Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on March 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 Local Street Renewals

Closed
51-2026International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signals and lighting, along with environmental support through storm water pollution prevention. Required materials include precast concrete, ready mix supply, manhole materials, and various valves and fittings. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certified entities. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. A critical requirement is that subcontractors and material contractors must provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the bond premiums. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
Davison Rd MP 0.01 Bridge Rehabilitation
Solicitation # CRP 2198
Lewis County Public Works is soliciting sealed bids for the Davison Rd MP 0.01 Bridge Rehabilitation project, identified as County Road Project 2198 and Federal Aid Project BHOS-2021(075). The scope of work involves providing all labor, materials, and equipment to improve the bridge, specifically focusing on replacing the deck and cleaning and painting the metal surfaces of steel truss members, floorbeams, stringers, and other steel components. The engineer's estimate for the project is between 1.9 and 2 million dollars. All work must comply with WSDOT 2026 standard specifications, and specific technical requirements include strict adherence to an in-water work window from April 1st to September 30th for cleaning and painting activities. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, November 19, 2026. Proposals must include a bid deposit equal to five percent of the bid amount in the form of cash, certified check, cashier's check, or surety bond. Required documentation includes a signed proposal page acknowledging two addendums, a non-collusion declaration, wage law compliance certification, a bidder questionnaire, and a local agency certification for federal-aid contracts. The successful bidder will be required to provide a contract bond and submit certified payrolls on a weekly basis.
Public Works- Roads

POSTED

about 12 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
Beresford Ave Extension Phase 2B: S Kepler Rd/ Dr MLK Beltway to SR 44
Solicitation # 27-B-17JD, C2103
The County of Volusia, Engineering and Construction department, is soliciting bids for the Beresford Avenue Extension Phase 2B project, identified as solicitation number 27-B-17JD, C2103. This infrastructure project involves the new construction of Beresford Avenue, extending the roadway from approximately 1,100 feet east of Kepler Road to the intersection of SR 44 and Summit Avenue, as well as the realignment of 1,600 feet of Summit Avenue. The scope of work includes the creation of two 11-foot travel lanes in each direction with 6-foot paved shoulders, roadside ditches, drainage structures, and a 12-foot concrete trail on the south side. All pavement markings must be thermoplastic and adhere to FDOT standard plans. The estimated construction cost for this project is 4,911,975.00 dollars. The contract will be awarded to the single lowest responsive and responsible respondent based on criteria including business location, financial resources, technical experience, and past performance. Bids are due by December 1, 2026, and must be accompanied by a bid bond of at least five percent of the bid amount. The project is subject to liquidated damages of 2,529.00 dollars per day for failure to meet delivery dates. Payment terms are set at thirty days from the receipt of undisputed invoices, with funding limited to the budget approved by the Volusia County Council. The contractor is responsible for all quality control sampling and must comply with ADA and civil rights regulations.
Engineering & Construction

POSTED

about 14 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving, culvert replacement, drainage improvements, and signage. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in a stone trench, and 2,800 feet of modified concrete curb and gutter. The project is entirely funded by the City of Zeeland with an engineer's estimate of 1,111,000 dollars, and all work must be completed by April 30, 2027. Encrypted bids must be submitted via the Bid Express site by 11 a.m. local time on Thursday, November 12, 2026. Only bidders prequalified by the City of Zeeland will have their bids opened. Proposals must be based on unit prices and must be accompanied by a proposal guarantee of five percent of the bid amount. Award evaluation is primarily based on the total bid price and the competency of the bidder. Successful contractors are required to provide performance and lien bonds each totaling 100 percent of the contract value, as well as certifications for Workmen's Compensation Insurance and manufacturer certifications for sewer pipes. Project direction is managed by Scott A. Smith, P.E. of ZEEZON LLC, with inspection services provided by Moore & Bruggink, Inc.
Moore & Bruggink, Inc

POSTED

about 14 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The contract for the 2026 Local Street Renewals involves comprehensive infrastructure work in designated areas including Greenlea Cove, Johnson Avenue E, and various other locations within District 2. The scope is divided into two parts: City Funded Work and Manitoba Hydro Funded Work. The City Funded portion encompasses asphalt reconstruction and pavement rehabilitation across multiple streets, involving detailed activities such as pavement removal, excavation, installation of sub-base materials, geotextile fabrics, curbs, sidewalks, catch basins, and boulevard restoration. This includes extensive works on Johnson Avenue E, Kent Road, Litz Place, Greenlea Cove, Manhattan Avenue, and Paufeld Drive. The work also covers water main and service insulation as part of water and wastewater components. The Manitoba Hydro Funded Work primarily focuses on street lighting renewal along Kent Road and Litz Place. However, this part of the project is contingent on funding approval from the Province of Manitoba, which is anticipated by late May. If funding is not approved, the City retains the right to reduce or eliminate these components, resulting in a proportional adjustment to the contract price and schedule. The contract outlines specific construction details and performance requirements including the types and thicknesses of asphalt overlays, concrete work, and adjustments to existing infrastructure. Bidding documents are accessible through Merx, with a submission deadline set for March 24, 2026. The City of Winnipeg is the contracting authority, with contact details provided for inquiries.

General Info

2026 Local Street Renewals: asphalt reconstruction, pavement rehab, waterworks, lighting contingent on Manitoba Hydro funding.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City of Winnipeg
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Drew MurrayContracting Authority

Full Description

Show more
Full Title: 2026 Local Street Renewals - Greenlea Cove, Johnson Avenue E and Various other Locations D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of two parts: (a) Part 1 – City Funded Work (b) Part 2 – Manitoba Hydro Funded Work. Part 1 – City Funded Work D2.2 Part 1 – City Funded Work shall consist of: (a) Asphalt Reconstruction (i) Johnson Avenue E – Gateway Rd to Grey St (ii) Kent Road – Chalmers Ave E to Keenleyside St (iii) Litz Place – Appleton St to Henderson Hwy (b) Pavement Rehabilitation (i) Greenlea Cove – Gilmore Ave to Gilmore Ave (ii) Kent Road – Nairn Ave to Talbot Ave (iii) Kent Road – Talbot Ave to Beach Ave (iv) Manhattan Avenue – Keenleyside St to Stapleton St (v) Paufeld Drive – Rothesay St to Karen St Part 2 – Manitoba Hydro Funded Work D2.3 Part 2 – Manitoba Hydro Funded Work shall consist of: (a) Street Lighting Renewal (i) Kent Road – Chalmers Ave to Keenleyside St (ii) Litz Place – Appleton St to Henderson Hwy D2.4 The City currently has no approved funding in the Capital Budget for Part 2 of the Work, but is anticipating receiving notification about funding from the Province of Manitoba by late May. Part 2 of the Work is contingent upon the Province approving sufficient funding. D2.4.1 Further to C7.1, if notice of sufficient funding is not received, the City shall have the right to eliminate all or any portion of Part 2, and the Contract Price will be reduced accordingly. D2.4.2 Further to C7.5, C7.5.1, and C7.6, a reduction in the Contract Price pursuant to D2.4.1 shall not be considered in calculating the aggregate reduction in the Contract Price for purposes of C7.5. D2.4.3 If all or any portion of Part 2 is eliminated pursuant to D2.4.1, the time periods stipulated in D19 for Substantial Performance of the Work and in D20 for Total Performance of the Work will be reduced proportionally by the Contract Administrator acting reasonably. D2.5 The major components of the Work are as follows: (a) Asphalt Reconstruction (i) Pavement removal; (ii) Excavation; (iii) Placement of suitable site sub-base material as required; (iv) Placement of geotextile fabric; (v) Placement of geogrid; (vi) Insulation of water services; (vii) Sub-grade compaction as required; (viii) Placement of sub-base and base course material; (ix) Installation of catch basins and connecting pipes; (x) Installation of subdrains; (xi) Construction of 100mm concrete sidewalk; (xii) Installation of detectable warning tiles; (xiii) Construction of 150mm barrier curb for asphalt pavements; (xiv) Construction of modified barrier curb for asphalt pavements; (xv) Construction of 40mm lip curb for asphalt pavements; (xvi) Construction of ramp curb for asphalt pavements; (xvii) Construction of 150mm barrier reverse curb and gutter; (xviii) Construction of 40mm lip reverse curb and gutter; (xix) Placement and compaction of 50mm sub-base material as backfill behind barrier curb for asphalt pavement within excavated area; (xx) Installation of 150mm reinforced concrete approach; (xxi) Adjustment of precast sidewalk blocks; (xxii) Placement of asphalt pavement (Type MS2, 70mm thickness); (xxiii) Placement of asphalt pavement (Type MS1, 50mm thickness); (xxiv) Adjustment of existing catch basins, manholes and appurtenances; and (xxv) Boulevard restoration and sod. (b) Pavement Rehabilitation (i) Planing/removal of existing asphalt as required; (ii) Renewal of existing sidewalk as required; (iii) Renewal of monolithic concrete curb and sidewalk as required; (iv) Construction of 100mm concrete sidewalk; (v) Installation of detectable warning tiles; (vi) Installation of catch basins, catch pits and connecting pipes; (vii) Abandon existing drainage inlets; (viii) Full depth concrete joint and slab repairs as required; (ix) Removal/renewal of existing curb; (x) Construction of modified lip curb; (xi) Installation/renewal of modified barrier curb and ramp curb; (xii) Adjustment of precast sidewalk blocks; (xiii) Adjustment of existing catch basin, catch pit and manhole frames and covers; (xiv) Adjustment of water main valves, curb stops and other appurtenances; (xv) Placement of pavement repair fabric; (xvi) Placement of asphalt overlay (Type MS1, 80-100mm average thickness); and (xvii) Boulevard restoration and sod. (c) Water and Waste Works (i) Water main and water service insulation. (d) Street Lighting Renewal (i) Remove and replace existing street lighting. Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS