Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on July 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2024 Pavement Rehabilitation Project

Closed
C400809State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil infrastructure and site work. Key scopes of work include underground utilities such as tunneling, boring, jacking, micro tunneling, and cathodic protection; site preparation involving land surveying, site clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, traffic signals, lighting, and landscaping. Required materials include ready mix supply, precast concrete, manhole materials, and valves. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Additionally, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for bid submission is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

about 22 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim to improve roadway structure and pedestrian safety. The scope of work includes removing and reconstructing asphalt concrete pavement using rubberized asphalt concrete, installing ADA access ramps, sidewalks, curb and gutter, and adjusting utility pull-boxes. The project also encompasses the installation of striping, signage, and pavement markings. Work is located on Katella Avenue from Auburn Way to Douglass Road and State College Boulevard from Katella Avenue to Gene Autry Way. The estimated construction cost has been updated to 5,041,243.00 dollars, with a performance period of 70 working days from the Notice to Proceed. The contract is governed by the 2024 Standard Specifications for Public Works Construction and specific project special provisions. Award will be granted to the lowest responsive and responsible bidder holding a General Engineering (A) license. Bidders must be registered with the Department of Industrial Relations and agree to be bound by the Community Workforce Agreement. Key submission requirements include a 10 percent bid bond, a non-collusion declaration, and the use of the OpenGov portal for proposals. Performance is subject to strict scheduling, with work affecting CALTRANS Right-Of-Way restricted to overnight hours between 10:00 p.m. and 5:00 p.m. Monday through Friday. Final payment is contingent upon the approval of As-Built Plans submitted 21 days prior to the final invoice.
Public Works

POSTED

1 day ago

DEADLINE

in 4 days
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety (DPS) has issued Invitation for Bids (IFB) solicitation 405-26R0027374 for the Weatherford Parking Lot Replacement at the Weatherford Highway Patrol and Driver License Office. The project requires a comprehensive remove and replace approach, involving the milling of all existing asphalt surfaces to a minimum depth of 2.5 inches, prepping the area, and installing new asphalt with a minimum finished depth of 2.5 inches compacted to approximately 98 percent. The scope also includes full restriping of the lot, including handicap and fire lane markings, and the removal and resetting of wheel stops. To maintain operational continuity, the contractor must perform work during off-hours and provide a work phasing plan for agency approval. Bids are due electronically by 5:00 P.M. CT on November 13, 2026, via the DPS Online Bid Room or designated email. Responses must be organized into four volumes covering required contract forms, information bid details, a subcontracting plan, and a mandatory pricing schedule. Award decisions will be based on the best value standard, with a significant emphasis on past performance. Key requirements include adherence to Texas Government Code Chapter 2258 prevailing wage rates, the provision of performance and payment bonds for contracts exceeding specific thresholds, and the completion of fingerprint-based criminal history background investigations for personnel. All work must be performed by qualified craft persons with at least three years of field experience and comply with all state and local codes.
Department of Public Safety

POSTED

1 day ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The 2024 Pavement Rehabilitation Project aims to improve the safety and accessibility of key roadway segments including Escalona Drive, Highland Avenue, and Bay Drive in California. The project involves replacing deteriorated asphalt pavement and installing new striping to enhance traffic flow and reduce conflicts among motorists, bicyclists, and pedestrians. Key improvements include the installation of ADA-compliant curb ramps and sidewalks along the south side of Escalona Drive, as well as the addition of protected bike and pedestrian paths along Bay Drive, with designated bike lanes on both northbound and southbound directions. The striping enhancements will feature shared lane markings and buffers where feasible to promote safer and more organized travel. The contract, titled the "2024 Pavement Rehabilitation Project," was posted on July 2, 2024, with a response deadline of August 1, 2024. It is managed by the California Public Works agency under solicitation number IFB No. PW-0157, with a project budget estimated between two and five million dollars. The project emphasizes accessibility and safety improvements, aligning with ADA standards, and aims to facilitate smoother, safer interactions among all roadway users. Interested parties can contact Miguel Lizarraga via email or phone for further details and access project information through the designated procurement portal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

3
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A
Contacts

Full Description

Show more
The project will replace deteriorating asphalt pavement and install new striping that will help reduce any potential conflict between motorists, bicyclists, and pedestrians. In addition to paving, the proposed improvements in the project area (Escalona Dr, Highland Ave, and Bay Dr) include the replacement of non-Americans with Disability Act (ADA) compliant curb ramps with compliant curb ramps, installation of an ADA-compliant sidewalk along the southside Escalona corridor, installation of a protected bike and pedestrian path along northbound Bay Drive, protected bike lane along southbound Bay Drive. The striping improvements include but are not limited to, shared lane markings and bike lane buffers where possible.

