This Solicitation opportunity from Pennsylvania was posted on June 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Upper Dublin Township in Montgomery County, Pennsylvania, is soliciting sealed online bids until 10:00 A.M. on July 8, 2026, for Contract 21-05040, titled Willow Manor North Hills Avenue Diversion Pipe. The project entails constructing a storm sewer diversion system including installation of a diversion manhole, multiple inlets and manholes, and approximately 1,860 linear feet of 36- and 42-inch storm pipes along North Hills and Kimball Avenues. The scope also includes minor utility relocations, sanitary lateral reconnections, roadway restoration, erosion and sediment control, and traffic management. Bidders must comply with PennDOT Publication 408 and township standards, and the contract includes two alternates for asphalt milling and overlay work. All bidding documents are accessible online via PennBid at no cost, with a nominal fee applied only to successful bidders.
Bidders are required to submit their proposals using prescribed Township forms, accompanied by a bid bond or certified check equal to at least 10% of the bid amount. The successful bidder must furnish performance, payment, and maintenance bonds, along with proof of insurance including workers' compensation and liability coverage. The contract enforces compliance with Pennsylvania Prevailing Wage Act (Act 442), Public Works Employment Verification (Act 127), and ADA regulations. The Township reserves the right to reject bids, award in whole or by item, and require equitable adjustments if delivery conditions change. Award will be to the lowest responsive and responsible bidder after evaluation of financial responsibility, experience, compliance history, and prior work performance. Payment is based on unit prices submitted, with standard payment processing procedures and final payment contingent upon submission of affidavits certifying wage and subcontractor payments. Inspection and acceptance follow PennDOT standards with stringent documentation, sampling, and testing requirements. The contract duration extends from a notice to proceed for a completion date established by the Township, with liquidated damages assessed at $50 per day for delays. Safety protocols include mandatory high-visibility apparel and contractor responsibility for traffic control. Indemnification provisions protect the Township against claims related to damages or intellectual property infringement, and disputes are subject to arbitration under the American Arbitration Association’s Construction Industry Rules. The contract mandates nondiscrimination and sexual harassment provisions be flowed down to all subcontractors, with potential contract termination for violations. All contractual bonds must be issued by sureties authorized in Pennsylvania, and no bid may be withdrawn within 60 days after bid opening.
General Info
Upper Dublin Township seeks bids for storm sewer project with strict compliance, bonding, and safety requirements.
HighAI Summary for 2026 Mill and Overlay Bid Notice - Upper Dublin Township: This document is a bid notice for the 2026 Mill and Overlay project issued by Upper Dublin Township, Montgomery County, Pennsylvania. It invites sealed bids to be submitted online via PennBid by January 23, 2026, at 10:00 AM, with public opening and reading of bids at that time. Bidders must provide a certified check or bid bond equal to at least 10% of the bid price. Prevailing wage determinations apply. Bids cannot be withdrawn for 60 days post-opening. The Township reserves rights to reject bids or waive informalities. Contact for questions is Joseph J. Fielder, Public Works Director.
PDF
PDF, High priority: read this firstbid-schedule
HighAI Summary for 2026 Mill & Overlay Detailed Bids: This document titled '2026 Mill & Overlay Detailed Bids' provides detailed measurements for a contractor bid related to mill and overlay road work scheduled for 2026. It includes a table listing streets, from and to points, lengths, widths, and square yard calculations for various road segments. The data supports bid preparation by quantifying the work scope in square yards for each segment, essential for cost estimation and contract award decisions.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum 1 - Willow Manor: This document is Addendum 1 for the Willow Manor procurement. It serves as an amendment to the original solicitation or contract, providing updates or changes. The content appears minimal or placeholder, but the document's nature as an addendum indicates it contains important modifications or clarifications relevant to the procurement process.
