This Solicitation opportunity from Georgia was posted on August 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
#2025-18 Brookwood Culvert Replacement Phase 2
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract for the Brookwood Circle Culvert Replacement Phase 2 involves the removal and replacement of an approximately 30-foot section of existing box culvert with a new structure roughly 35 feet long, 9 feet wide, and 5 feet high, including associated headwalls, wingwalls, storm drainage, and utility conflict resolution within Covington, Georgia. Bids are due by 10:00 a.m. on September 9, 2025, with public opening at 10:30 a.m. at a specified Covington location. The project scope emphasizes compliance with Georgia utility licensing, employment verification via E-Verify, and bonding requirements—specifically a 5% bid bond and 100% performance and payment bonds, all to be furnished upon contract award. Bidders must obtain bid documents for a non-refundable fee of $200 from GWES, LLC, which include instructions, bid forms, technical drawings, and specifications. A pre-bid conference is scheduled for August 19, 2025, and RFIs are due by August 26, 2025. The contractual framework is governed by state and local regulations, notably Georgia statutes related to utility contracting and employment verification, with no explicit incorporation of federal FAR clauses. The owner reserves broad discretion to reject any or all bids based on responsiveness, responsibility, or other criteria, without specified evaluation weights or scoring systems. Bonding, licensing, and legal compliance are mandatory, but there are no references to security clearances, options, or OCI provisions. The project’s technical and administrative oversight is managed through the City of Covington, with key contacts including Mike Willis and GWES, LLC representatives. Overall, the contract emphasizes strict adherence to licensing, bonding, and employment verification requirements, with procurement conducted through sealed bids and detailed documentation obtained from the designated contractor.
General Info
Place of Performance
GA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
