2025 ISO-NE Capacity RFP

Closed
NAState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221112
Federal
SPE60427R0400 - MISO 2027
Solicitation # SPE60427R0400
Solicitation SPE60427R0400 is a request for proposal issued by DLA Energy for a Firm Fixed-Price Requirements Type contract to supply electricity, including ancillary and incidental services, to various Department of War and Federal Civilian facilities within the Midcontinent Independent System Operator (MISO) market area. The scope covers four specific locations: the Army Corps of Engineers, Scott Air Force Base, the US Department of Agriculture-National Center for Agriculture Utilization Research, and the Illinois Air National Guard. The contract features a 24-month delivery period starting from the May 2027 meter read date through the May 2029 meter read date, with a total estimated quantity of 240,033,144 kWh across four contract line item numbers. The award will be based on the best value, considering price and non-price factors. Past performance is the most critical non-price factor, followed by technical capability and risk, and finally small business participation. Price is weighted approximately equal to the combined non-price factors. Proposals must be submitted through the PIEE Solicitation module, and pricing will be handled via a reverse auction at a later date. Offerors must maintain active SAM registration and provide a Unique Entity Identifier and CAGE code. The contract incorporates standard commercial terms under FAR 52.212-4 and includes specific requirements for HUBZone and small business preferences, as well as Buy American and domestic commodity certifications.
DLA Energy

POSTED

26 days ago

DEADLINE

in 14 days
NAICS: 221112
SLED
Northtown Backup Generating Facility
Solicitation # 25-SPPE-02
The Northtown Backup Generating Facility is a 97.3 megawatt diesel-fired emergency power system designed to provide uninterrupted backup power exclusively to the Northtown Data Center in San José, California, without any connection to the transmission or distribution grid. Located on a 28.5-acre site at the southwest corner of West Trimble Road and Orchard Parkway on APNs 101-02-018 and 101-02-021, the facility will consist of 42 diesel generators—40 rated at 3 megawatts each and two smaller units at 1.75 megawatts—arranged in two generation yards adjacent to the data center buildings. Of the 3-megawatt units, eight are designated as redundant to ensure reliability. The two smaller generators will support office loads, building systems, and life safety services. The facility will include a new 115-kilovolt to 34.5-kilovolt, 110-megavolt-ampere electrical substation with a two-bay, two-transformer design, allowing one transformer to be taken offline without loss of service, effectively providing 105 megavolt-amperes of redundancy. On-site diesel fuel storage capacity is 234,000 gallons, and the generators will operate using renewable diesel fuel to minimize emissions and comply with sustainability mandates. The project is subject to comprehensive environmental review under the California Environmental Quality Act and requires permits from the Bay Area Air Quality Management District, the City of San José, the California Department of Fish and Wildlife, and the Federal Aviation Administration for structure height compliance. It must also participate in San José Clean Energy’s Total Green program to ensure 100 percent carbon-free electricity use. The California Energy Commission is the lead agency overseeing the project and has determined it qualifies for an exemption under Public Resources Code §25541. All generators must meet Tier 4 emissions standards with controls for nitrogen oxides and diesel particulate matter. Environmental mitigation measures include noise reduction, wildfire risk management, and protection of biological and cultural resources, with preconstruction surveys mandated. The project is currently in the environmental review phase, with a public comment period scheduled from July 21 to August 20, 2026. No procurement or contract pricing details are available, and while the project is not governed by federal acquisition regulations, compliance with state and local environmental, zoning, and safety codes
Energy Commission

POSTED

4 months ago

DEADLINE

N/A

AI Contract Overview

Show more

PSEG Long Island, representing the Long Island Power Authority (LIPA), issued a request for proposals (RFP) on October 24, 2025, to secure up to 345 megawatts of capacity from generating facilities within the New England Control Area. The capacity is intended to serve the NYISO Capability Years from 2027 to 2032 and must qualify as Locational Installed Capacity for Long Island, specifically for NYISO Load Zone K. Each proposal is required to provide a minimum offering of 25 MW from an individual project. The RFP allows for submissions from facilities capable of providing long-term firm capacity with service commencement dates on May 1 of each year between 2027 and 2031, depending on the proposal selected. The timeline for the RFP includes a question submittal period from October 24 to December 12, 2025, with final proposals due by December 18, 2025, at 5:00 PM Eastern Time. Proposal selections are expected by March 27, 2026, and contract negotiations must conclude by May 15, 2026, with LIPA Board approval anticipated in June 2026. Firm pricing is required through August 31, 2026, and all approvals should be in place by that date. There are no set-aside goals or subcontracting requirements for minority, women, or service-disabled veteran-owned businesses. The contract applies to Nassau and Suffolk counties, and similar contracts have previously been awarded to companies such as Millennium Power Company LLC and Calpine Energy Services LLC. For inquiries and proposal submissions, designated contacts and email addresses are provided.

General Info

PSEG Long Island seeks up to 345 MW capacity for 2027-2032 NYISO Load Zone K projects.

Place of Performance

Nassau, Suffolk, NY, USA

Set-Aside

MWBE

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • IGF::OT::IGF AEP Electric Power AgreementOpen now
  • Associated Gas Collection and Power Generation SystemOpen now, due in 4 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jan 6, 2026 to Dec 18, 2025. The notice title changed. The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Long Island Power Authority
Contacts2 people available
OfficeN/A

Full Description

Show more
On October 24, 2025, PSEG Long Island, as agent of and acting on behalf of LIPA, issued a request for proposals, the 2025 ISO-NE Capacity Request for Proposals, to procure up to 345 MW of Capacity from one or more generating facilities located in the New England Control Area for the NYISO Capability Years 2027 – 2028, 2028 – 2029, 2029 – 2030, 2030 - 2031, and 2031 - 2032, which are eligible to qualify as Locational Installed Capacity for Long Island (Load Zone K) under the applicable NYISO Rules. Each Proposal must offer a minimum of 25 MW from a single Project. Any questions or needed clarifications concerning this RFP should be sent to: Sign up to see this detail. RFP Target Dates Activity Target Date Release of RFP Oct 24, 2025 Question Submittal Window Oct 24, 2025 – Dec 12, 2025 Proposal Submittal Deadline Dec 18, 2025, 5:00 PM EPT Proposal Selection(s) Mar 27, 2026 CPA Negotiations Completed May 15, 2026 LIPA Board of Trustees Approval June, 2026 Firm Pricing Required Through Aug 31, 2026 NY State Approvals (Effective Date)* Aug 31, 2026 Service Commencement Date(s) May 1, 2027, May 1, 2028, May 1, 2029, May 1, 2030, or May 1, 2031, as applicable Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Due date:12/18/2025 5:00 PM Contract term: 5 County(ies): Nassau, Suffolk Business entities awarded an identical or substantially similar procurement contract within the past five years: Millenium Power Company LLC Calpine Energy Services LLC

More opportunities from New York → Long Island Power Authority

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS