2026 LMIG Roadway Improvements

Active
PE-66213-NONST-2027-000000019State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Hoschton, Georgia is soliciting bids for the 2026 LMIG Roadway Improvements project on New Street, East Broad Street, Oak Street, Joshua Way, Fawn Court, Josh Pirkle Road, and Hawthorne Way Alley, funded by the Georgia Department of Transportation’s Local Maintenance and Improvement Grant. The scope includes approximately 480 tons of 9.5 mm Asphalt Superpave, 286 tons of asphalt patching, 4,300 square yards of 12-inch Soil-Cement Stabilization, 430 square yards of 6-inch Graded Aggregate Base Course, 98 cubic yards of Class B Concrete Base and pavement widening, 120 cubic yards of foundational backfill, 340 linear feet of header curb, and storm drainage systems comprising 30 linear feet of 24-inch RCP, 524 linear feet of 18-inch RCP, 35 linear feet of 15-inch RCP, and 30 drainage structures. Additional work includes 3,200 linear feet of 5-inch white thermoplastic striping, 10,200 linear feet of 5-inch yellow thermoplastic striping, 60 linear feet of 24-inch thermoplastic striping, signage, adjusting structures to grade, shoulder reconstruction, and comprehensive traffic and erosion control measures. The project must be completed within 90 consecutive calendar days from the issuance of a written Notice to Proceed. Bids must be submitted in sealed envelopes labeled with the project title and delivered to City Hall at 61 City Square, Hoschton, Georgia no later than 2:00 p.m. on Thursday, August 6, 2026. Each bid must include a bid bond or certified cashier’s check equal to five percent of the total bid amount, payable to the City of Hoschton. The successful bidder must provide Performance and Payment Bonds equivalent to 100 percent of the bid amount, with sureties required to hold an AM Best rating of A-6 or higher, be listed in the Federal Registry of Acceptable Sureties, licensed by the Georgia Insurance Department and Secretary of State, and appear on the U.S. Treasury’s Circular 570 list. For Performance Bonds under $300,000, an irrevocable letter of credit per O.C.G.A. Section

General Info

Hoschton to improve roads with asphalt, concrete, drainage, striping, and bonding requirements under GDOT grant, 90-day timeline.

Agency

Georgia → City of HoschtonView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

(1)

SEC00030 - 2026 LMIG Roadway Improvements Bid Advertisement for City of Hoschton, GA

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → City of Hoschton
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Hoschton
View Agency Profile
Office AddressN/A
Contacts
Jennifer Harrison

Full Description

Show more
City of Hoschton, Georgia 2026 LMIG Roadway Improvements on New Street, East Broad Street, Oak Street, Joshua Way, Fawn Court, Josh Pirkle Road, and Hawthorne Way Alley. Bids will be received at City of Hoschton, City Hall, 61 City Square, Hoschton Georgia, 30548 until 2:00 p.m. on Thursday, August 6, 2026. The Project consists of, but is not limited to the following major elements: Approximately 480 Tons of 9.5 mm Asphalt Superpave, 286 Tons of Asphalt Patching, 4,300 SY of 12-inch Soil-Cement Stabilization (CSRB), 430 SY of 6-inch Graded Aggregate Base Course, 98 CY of Class B Concrete Base and Pavement Widening, 120 CY of Foundational Backfill Material, 340 LF of Header Curb, 30 LF of 24-inch RCP Storm Drain, 524 LF of 18-inch RCP Storm Drain, 35 LF of 15-inch RCP Storm Drain, 30 Drainage Structures, 3,200 LF of 5-inch White Thermoplastic Pavement Striping, 10,200 LF of 5-inch Yellow Thermoplastic Pavement Striping, 60 LF of 24-inch Thermoplastic Pavement Striping, Signage, Adjusting Structures to Grade, Shoulder Reconstruction, Traffic and Erosion Control Measures. Time of completion for all work associated with this project shall be ninety (90) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. A Bid Bond will be required with proposal submission. Copies of Contract Documents, Specifications, and Construction Drawings may be obtained by contacting Jessica James of Engineering Management, Inc. at 303 Swanson Drive Lawrenceville, GA 30043, or Email jjames@eminc.biz, or Phone 770-962-1387 or Fax 770-962-8010.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026This contract encompasses a wide range of pavement and infrastructure work to be performed across multiple locations within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. The scope includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, removal and disposal of grinding spoils, stripping of existing pavement markings, surface preparation for new striping, various paint markings, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, lifting and leveling of concrete sidewalks, and upgrades to road water drainage systems, some of which may require permits. All work must comply with applicable standards and be executed at various port-wide sites as needed. The contract is titled Asphalt Paving & Striping Portwide Unit Price 2026 and is forecasted for issuance under NAICS code 237310. It is managed by the Port of Seattle through its Port Construction Services division, with Heather Bowden as the primary point of contact and Lesley Miles serving as Project Manager. The solicitation is posted on the Port’s online portal and is intended to establish unit pricing for ongoing and future work at the port’s facilities, enabling efficient task order execution without a formal bidding process at the time of individual job requests. Work is expected to begin in 2026 and will be performed on an as-needed basis across the port’s extensive property network.
Port Construction Services

POSTED

about 11 hours ago

DEADLINE

N/A
View Details