES II - FINAL REQUEST FOR PROPOSAL (FRFP)
Solicitation # 80GSFC27R0015
The National Aeronautics and Space Administration Goddard Space Flight Center is soliciting proposals for the Hydrosphere, Biosphere, and Geophysics (HBG) Support Services II contract, under solicitation number 80GSFC27R0015. This small business set-aside is a hybrid Indefinite Delivery Indefinite Quantity (IDIQ) contract with a five-year effective ordering period. The contract allows for the issuance of both Cost Plus Fixed Fee (CPFF) and Firm-Fixed Price (FFP) task orders to support science research and computing activities across various laboratories, including the Cryospheric Sciences, Ocean Ecology, Hydrological Sciences, Biospheric Sciences, Geodesy and Geophysics, and the Terrestrial Information Systems Laboratory. The primary objective is to develop and apply space, field-deployed, and laboratory-based technologies to address societal issues related to water resources, ecosystems, sea level change, and the Earth's magnetic and gravity fields. The scope of work encompasses scientific modeling, simulation, data assimilation, satellite instrument performance analysis, and the planning and execution of field campaigns. Performance will occur at the Goddard Space Flight Center and the contractor's facilities, with acceptance managed by the Contracting Officer or a designated representative. Award selection will be based on a tradeoff approach, prioritizing Mission Suitability as the most important factor, followed by Cost and Past Performance. Proposals must be submitted in four volumes, including a numerically scored Mission Suitability volume and a detailed Cost volume. Additionally, the contractor must adhere to strict security requirements, including the provision of a Cyber Supply Chain Risk Management plan and compliance with NDAA Section 889 regarding telecommunications and surveillance equipment.
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
Federal
Ground Systems and Mission Operations-4 (GSMO-4)
Solicitation # RFI-GSMO4-2027
The National Aeronautics and Space Administration Goddard Space Flight Center is issuing a Request for Information for the Ground Systems and Mission Operations-4 (GSMO-4) contract. This effort seeks market intelligence and technical approaches from qualified vendors to support a diverse portfolio of science and Earth science missions, including the James Webb Space Telescope, Lunar Reconnaissance Orbiter, and the Nancy Grace Roman Space Telescope. The scope of work encompasses the entire mission life cycle, focusing on two primary functional areas: Mission Ground System Support Services, which includes systems engineering and integration and test services, and Mission Operations System Support Services, covering flight operations, launch and early orbit support, flight dynamics, and IT security. The government is specifically exploring a transition from a Cost-Plus-Award-Fee structure to a Firm-Fixed-Price model, potentially utilizing a catalog-style pricing structure based on mission risk classifications or a Core-plus-IDIQ structure for flagship missions. Technical requirements emphasize the adoption of modern DevSecOps methodologies, CI/CD pipelines, and Infrastructure as Code to automate mission operations. Contractors must adhere to strict NASA Procedural Requirements for systems engineering, software engineering, and cybersecurity, including maintaining Authority to Operate (ATO) and managing vulnerability scanning. Responses are due by October 26, 2026, and must include implementation approaches and rough order of magnitude costs.
Engineering Services

POSTED

15 days ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS