Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on June 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 001 Construction Manager At Risk Services

Closed
PE-72600-NONST-2025-000000025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope repairs, new roofing, and interior reconfiguration. Key technical upgrades include the installation of new HVAC systems, rooftop air-handling units, air-cooled water chillers, exhaust extraction, compressed air systems, and a full NFPA-compliant fire suppression system. Additionally, the work covers the replacement of electrical distribution, lighting, low-voltage systems, building automation controls, and site improvements such as paving, drainage, and hazardous materials abatement. The contract is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The project is subject to the Davis-Bacon Act and Buy American requirements, and all work must comply with ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) using NAVFAC Form 7300/30.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of its North Wing dormitory in Troutdale, Oregon. The project aims to restore residential rooms, bathrooms, common areas, and mechanical rooms that suffered extensive interior damage due to water intrusion. The scope of work includes drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The selected contractor must provide all labor, materials, equipment, and supervision to return the affected spaces to safe residential use, ensuring proper protection of the occupied building and minimal service interruptions. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan with project phasing, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awardees must provide payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the correction of all deficiencies and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 236220
New
SLED
MTU Building Upgrades – Various Sites
Solicitation # 26.27.0938
The San Bernardino County Superintendent of Schools is soliciting bids for solicitation number 26.27.0938 to perform building upgrades at four school sites: Judson and Brown Elementary School in Redlands, San Salvador Pre-School in Colton, Moreno Elementary School in Montclair, and Crestline Elementary School in Barstow. The scope of work includes HVAC replacement, roofing improvements, and related enhancements to concrete, drainage, grading, parking lots, and accessibility. The project has a duration of 420 calendar days and will commence upon the receipt of a written Notice to Proceed. Bidders must possess a valid California Class B General Building Contractor license and be registered with the California Department of Industrial Relations. Mandatory requirements for a responsive bid include attending the entire job walk, signing in at each site, and acknowledging all issued addenda. Sealed bids must be submitted by December 17, 2026, at 2:00 p.m. Pacific Time to the Front Desk Receptionist in San Bernardino. Submissions must include a bid security of at least 10 percent of the total base bid, and the successful contractor must provide performance and payment bonds equal to 100 percent of the contract price. Required documentation includes various certifications such as a Drug-Free Workplace Certification, Non-Collusion Declaration, and DVBE Participation Statement.
San Bernardino County Superintendent of Schools

POSTED

about 2 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The project involves a multi-phase construction effort centered around the stabilization, demolition, and renovation of historic structures at 117 E. Solomon Street in Griffin, Georgia. The initial phase focuses on stabilizing the front façade of the existing historic building, requiring limited destructive surveys to guide the process. Following this, the demolition phase will remove the remaining structure behind the stabilized façade, including debris clearance from the first and second floors, and will involve shoring and stabilization of masonry walls between adjacent buildings at 113 and 119 E. Solomon Street. The scope may also include preconstruction services to assist in budgeting and planning for the rebuild of 117 and future renovations of the County Annex at 119, ensuring minimal disruption to ongoing county operations. The County retains the option to engage the selected General Contractor for preconstruction services, which will involve planning for new construction within the 117 space to facilitate the continued operation of the 119 Annex during renovation. Once the new construction in 117 is completed, county staff can relocate, allowing phased renovation of the 119 space to proceed without interrupting county functions. The overall project is valued between five and ten million dollars and is managed by the Spalding County Board of Commissioners, with a response deadline of July 15, 2025. The project aims to preserve historic elements while modernizing the facilities to support county needs efficiently.

Documents

6
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstcontract-document
High
PDF, High priority: read this firstrfq
High
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstpresolicitation
High
PDF, Low prioritybid-bond
Low

Read all 6 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Building 262 Renovations FLETC GlyncoOpen now, due in 16 days
  • Repair Auto Maintenance Bldg 575Open now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 72600 SPALDING PE-72600-NONST-2025-000000025 to PE-72600-NONST-2025-000000025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Spalding County Board of Commissioners
Contacts1 person available
OfficeN/A

Full Description

Show more
The overall project encompasses three phases of work with some phases potentially overlapping. The scope of work for each phase may include but not be limited to: ¿ Façade Stabilization involves the stabilization of the historic front building façade at 117 E. Solomon Street in Griffin, Georgia. The General Contractor shall provide limited destructive survey to assist the design team in preparing documentation showing demolition intent and performance criteria for the building stabilization. ¿ Demolition Services will occur after the façade stabilization process has begun and will provide demolition services for the remainder of the building behind the 117 E. Solomon façade. This will also include shoring and other measures to stabilize the masonry demising walls between 117 and the adjacent structures at 113 and 119 E. Solomon Street. The interior debris on the first and second floor will be removed through the rear entry. The work will also include removal of the debris at the first and second floors. The goal is to allow work installed during the stabilization process to be part of the permanent solution and avoid temporary work if possible. The scope may also include preconstruction services to assist the design team in budgeting for the rebuild of 117 and future renovation of 119, the existing County Annex offices. ¿ The County reserves the right to retain the selected General Contractor for preconstruction services with recommendations to the County and design team to encourage quality and efficiency. This scope of work would involve new building construction in the 117 E. Solomon space so the existing 119 Annex can remain functional during this time. Once the new construction in the 117 space is complete, County staff can relocate to the new construction so the renovation of the 119 Annex space may begin. The work in the 119 Annex will be phased to allow the Board of Commissioners to continue conducting business in the space.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS