Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

2026 Abbott Street St Sanitary Sewer and Pavement Improvements Project, CIP No. 9981

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Salinas is forecasting the 2026 Abbott Street Sanitary Sewer and Pavement Improvements Project, identified as CIP No. 9981. This infrastructure project focuses on the rehabilitation and reconstruction of approximately seven linear lane miles of pavement, covering 16,427 square yards. The scope includes the removal and replacement of failed asphalt sections, aggregate base repairs, the application of a two inch rubberized asphalt concrete overlay, and the implementation of 18 inch cement treated Full Depth Reclamation of existing base and native materials. Additionally, the project involves updating street striping and replacing signs and signposts as required. Concurrent with the roadwork, the project entails significant utility upgrades, including the upsizing of 2,900 linear feet of sanitary sewer main lines and the abandonment of select existing mainlines. The contract also covers the rehabilitation of sanitary sewer manholes to ensure system efficiency. Managed by the City of Salinas in California, the project is coordinated through Assistant Engineer Victor Sanchez.

General Info

City of Salinas 2026 Abbott Street project: pavement reconstruction and sanitary sewer upgrades.

Agency

California → City of Salinas

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Salinas, CA

Set-Aside

NONE

Documents

(1)

NOE ER 2026-005

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Salinas
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Salinas
Office AddressN/A
Contacts
Victor SanchezAssistant Engineer

Full Description

Show more
The project includes approximately seven (7) linear lane miles (16,427 square yards) of pavement rehabilitation/reconstruction and 2,900 linear feet of sanitary sewer main line upsizing on Abbott Street. Abandonment of select sanitary sewer mainlines; upsizing of existing sanitary sewer mainlines; sanitary sewer manhole rehabilitation; removal and replacement of select failed asphalt concrete pavement sections to a depth of 6-12"; aggregate base repair; 2" thick rubberized asphalt concrete overlay; removal and replacement of pavement section to include 6" of asphalt concrete over 4" class 2 aggregate base and 18" cement treated Full Depth Reclamation (FDR) of existing base and native materials,· removal and replacement of existing pavement striping, and replace street signs and signposts as needed.

Similar Contracts

Same NAICS industry code