Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on January 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2025 Street Reconstruction Program

Closed
0510-001-2025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; extensive pipeline and utility work involving tunneling, boring, jacking, and the installation of steel casing and cathodic protection; and surface improvements including asphalt paving, lighting, and landscaping. Additionally, the project requires environmental and support services such as storm water pollution prevention, quality control, and waste management, as well as the supply of ready mix, precast concrete, and manhole materials. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. All quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 16 hours ago

DEADLINE

in 27 days
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 17 hours ago

DEADLINE

in 11 days
NAICS: 237310
New
SLED
Bridge Front Upgrade Project (Re-Bid)
Solicitation # ITB27-6310-01B
The City of Lauderdale Lakes is soliciting bids for the Bridge Front Upgrade Project (ITB27-6310-01B) through its Public Works Administration. The scope of work involves the installation of decorative walls and pavers, swale regrading, minor drainage modifications, curb and pavement restoration, and signing and marking. All work must adhere to applicable building codes, City standards for dust nuisance abatement, and ADA guidelines for detectable warnings. Bids must be submitted via the City's eProcurement portal by December 9, 2026, at 3:00 PM. Qualified firms must demonstrate a track record of completing at least two similar projects in Florida and provide necessary licensing, certificates of competency, and a federal tax ID. Required submission documents include a bid bond, certificates and affidavits for bonds, and forms for subcontractors and principal materials manufacturers. The City evaluates respondents based on the licensing of supervising personnel, owned equipment, and confirmation of a drug-free workplace. The contract includes strict compliance requirements, including the Florida Trench Safety Act, E-Verify for employment eligibility, and certifications regarding scrutinized companies and foreign concerns. The successful contractor must provide performance and payment bonds in accordance with Florida Statutes and maintain all required insurance, submitting renewals 30 days prior to expiration. Payments are processed through the City's Accounts Payable Department within 30 days of invoice receipt, with a 15-day window for the City to notify the contractor of any disputed amounts.
Public Works Administration

POSTED

about 17 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The City of West Des Moines is soliciting electronic bids for its 2025 Street Reconstruction Program, specifically focusing on the reconstruction of Giles Street from Valley West Drive to just west of 32nd Street. The project involves removing existing pavement, replacing it with Portland Cement Concrete (PCC) pavement, and updating storm sewer and watermain infrastructure along with replacing affected driveways, sidewalks, and ADA-compliant curb ramps. The work also includes surface restoration and traffic control measures, all to be executed in accordance with approved plans prepared by WHKS & Co. Bids must be submitted electronically by February 5, 2025, with a bid bond or cashier’s check equal to 10% of the bid amount required as security. The selected contractor will need to provide a performance and payment bond covering 100% of the contract value and a four-year maintenance guarantee post-completion. Work is scheduled to commence within ten days of the notice to proceed and must be completed by September 30, 2025, with liquidated damages of $500 per day for delays. The bidding process emphasizes compliance with Iowa statutes, including preferences for Iowa-grown products and domestic labor, and requires submission of a Bidder Status Form. The City reserves the right to reject any or all bids and to waive technicalities or irregularities. Payment will be made in installments based on monthly estimates, with final settlement in accordance with statutory procedures. The project documents, including plans and specifications, are available online, and assistance with the electronic submission process can be obtained through the City Clerk’s Office. The overall goal is to enhance infrastructure while adhering to federal and state procurement regulations, ensuring transparency and accountability in the construction process.

General Info

Place of Performance

IA, USA

Set-Aside

NONE

Documents

6
PDF, High priority: read this firstengineers-estimate
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstbid-bond
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstspecifications
High
PDF, Low prioritybidder-status-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → West Des Moines
Contacts1 person available
OfficeN/A
Organization / AgencyIowa → West Des Moines
Office AddressN/A

Full Description

Show more
Electronically submitted bids will be received by the City of West Des Moines City Clerk’s Office at wdm.ionwave.net until 2:00 p.m. on February 5, 2025, for the following described public improvement:
2025 STREET RECONSTRUCTION PROGRAM WEST DES MOINES, IOWA PROJECT NO. 0510-001-2025
At the above time all bids received by the City will be electronically unsealed and made public at wdm.ionwave.net with the results being reported to the West Des Moines City Council at their meeting on February 17, 2025 at 5:35 p.m. at which time the Council may take action on the proposals submitted or at such time as may then be fixed.
The City Council of West Des Moines, Iowa, will hold a public hearing on the proposed Plans, Specifications, Form of Contract, and Estimate of Costs for the construction of said improvements at 5:35 p.m. on February 17, 2025, in the Council Chambers, 4200 Mills Civic Parkway, West Des Moines. At said hearing, any interested person may appear and file objections thereto or to the cost of the improvements.
The extent of work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements generally described as follows:
The project involves removing and reconstructing Giles Street, from Valley West Drive to just west of 32nd Street. The existing roadway pavement will be removed and replaced with PCC pavement, which will include the preparation of subbase material. Storm sewer piping will be added, storm sewer structures will be replaced and added, and watermain will be updated under a portion of the project corridor. Sanitary Sewer services along Giles Street will be replaced on an as needed basis. Affected driveway approaches will be replaced, all sidewalk will be replaced, and sidewalk curb ramps will be modified to be ADA compliant. The project also includes surface restoration, traffic control and other related work.
The kinds of materials, estimated quantities, and work to be done for the project on which bids will be received are as shown on the bid proposal for said project.
All work is to be done in strict compliance with the Plans and Specifications prepared by WHKS & Co. which have been heretofore approved by the City Council and which are now on file for public examination in the office of the City Clerk.
All bids shall be made on the form furnished by the City through wdm.ionwave.net and shall be filed on or before the time specified above. Each proposal shall be electronically accompanied by a scanned copy of the bid bond, or a scanned copy of a cashier’s or certified check drawn on an Iowa bank or a bank chartered under the laws of the United States in an amount equal to ten percent (10%) of the total amount of the bid. If a bid bond is submitted, it must be on the form provided with the contract documents. A physical copy of the bid security will be required to be submitted to the City Clerk’s Office by the apparent low bidder within 48 hours of the bid deadline.
The bid security submitted should be made payable to the City of West Des Moines, Iowa, and not contain any conditions either in the body or as an endorsement thereon. This bid security is provided to the City of West Des Moines as security that if the bidder is awarded the contract by the City, the bidder will enter into a contract on the form provided by the City at prices bid and shall furnish the required performance and payment bond to the City. If the bidder fails to execute the contract and to furnish an acceptable performance and payment bond or provide a Certificate of Insurance within ten (10) days after acceptance of the bid by the City, the bid security may be forfeited or cashed by the City as liquidated damages.
The successful bidder will be required to furnish a performance and payment bond in the amount of one hundred percent (100%) of the contract price guaranteeing faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract. Additionally, the contractor must provide the City with a guarantee of maintenance of said improvement in the form of surety for a period of four (4) years from the time of acceptance by the City.
By virtue of statutory authority preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor.
In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident.
Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected.
If it is determined that adherence to these Iowa statutory requirements may cause denial of federal funds which would otherwise be available for a public improvement or would otherwise be inconsistent with requirements of any federal law or regulation, the application of Iowa Code Chapters 73 and 73A shall be suspended to the extent necessary to prevent denial of the funds or to eliminate the inconsistency with federal requirements.
Work on said project shall commence within ten (10) days of the written notice to proceed and shall be completed by September 30, 2025. Liquidated damages in the amount of five hundred dollars ($500.00) per day will be assessed for each day that the work remains uncompleted after the end of the contract period.
Payment for the work will be made by the City in cash from such funds as may be legally available including cash on hand, proceeds from the sale and issuance of General Obligation Bonds and such other funds including the proceeds from the sale and issuance of such other bonds as may lawfully be issued as the City Council may at its sole discretion determine and provide.
Payment will be made to the contractor based on monthly estimates in amounts equal to ninety-five (95%) percent of the contract value of the work completed during the preceding calendar month and will be based upon an estimate prepared by the Contractor on the first day of the month, subject to the approval of the Engineer. Any such payment by the City shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Final payment by the City will be made in accordance with Iowa statues and the contract documents.
Bidding forms, copies of Plans and Specifications and contract documents may be obtained from the online bid posting at wdm.ionwave.net.
If any bidder needs assistance in registering within wdm.ionwave.net or anything associated with the submittal of an electronic bid, please contact the City Clerk’s Office at +1 (555) 000-0000 or contact@example.gov.
The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities.
    Ryan T. Jacobson City Clerk  

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS