CP3445
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Project No. 2023-735, also identified as Capital Project No. 3445, involves the repair of the Shell Beach Drive Bridge over Pithon Coulee for the City of Lake Charles, Louisiana. The project was initiated to address structural damage to the bridge deck, handrail, and substructure, as well as the destruction of a streetlamp, all resulting from a vehicle crash in March 2021. The scope of work includes reconstructing the northeast portion of the concrete bridge and sidewalk, sealing cracks and grouting spalling along the substructure, and repainting all four sections of the decorative concrete handrailing. Additionally, the contractor will install new streetlamps and wiring at each of the four bridge corners and reconstruct a portion of the northeast approach pavement to address voids behind the abutment and improve pedestrian traffic flow. This solicitation was posted on September 24, 2026, with a response deadline of October 20, 2026.
General Info
Place of Performance
LA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
In March of 2021, a vehicle crashed into the Northeast corner of the Pithon Coulee bridge on Shell Beach Drive. The impact of the crash forced the existing handrail to twist causing damage to the bridge’s handrail, deck, and substructure. The crash also damaged beyond repair and existing streetlamp that was present on the Northeast corner of the bridge. The general scope of work for this project includes the following:
• The reconstruction of the Northeast portion of the concrete bridge and sidewalk. • Grout spalling and sealing cracks along the bridge substructure. • Clean and repaint all 4 sections of existing decorative concrete handrailing. • Replacing with new streetlamps at each of the four corners of the bridge, including the associated wiring & conduit. • The reconstruction of a portion of the existing pavement at the Northeast approach in order to:
1. Access and address any voids present behind the abutment. 2. Better facilitate pedestrian traffic transitioning away from the bridge.
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
