Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New Jersey was posted on August 5, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Sanitary Sewer Maintenance Program

Closed
806State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The 2025 Sanitary Sewer Maintenance Contract involves comprehensive work to maintain and rehabilitate the sanitary sewer system within the South Erlton neighborhood of Cherry Hill Township, Camden County, New Jersey. The project encompasses a wide range of tasks including mobilization, pre- and post-construction cleaning, televising inspections, and the installation of cured-in-place pipe linings for 8-inch sewers. Additionally, the contract requires reinstating laterals after lining, removing protruding service connections, and rehabilitating manholes using specified lining systems. The scope also includes the removal and replacement of ladder rungs, excavation and repair of sewer segments at various depths, and ensuring the sanitary system's integrity through targeted repairs. Traffic management is a critical component, with the contractor responsible for providing maintenance and protection of traffic, including the deployment of police traffic directors when directed. The work must be performed with all necessary labor, materials, equipment, and supervision, adhering to specified safety and procedural standards. The contract, issued by Cherry Hill Township and managed under New Jersey regulations, has a value ranging from $500,000 to $2,000,000, with a response deadline set for August 27, 2025. This project aims to improve the functionality and longevity of the sewer infrastructure through systematic rehabilitation and maintenance efforts.

General Info

The work included under this Contract shall consist of furnishing all labor, materials, equipment, tools, and supervision required to complete the “2025 Sanitary Sewer Maintenance Contract” Project along various roadways within the South Erlton neighborhood including various locations for manhole rehabilitation within Cherry Hill Township, Camden County, New Jersey.DESCRIPTIONIn general, the scope of this project includes but is not limited to the following:A. Mobilization (Maximum 3% of Contract per NJAC 7:14-2.9) – Mobilize to the project site. Provide bonds, insurance, and documentation required as part of these Contract Documents.B. Pre and Post Construction Cleaning and Televising – Provide pre and post lining cleaning and television inspections of the sanitary sewer system; all debris removed from sanitary sewer shall be disposed of at an approved disposal site.C. Bypass Pumping System, if and where directed – Provide all required by-pass pumping systems as specified herein.D. Cured-In-Place Pipe Lining, Sanitary Sewer, Complete (8-inch) - Rehabilitate sanitary sewer of varying size, using cured-in-place pipe lining, as specified herein.E. Lateral Reinstatement after CIPP Liner Installation ( 8-inch) – Reinstate all sewer laterals after the completed lining of sanitary sewer, as specified herein.F. Removal of protruding service connections – remove or trim protruding service connections that will affect sG. Sanitary Sewer Manhole Rehabilitation, Complete – Rehabilitate sanitary sewer manholes utilizing a lining system, as specified herein.H. Ladder Rungs, Installation Complete – Removal of existing ladder rungs and reinstall new as specified herein.I. Sanitary Sewer Repair of varying depths – As directed by Department of Engineering, excavate and repair identified segments. Shall include bedding, select fill and dga.J. Maintenance and Protection of Traffic – Contractor shall provide for all necessary traffic control.K. Police Traffic Directors, if and where directed - Contractor shall provide uniform police for traffic control purposes as specified herein.PLEASE SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION

Place of Performance

NJ, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Jersey → Cherry Hill Township
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work included under this Contract shall consist of furnishing all labor, materials, equipment, tools, and supervision required to complete the “2025 Sanitary Sewer Maintenance Contract” Project along various roadways within the South Erlton neighborhood including various locations for manhole rehabilitation within Cherry Hill Township, Camden County, New Jersey.DESCRIPTIONIn general, the scope of this project includes but is not limited to the following:A. Mobilization (Maximum 3% of Contract per NJAC 7:14-2.9) – Mobilize to the project site. Provide bonds, insurance, and documentation required as part of these Contract Documents.B. Pre and Post Construction Cleaning and Televising – Provide pre and post lining cleaning and television inspections of the sanitary sewer system; all debris removed from sanitary sewer shall be disposed of at an approved disposal site.C. Bypass Pumping System, if and where directed – Provide all required by-pass pumping systems as specified herein.D. Cured-In-Place Pipe Lining, Sanitary Sewer, Complete (8-inch) - Rehabilitate sanitary sewer of varying size, using cured-in-place pipe lining, as specified herein.E. Lateral Reinstatement after CIPP Liner Installation ( 8-inch) – Reinstate all sewer laterals after the completed lining of sanitary sewer, as specified herein.F. Removal of protruding service connections – remove or trim protruding service connections that will affect sG. Sanitary Sewer Manhole Rehabilitation, Complete – Rehabilitate sanitary sewer manholes utilizing a lining system, as specified herein.H. Ladder Rungs, Installation Complete – Removal of existing ladder rungs and reinstall new as specified herein.I. Sanitary Sewer Repair of varying depths – As directed by Department of Engineering, excavate and repair identified segments. Shall include bedding, select fill and dga.J. Maintenance and Protection of Traffic – Contractor shall provide for all necessary traffic control.K. Police Traffic Directors, if and where directed - Contractor shall provide uniform police for traffic control purposes as specified herein.PLEASE SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS