This Solicitation opportunity from Minnesota was posted on March 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Rochester Public Utilities is soliciting bids for the 2026 Manhole Rebuild project in Minnesota, which involves the demolition and reconstruction of two brick manholes, the removal and replacement of two concrete manhole roofs, and the roof removal and infill of one brick manhole. The project includes extensive site restoration, such as the removal and installation of bituminous and concrete pavements, walks, and curbs, adhering to MnDOT and city engineering standards. Work is tentatively scheduled to begin in early June, with a target completion date of May 12, 2026.
The contract will be awarded to the lowest responsive and responsible bidder based on price, delivery schedule, and bidder qualifications, including safety records and bonding capacity. Bidders must submit their proposals electronically by April 1, 2026, including a 5 percent bid security, a Responsible Contractor Certification per Minnesota Statutes, and an Authorization of Signature form. Technical requirements emphasize strict safety protocols for working near energized electric lines and adherence to asbestos abatement procedures, as several manhole locations have undergone environmental analysis. The contractor is required to provide competent on-site supervision and obtain written approval for all subcontractors and change orders.
XLSX, High priority: read this firstbid-form-supplement
HighAI Summary for 2026 E. Center Street MH Bid Form Supplement: This document is the 2026 E. Center Street MH Bid Form Supplement. It contains a detailed bid form listing various construction-related items such as removal of bituminous pavement, concrete pavement, concrete walk, and concrete curb, along with sawing of pavements. The form includes columns for item number, description, reference drawing, evaluation quantity, unit of measure, unit price, and extended price. The quantities and units are specified, but unit prices and extended prices are mostly not filled in, indicating it is a template or supplement for bid pricing. The document is intended to support the bidding process for construction work on E. Center Street.
XLSX
XLSX, High priority: read this firstbid-form-supplement
HighAI Summary for 2026 RPU MH Base Bid Form Supplement: This document is the 2026 RPU MH Base Bid Form Supplement, providing a detailed bid form for various construction items such as removal and installation of pavements, walks, and curbs. It includes item numbers, descriptions, reference drawings, evaluation quantities, units of measure, unit prices, and extended prices. The form is intended to supplement the base bid with specific quantities and pricing for evaluation purposes, supporting the bidding process for the project.
PDF
PDF, High priority: read this first4 pages · authorization-of-signature
HighAI Summary for Authorization of Signature Documents: This document titled 'Authorization of Signature Documents' dated April 13, 2016, provides instructions and forms for authorizing signatures on contracts. It includes acknowledgments for corporate officers, limited liability company managers, and authorizations for corporate agents to act on behalf of a corporation in contracts with the City of Rochester. The document contains notarized signature blocks and specifies conditions under which different acknowledgments must be returned with bids.
PDF
PDF, High priority: read this firstgeneral-terms-and-conditions
HighAI Summary for General Terms and Conditions for Contract Work: This document outlines the General Terms and Conditions governing the work performed under a contract with the City of Rochester Public Utility Board. It includes provisions on work performance, insurance requirements, compensation and payment terms, withholding payments, independent contractor status, compliance with laws and permits, professional responsibility, and the City's right to perform work if the contractor neglects duties. The document specifies insurance coverage minimums, payment policies, and contractor responsibilities, ensuring adherence to legal and contractual obligations. It serves as a binding part of the contract to ensure proper execution and risk management.
DOCX
DOCX, High priority: read this firstproposal-form
HighAI Summary for IFB 2026-03 Manhole Rebuild Proposal Form: This document is the Proposal Form for IFB #2026-03 Manhole Rebuild project by City of Rochester, Rochester Public Utilities. The proposal due date is April 1st, 2026 at 2:00 pm local time. It includes pricing line items for various manhole removal, demolition, reconstruction, and roof replacement tasks. The form requires confirmation of pricing validity, safety compliance, bonding capability, and submission of required documents such as Authorization of Signature form, Bid Security, and Responsible Contractor Certification. The proposer certifies understanding of the specifications and affirms no collusion in bidding. Contact information for the project and authorized signatures are also included.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for MH 237 Manhole Inspection and Rebuild Document: This document dated 2/28/22 and updated on 2/20/2026, is a manhole inspection and rebuild specification for MH 237 under Rochester Public Utilities. It includes inspection notes, location details, and contractor responsibilities for removals and gravel backfill around the manhole. The document references work order #7016026 and specifies that sidewalk panel and curb restoration will be handled by a different contractor. It contains technical details and revisions related to the manhole rebuild project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for PW Detail Plates 2026 - Sidewalk and Curb Construction Details: This document, revised on 1/26/24, provides detailed construction specifications and notes for urban type curb, gutter, and sidewalk work for the City of Rochester, Minnesota Department of Public Works. It includes concrete mix requirements, expansion and contraction joint spacing, aggregate base specifications, and payment inclusions. The document covers sidewalk repair methods such as grinding, slab-jacking, and panel replacement with tie bar reinforcement. It also specifies decorative edging, joint sealing, and construction tolerances. The document serves as a technical guide for restoration, partial reconstruction, and new construction of sidewalks and curbs, ensuring compliance with MN/DOT standards and city engineering requirements.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Request for Bids #2026-03 Manhole Rebuild: This document is the Invitation for Bids (IFB) #2026-03 for the demolition and reconstruction of two existing brick manholes for Rochester Public Utilities, City of Rochester, MN. It includes project description, bid submission instructions, mandatory pre-bid meeting details, bid due date, bid security requirements, evaluation criteria, bidder qualifications, financial and bonding requirements, and conditions for addendums and confidentiality. The bids must be submitted electronically by April 1, 2026, with bid security of 5% of the total bid price. The document outlines the evaluation process, including price evaluation and bidder responsibility, and specifies that the contract will be awarded to the lowest responsive and responsible bidder. The IFB also mandates a 90-day bid validity and the use of U.S. dollars for pricing.
PDF
PDF, High priority: read this firstspecial-terms-and-conditions
HighAI Summary for Special Terms and Conditions for Manhole Rebuild 2026: This document titled 'Special Terms and Conditions for Manhole Rebuild 2026' outlines the contractual requirements for a manhole rebuild project. It includes general requirements for contractor personnel, equipment, and supervision; coordination and scheduling with RPU personnel; compensation terms including invoicing and retainage; work hours and days; waste disposal responsibilities; overtime policies; and safety protocols. Safety measures emphasize coordination with RPU regarding electric lines, prohibition of work in energized manholes without RPU personnel, and immediate notification of irregular system conditions. The document ensures contractor compliance with city ordinances and project-specific operational standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Specifications for 2026 Manhole Rebuild Project: This document provides detailed specifications for the 2026 Manhole Rebuild project for Rochester Public Utilities (RPU), City of Rochester MN. It outlines the scope of work including full reconstruction, roof reconstruction, and removal and infill of various brick and concrete manholes at specified locations. The document includes asbestos testing results, structural engineering drawing references, and detailed work requirements such as demolition, excavation, concrete construction, backfill, and restoration. It also specifies exclusions from the bid price and coordination requirements with RPU and other contractors. The document is essential for contractors to understand the technical and procedural requirements for bidding and executing the manhole rebuild project.
PDF
PDF, Low prioritytest-report
LowAI Summary for Asbestos Analysis Report for Manhole #162: This document is an asbestos analysis report for bulk materials from Manhole #162, conducted by EMSL Analytical, Inc. The analysis used EPA 600/R-93/116 Method with Polarized Light Microscopy. The report includes sample descriptions, appearance, fibrous content, and asbestos type results, with no asbestos detected in the samples. The report is dated June 24, 2018, and includes disclaimers about liability, sample handling, and usage of results. It is intended for the Institute for Environmental Assessment, attention Jennifer Theis.
PDF
PDF, Low prioritylaboratory-report
LowAI Summary for Asbestos Analysis Report for Manhole #165: This document is an asbestos analysis report for bulk materials from Manhole #165, project number 201810449, conducted by EMSL Analytical, Inc. The analysis was performed using EPA 600/R-93/116 Method with Polarized Light Microscopy. The report includes sample descriptions, appearance, fibrous content, and asbestos type percentages. Key findings indicate no asbestos detected in soil and west duct samples, while the east pipe wrap sample contains 50% Chrysotile asbestos. The report was completed on June 24, 2018, and includes disclaimers about liability, sample handling, and usage of results.
PDF
PDF, Low priorityreport
LowAI Summary for Asbestos Analysis Report for Manhole #166: This document is an asbestos analysis report for bulk materials from Manhole #166, conducted by EMSL Analytical, Inc. The analysis used EPA 600/R-93/116 Method with Polarized Light Microscopy. The report includes sample descriptions, appearance, fibrous content, and asbestos type percentages. Key findings show no asbestos detected in soil samples and 40% Chrysotile asbestos in the East Duct sample. The report was completed on 06/24/2018 and includes disclaimers about liability, sample condition, and usage limitations.
PDF
PDF, Low priorityother
LowAI Summary for Asbestos Analysis Report for Manhole #167: This document is an asbestos analysis report conducted by EMSL Analytical, Inc. for the project identified as Manhole #167. The analysis was performed on bulk soil samples collected on 06/21/2018 and analyzed on 06/26/2018 using EPA 600/R-93/116 Method with Polarized Light Microscopy. The report indicates no asbestos detected in the samples. It includes details about sample receipt, analysis dates, and disclaimers regarding the limitations and liability of the analysis. The report is intended for the client, Inst. For Environmental Assessment, and is not for certification or endorsement purposes.
PDF
PDF, Low priorityother
LowAI Summary for Asbestos Analysis Report for Manhole #57: This document is an asbestos analysis report conducted by EMSL Analytical, Inc. for the project 201810449 Manhole #57. The analysis was performed using EPA 600/R-93/116 Method with Polarized Light Microscopy on bulk materials including soil and duct samples. The report details sample descriptions, appearances, fibrous content, and asbestos presence, with results indicating no asbestos detected in the samples. The report includes dates of sample receipt (06/12/2018) and analysis completion (06/18/2018), and notes on liability, sample condition, and analysis limitations. The report is intended for the client and not for certification or endorsement purposes.
PDF
PDF, Low prioritylaboratory-report
LowAI Summary for EMSL Asbestos Analysis Report for Manhole #31: This document is a laboratory report from EMSL Analytical, Inc. detailing asbestos analysis of bulk materials collected from Manhole #31. The analysis was conducted using EPA 600/R-93/116 Method with Polarized Light Microscopy. The report includes sample descriptions, appearance, fibrous content, and asbestos type percentages. Key dates include sample collection on 05/22/2018, receipt on 05/29/2018, and analysis completion on 05/31/2018. The report emphasizes that EMSL's liability is limited to the cost of analysis and that the results are specific to the samples tested. It also notes that the report should not be used for product certification or endorsement by federal agencies.
LowAI Summary for Exhibit B Responsible Contractor Bidder's Certification for RPU Project #2026-03 Manhole Rebuild: This document is the Responsible Contractor Certificate for RPU Project Number 2026-03 Manhole Rebuild. It defines a responsible contractor according to Minnesota Statutes §16C.285, subdivision 3, and outlines the requirements for prime contractors, subcontractors, and motor carriers to meet minimum criteria to be eligible for the project. The certificate includes a list section for first-tier subcontractors and motor carriers and requires the prime contractor to verify compliance under oath. The document also includes a certification statement for an owner or officer to sign, affirming compliance with the legal criteria.
PDF
PDF, Low priorityinspection-report
LowAI Summary for MH 74 Manhole Inspection and Asbestos Analysis Report: This document contains manhole inspection forms and asbestos analysis reports related to Manhole #74. It includes detailed wall views with cable information, occupancy status, and dimensions. The asbestos analysis was conducted by EMSL Analytical, Inc. using EPA 600/R-93/116 Method with Polarized Light Microscopy, reporting no asbestos detected in soil and duct bank samples. The document includes revision history, approval dates, and laboratory analysis details, serving as a technical record for manhole condition and environmental safety assessment.
Work involves the proposed demolition and reconstruction work for two (2) existing brick manhole locations, the removal and replacement of two (2) concrete manhole roofs, and the roof removal and infill of one (1) brick manhole for Rochester Public Utilities (RPU). Please refer to the project specific document for details. The awarded work is expected to be completed not later than May 12, 2026.