PDF
PDF, High priority: read this firstagreement-of-surety-company
HighAI Summary for Agreement of Surety Company for Willow Manor North Hills Diversion Pipe Project: This document is the Agreement of Surety Company related to Contract No. 21-0504003 for the Willow Manor North Hills Diversion Pipe Project. It binds the Surety Company to provide Performance and Payment Bonds each equal to 100% of the contract amount in favor of Upper Dublin Township, Pennsylvania. The agreement is valid if the contract is awarded within 60 days of bid opening. It includes provisions for the Surety's obligations and consequences if the Surety fails to execute the required bonds after award notification. The document requires signatures and corporate seal, with authority certification if signed by persons other than the President or Vice President of the Surety Company.
PDF
PDF, High priority: read this firstbidder-qualification-statement
HighAI Summary for Bidder Qualification Statement - Public Works Employment Verification Form: This document is an appendix (Appendix B) of a Bidder Qualification Statement, specifically the Public Works Employment Verification Form for the Commonwealth of Pennsylvania. It affirms compliance with the Public Works Employment Verification Act through the use of the federal E-Verify Program. The form requires contractors/subcontractors to verify employment eligibility of new hires within five business days and maintain documentation for audits. The authorized representative attests to the truthfulness of the information, with legal sanctions for false submissions.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Bid Notice and Instructions for 2026 Mill & Overlay Project: This document is a bid notice and instructions to bidders for the 2026 Mill & Overlay project. It includes general information for bidders, preparation and submission requirements, estimated quantities, approved equal provisions, alternates, site investigation details, and bid submission instructions. The document specifies that sealed bids must be submitted online via PennBid and outlines the components required in the bid submission, including line item prices, answers to questions, and electronic attachments. Prevailing minimum wage determinations apply to this project. The document serves as a primary solicitation for contractors interested in performing the specified work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for By-Pass Pumping Specifications Appendix B: This document, titled Appendix B, Section 01 54 29, details the specifications for by-pass pumping required for a public works project. It outlines the contractor's responsibilities to provide equipment, labor, and power to reroute sewage flow temporarily during manhole replacement or modification. Key content includes pump and generator requirements, submittal instructions, operational procedures, and backup equipment mandates. The document specifies flow rates, noise limits, fuel capacity, and continuous monitoring to ensure system reliability and emergency response protocols.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Concrete Formwork Specifications Section 03 11 00: This document is Section 03 11 00 covering Concrete Formwork for cast-in-place concrete. It includes general requirements, related sections, references to ACI standards, design requirements, quality assurance, product specifications for wood form materials and formwork accessories, and detailed execution instructions. Key content covers formwork erection, application of form release agents, inserts and embedded parts, form cleaning, tolerances, field quality control, and form removal procedures. The document ensures compliance with structural and quality standards for concrete formwork construction.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Contract Agreement for Willow Manor North Hills Diversion Pipe Project: This document is a contract agreement between Upper Dublin Township (Owner) and a Contractor for Contract No. 21-0504003 concerning the Willow Manor North Hills Diversion Pipe Project. It outlines the scope of work including construction of a stormwater diversion system, installation of storm sewers, manholes, pipe replacements, utility relocations, and roadway restoration. The project is designed by Gilmore & Associates, Inc. The contract specifies completion times, liquidated damages for delays, contract price based on unit prices, payment procedures including progress and final payments, and interest on late payments. The document is a formal agreement detailing responsibilities, timelines, and financial terms for the project.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Contract Closeout Procedures Section 01 70 00: This document is Section 01 70 00 titled 'Contract Closeout' outlining procedures for contract closeout including final cleaning, project record documents, and other required documentation. It details steps for certification of work completion, final inspection, punchlist completion, and submission of final payment application. The section specifies maintenance of record documents such as drawings, specifications, addenda, change orders, and shop drawings, ensuring accuracy for future reference. It also requires submission of additional documentation like payroll certifications, waivers of liens, maintenance bonds, and test results prior to final payment. The document is a critical part of contract administration ensuring proper closeout and final acceptance of the work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Coordination and Meetings Section 01 31 00: This document is Section 01 31 00 titled 'Coordination and Meetings' from a project manual. It outlines the coordination and project conditions, field engineering responsibilities, and procedures for preconstruction and progress meetings. Key content includes scheduling coordination, protection of survey control points, and meeting attendance requirements. The document specifies the roles of the Engineer, Owner, Contractor, and subcontractors in meetings and project coordination. It is intended to ensure efficient sequencing and communication throughout the construction process.