More opportunities from California → Public Works

Same awarding agency

NAICS: 561730
New
SLED
Independence Jail Landscaping
Solicitation # ZP 24-020
The Independence Jail Landscaping project, managed by the Inyo County Public Works Department under solicitation ZP 24-020, involves comprehensive landscaping services including excavation, grading, irrigation installation, and planting. The project requires a contractor with at least one year of landscaping experience and a valid CA State License Board number. Key technical requirements include adherence to the Model Water Efficient Landscape Ordinance (MWELO), the provision of a Soil Management Report, and the implementation of an irrigation system with a distribution uniformity low quarter of 0.65 or higher. The contractor is responsible for providing all labor, materials, and equipment, as well as delivering training on planting techniques and ongoing maintenance. All work must comply with the 2010 Americans with Disabilities Act (ADA), Inyo County Public Works Standard Specifications from May 2020, and prevailing wage rates. Bids must be submitted electronically via the OpenGov portal by December 11, 2026. Required submission materials include a bid proposal, vendor certifications, and a proposal guarantee of ten percent of the total bid amount. Upon contract award, the contractor must provide a Faithful Performance Bond and a Labor and Materials Payment Bond, both for 100 percent of the contract amount. The estimated construction cost for the project is 97,140.00. Final acceptance is contingent upon a Certificate of Completion certified by a licensed landscape contractor or architect, supported by as-built drawings, irrigation audit reports, and soil analysis documentation.
Landscaping Services

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541330
New
SLED
Etnies Skatepark Improvement Project (25P03)
Solicitation # 25P03
The City of Lake Forest is soliciting proposals for the Etnies Skatepark Improvement Project (25P03) to modernize its 62,000 square foot facility. The selected consultant will refine two preliminary concept designs into a final design and prepare a complete, bid-ready Plans, Specifications, and Estimates (PS&E) package. Key project enhancements include the addition of an 8,000 square foot all-wheel pump track, improvements to street lanes, the street plaza, and various bowls, the removal and replacement of the cradle, and the integration of public art. The consultant must coordinate with a separate ongoing project for skatepark building renovations and develop a construction phasing plan that minimizes operational disruptions. Proposals are due by December 4, 2026, and must be submitted via the City's eProcurement portal. The prime consultant can be any qualified firm providing a team with expertise in public skatepark design, municipal civil engineering, and public art. Evaluation is based on a pass/fail review of licenses and conflicts of interest, a qualitative assessment of technical knowledge, and a cost proposal evaluated on a time and materials, not-to-exceed basis. The anticipated project start date is February 9, 2027, with an initial contract term running through January 19, 2030, and options for two additional one-year extensions. Consultants who prepared the preliminary concept designs are ineligible to participate in this phase.
Engineering Services

POSTED

1 day ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The City of Tustin is soliciting bids for the Tustin Legacy Linear Park Phase 3 project (CIP No. 20083), located between Armstrong and Warner. This construction project involves the development of a multi-modal park featuring a 12-foot main multi-modal path, a 6-foot secondary walking trail, a playground with PIP rubber surfacing, fitness pods, and an Esplanade along Compass Avenue using concrete pavers. Additional scope includes landscaping, irrigation, pedestrian and street lighting, and the implementation of a planted bioretention swale for stormwater management in compliance with Orange County NPDES requirements. The engineer's estimate for the project is 11,100,000 dollars, with a construction duration of 190 working days and a subsequent 90-working-day plant establishment and maintenance period. Bids are due electronically via OpenGov by December 10, 2026, at 2:00 PM PT, with a mandatory hard copy of the bid bond delivered to the City Clerk. The contract will be awarded to the apparent low bidder who meets all responsiveness requirements, including the submission of a Class A contractor's license, project references, and a list of subcontractors for work exceeding 0.5 percent of the total bid. Awarded contractors must provide payment, faithful performance, and guaranty bonds within 10 working days of notification. Payment will be issued through monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. All work must adhere to 2008 ADA Standards for Accessibility and Cal-OSHA safety requirements.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS