Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New Jersey was posted on April 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2024 Chapel Avenue Culvert Replacement

Closed
714State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The 2024 Chapel Avenue Culvert Replacement project, managed by Cherry Hill Township in New Jersey, focuses on critical infrastructure improvements along Chapel Avenue between Hastings Road and Douglas Drive. Funded by the American Rescue Plan Act of 2021 State and Local Fiscal Recovery Funds, the project addresses severe roadway deterioration and frequent sinkholes caused by a failing corrugated metal culvert. The scope of work includes replacing the existing culvert with a sixty-linear-foot double-cell box culvert, installing steel piling cut-off walls, and implementing scour protection and slope stabilization using reno-mattresses and gabion baskets. Additional improvements involve updating the stormwater conveyance system through the installation of reinforced concrete pipe and a new drainage structure. The project also encompasses significant roadway restoration, including the reconstruction of approximately 450 square yards of pavement near the culvert and a mill and overlay for an additional 750 square yards. Complementary work includes the replacement of curbs, sidewalks, inlets, fencing, and landscaping to ensure the long-term stability and safety of the area.

General Info

Cherry Hill Township project replacing Chapel Avenue culvert and restoring surrounding roadway infrastructure.

Place of Performance

NJ, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Jersey → Cherry Hill Township
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Source of Funding for this Project will include American Rescue Plan Act of 2021 (ARPA)   -  State and Local Fiscal Recovery Funds (SLFRF).Summary of Project Scope The Township of Cherry Hill is proposing construction improvements along Chapel Avenue between Hastings Road and Douglas Drive.   The improvements generally consist of replacement of an existing deteriorated arched corrugated metal culvert which runs in the southerly direction under Chapel Avenue, providing scour and erosion protection improvements adjacent to the culvert, updating stormwater conveyance infrastructure between Hastings Road and Douglas Drive and improving the roadway pavement and grading within the project limits on Chapel Avenue. The condition of the existing roadway and culvert have been monitored over time and the frequency of sinkhole development has increased, prompting continual repairs of the roadway over the culvert.  The presence of sinkholes and differential settlement of the subsoil continually impact the adjacent drainage inlets, curb, sidewalk, and roadway which is in severely deteriorating condition. The project consists of the following improvements; removal of the existing culvert and replacing with sixty (60) linear feet of double-cell, 7 foot span and 4 foot rise four-sided box culvert, construction of headwalls, installation of buried steel piling cut-off walls (5 feet deep), construction of reno-mattress scour protection within the entrance and exit channel of the culvert, construction of stone-filled gabion basket slope stabilization along the banks of the channel, removal, replacement and/or relocation of fencing and landscaping within the disturbed areas near the culvert, removal, replacement, addition and/or reconstruction of inlets on the roadway, removal and replacement of approximately 150 linear feet of reinforced concrete pipe, installation of a new 10 foot by 10 foot drainage structure with new connections between the stormwater conveyance and headwall, reconstruction of the roadway within proximity of the culvert replacement (~450 SY) and a 2” mill and overlay within the remaining area of Chapel Avenue between Hastings Road and Douglas Drive (~750 SY), replacement of curb and sidewalk, as well as other related miscellaneous improvements . PLEASE DOWNLOAD SPECIFICATIONS BELOW. Instructions to download: On the bottom left side of page, click VIEW DOCUMENTS. Upon completion and submission of the registration information, you will be returned to this page. The links for downloading each document will replace the View Documents link under the Related Documents section (bottom left of page).

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS