This Solicitation opportunity from Indiana was posted on March 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Allen County Surveyor's Office in Indiana is soliciting bids for the 2025 Spring Spray project, which involves the chemical treatment of woody brush and broadleaf weeds across numerous regulated drains throughout the county. The scope of work covers a wide range of locations, including the Valentine, Joseph Harding, Fogwell No.1, Yant, Bobay Br.2, Koehlinger No.1, Geller, Adams, Witzgall No.1, Roy Delagrange, Schmidt, Dawson Br 2, Bohnke, Houk, Berger and McArdle, Willow Creek, Grover No.2, Robinson Brindle, Flatrock, James T. Johnson, Bruick Br of Bullerman, Simmerman, and Edgerton-Carson drains. Contractors are required to treat both sides of the ditches from top of bank to top of bank, including a 40-foot working easement, and must achieve a minimum 85 percent kill rate of targeted foliage.
Bids must be submitted in sealed envelopes to the Allen County Surveyor's Office by 9:00 A.M. on April 4, 2025. A complete bid package must include a signed contract, a notarized affidavit, a spray list with the contractor's initials beside the selected drains, a valid Indiana State Chemist Category 6 chemical spray license, and a certificate of liability insurance. All work must be completed by June 10, 2025, with some individual project deadlines extending to June 20, 2025. Payment is structured with 80 percent paid upon completion and the remaining 20 percent released after a 60-day monitoring period, contingent upon the submission of a detailed spraying log documenting application dates, weather conditions, and materials used.
General Info
Bids for Allen County 2025 Spring Spray project due April 4, 2025.
HighAI Summary for Allen County Surveyor - Adams Regulated Drain Maintenance Proposal: Request for proposal for the chemical spraying and maintenance of the Adams regulated drain in Adams Township, Section 27. The project involves treating 5,345 linear feet of woody brush and broad leaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Allen County Surveyor's Office 2025 Spray Bid Package: Solicitation package for 2025 ditch bank spraying services for the Allen County Surveyor's Office. The document includes submission instructions, a required notarized affidavit, a chemical spray subcontract agreement, and the standard contract for ditch bank spraying. Bids must be submitted in sealed envelopes by 9:00 AM on Friday, April 04, 2025. Key requirements include a Category 6 chemical spray license, liability insurance, and a guaranteed 85% kill rate of affected foliage, with all work to be completed by June 10, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Berger and McArdle Drain Maintenance Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying and maintenance of the Berger and McArdle Regulated Drains in Monroe Township. The project involves treating a total of 3,843 linear feet of drains, including woody brush and broad leaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bobay Br.2 Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Bobay Br.2 Drain in Washington Township (STA 0+00 to 31+22). The project involves treating woody brush and broad leaf weeds over 3,122 linear feet. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Bohnke Regulated Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Bohnke Drain in Madison Township (Sec 19), covering 3,500 linear feet from STA 32+00 to STA 67+00. The project requires treatment of woody brush and broad leaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bruick Br of Bullerman Br.7 Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Bruick Br of Bullerman Drain (Drain #: 13-01-070) in St. Joseph Township. The project covers 1,618 linear feet of woody brush and broad leaf weed treatment. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Dawson Br 2 Regulated Drain Maintenance/Repair Proposal: A request for proposals from the Allen County Surveyor's Office for chemical spraying and maintenance of the Dawson Br 2 Drain in Eel River Township (Section 15). The project covers 3,264 linear feet of drain maintenance, including woody brush and broad leaf weed treatment. Bids must be submitted by 9:00 A.M. on Friday, April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Edgerton-Carson Drain Maintenance/Repair Proposal (Drain #10-21-100): A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Edgerton-Carson Drain in Maumee Township (Section 21). The project covers 13,250 linear feet of woody brush and broad leaf weed treatment. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Ellison No 2 Regulated Drain Maintenance/Repair Bid: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Ellison No 2 Drain in Jackson Township, Section 31. The project involves treating 6,400 linear feet of woody brush and broad leaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Flatrock Regulated Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Flatrock Drain in Jackson Township (Sec 32). The project involves treating 8,290 linear feet of woody brush and broad leaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Fogwell No.1 Drain Maintenance/Repair Proposal: Solicitation from the Allen County Surveyor's Office for the chemical spraying of cattails on the Fogwell No.1 Drain (Drain # 16-12-700) in Lafayette Township, Section 12. The project covers 1,513 linear feet from STA 15+00 to STA 30+13. Requirements include a category 5 aquatic license and the inclusion of all de-brushing or access issues in the bid price. Bids must be submitted by 9:00 A.M. on Friday, April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Geller Drain Maintenance/Repair Proposal (Drain #01-31-940): A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Geller Drain in Eel River Township (Sec 28). The project involves treating 7,400 linear feet of woody brush and broadleaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Geller Regulated Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Geller drain in Eel River Township (Sections 31, 32, 28, 27). The project covers 21,700 linear feet of drain maintenance, including woody brush and broad leaf weed treatment. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Grover No.2 Regulated Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Grover No.2 Drain in Milan Township (Sec 23). The project involves treating woody brush and broad leaf weeds for 6,865 linear feet from STA 11+35 to STA 80+00. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Houk Regulated Drain Maintenance/Repair Proposal: A request for bids from the Allen County Surveyor's Office for chemically spraying the Houk Regulated Drain in Madison Township, Section 19. The project involves treating 3,800 linear feet of woody brush and broad leaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for James T. Johnson Regulated Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying and maintenance of the James T. Johnson regulated drain in Lake Township, Section 8. The project involves treating woody brush and broadleaf weeds for approximately 300 linear feet, including a 20-foot easement on both sides. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Joseph Harding Drain Maintenance/Repair Proposal (Drain #09-30-920): A solicitation from the Allen County Surveyor's Office for the chemical spraying and maintenance of the Joseph Harding Drain in St. Joseph Township (Sec 25). The project involves treating 2,400 linear feet of woody brush and broadleaf weeds, including a 40-foot easement. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Koehlinger No.1 Regulated Drain Maintenance/Repair Bid: A solicitation from the Allen County Surveyor's Office for the chemical spraying of woody brush and broad leaf weeds for the Koehlinger No.1 and Munch drains in Marion Township. The project covers a total of 6,893 linear feet. Bids must be submitted by 9:00 A.M. on Friday, April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Robinson Brindle Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Robinson Brindle Drain (Drain #11-35-664) in Lafayette Township. The project involves treating 14,800 linear feet of woody brush and broadleaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Roy Delagrange Regulated Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Roy Delagrange drain in Perry Township (Sec 28). The project involves treating woody brush and broad leaf weeds for 6,955 linear feet between STA 113+75 and STA 185+88. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Schmidt Drain Maintenance/Repair Proposal - Drain #13-23-310: A solicitation from the Allen County Surveyor's Office for the chemical spraying and maintenance of the Schmidt Drain in Adams Township (Sec 36). The project involves treating 6,100 linear feet of woody brush and broad leaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Shoaff Dawson Regulated Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Shoaff Dawson Drain (Drain #12-07-360) in Eel River Township. The project covers 9,132 linear feet of drain maintenance, including woody brush and broad leaf weed treatment. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Simmerman Regulated Drain Maintenance/Repair Proposal: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Simmerman Drain in Marion Township (Sec 31). The project covers 9,781 linear feet of drain maintenance, including treatment of woody brush and broad leaf weeds. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion deadline of June 20, 2025.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Valentine Drain Maintenance/Repair Proposal (Drain #18-28-800): A solicitation from the Allen County Surveyor's Office for the chemical spraying and maintenance of the Valentine Drain in Marion Township (Sec 32). The project involves treating woody brush and broadleaf weeds for 5,625 linear feet from STA 23+75 to STA 80+00. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Willow Creek Br.8 Regulated Drain Maintenance/Repair Bid: A solicitation from the Allen County Surveyor's Office for the chemical spraying of woody brush and broad leaf weeds along the Willow Creek Br.8 Drain in Perry Township (Sec 8). The project covers 4,230 linear feet from STA 31+00 to STA 73+30. Bids are due by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Willow Creek Main Drain #02-10-430 Proposal for Maintenance/Repair: A request for bids from the Allen County Surveyor's Office for the chemical spraying of woody brush and broad leaf weeds along the Willow Creek Main drain in Jackson Twp/Sec 13. The project covers 5,000 linear feet from STA 135+00 to 185+00. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfq
HighAI Summary for Witzgall No. 1 Regulated Drain Maintenance/Repair Bid: A solicitation from the Allen County Surveyor's Office for the chemical spraying and maintenance of the Witzgall No. 1 Drain in Lafayette Township. The project involves treating woody brush and broad leaf weeds for 4,780 linear feet. Bids must be submitted by 9:00 A.M. on April 4, 2025, with a project completion date of June 20, 2025.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for Yant Drain Maintenance/Repair Proposal - Eel River Township: A solicitation from the Allen County Surveyor's Office for the chemical spraying of the Yant Drain in Eel River Township. The project covers 7,100 linear feet of woody brush and broad leaf weed treatment. Bids must include all necessary de-brushing and access resolution, with specific spray mix requirements based on the date of application. Bids are due by 9:00 A.M. on Friday, April 4, 2025, with a project completion date of June 20, 2025.