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Doc 00 21 13.1 - Construction Facilities and Temporary Controls: This document, titled 'Construction Facilities and Temporary Controls' (Section 01 50 00), outlines the contractor's responsibilities for temporary utilities, controls, and construction facilities during a project. It includes requirements for sanitary facilities, barriers, water control, protection of installed work, security, parking, progress cleaning, waste removal, project identification, removal of temporary utilities and controls, and dust control. The document references related sections and specifies that the contractor must maintain and restore facilities, provide security, and control dust at no additional cost to the owner. Parts 2 and 3 (Products and Execution) are not used in this section.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Doc 00 43 13 - Standard General Conditions of the Construction Contract: This document is the Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee and jointly issued by major engineering and construction organizations. It includes detailed articles covering definitions, preliminary matters, contract documents, bonds and insurance, contractor and owner responsibilities, changes in the work, payments, suspension and termination, dispute resolution, and miscellaneous provisions. The document is copyrighted in 2007 and serves as a foundational contract document outlining the rights, responsibilities, and procedures for construction contracts.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Doc 00 45 10 - Prevailing Wage Determination for Willow Manor Drainage Project: This document is a prevailing minimum wage determination for the Willow Manor Drainage - N. Hills Diversion Pipe project in Upper Dublin Township, Montgomery County, PA. It includes detailed wage rates and fringe benefits for various labor classifications effective from 2024 through 2030. The project involves stormwater diversion infrastructure to address erosion and flooding issues. The wage determination is issued by the Bureau of Labor Law Compliance with a contract award date of 7/14/2026 and a determination date of 6/3/2026. It covers highway project classifications and provides hourly rates and fringe benefits for trades such as asbestos workers, boilermakers, carpenters, electricians, and laborers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Doc 00 52 00 - Asphalt Paving Agreement: This document, titled 'Doc 00 52 00 - Asphalt Paving Agreement,' outlines the specifications for asphalt paving work including materials, execution, and quality assurance. It references Pennsylvania Department of Transportation standards (Publication 408 and Bulletin 27) and details requirements for paving materials, subbase course, tack coat application, and execution procedures such as milling, sweeping, and traffic maintenance. The document includes environmental conditions, contractor responsibilities, and price adjustment clauses. It serves as a technical guide for contractors performing asphalt paving on roadways, ensuring compliance with state and borough standards.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Doc 00 61 13.16 - Measurement and Payment Section: This document is Section 01 22 00 titled Measurement and Payment, detailing the criteria and procedures for measurement and payment under a unit price payment method for construction work. It includes instructions for measurement based on completed work per the Drawings and Project Manual, with the Resident Project Representative responsible for measurements. The section covers various items such as storm inlet protection, pumped water filter bags, bypass pumping, bituminous base and binder courses, epoxy pavement markings, storm sewer pipe, manholes, excavation, stone backfill, concrete curb and sidewalk, lawn restoration, water service relocation, utility location, survey stakeout, traffic control, mobilization, and more. Each item specifies how measurement is determined in the field and payment is made at contract unit or lump sum prices, covering all labor, materials, equipment, and incidental work necessary to complete the tasks. The document serves as a critical part of the contract's statement of work and payment schedule.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Doc 00 73 00 - Asphalt Paving Specifications: This document, titled 'Doc 00 73 00 - Asphalt Paving Specifications,' outlines the technical specifications for asphalt paving work. It includes general descriptions, quality assurance standards referencing Pennsylvania Department of Transportation publications, environmental requirements, and contractor responsibilities. The document details materials to be used, such as PennDOT Superpave for base and wearing courses, and specifies execution procedures including examination, preparation, placing tack coat, asphalt pavement, tolerances, and maintenance of traffic. It also covers price adjustments and submittal requirements. The version date is not explicitly stated but the document references the latest PennDOT Publication 408 standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Doc 00 73 00 - Construction Facilities and Temporary Controls: This document is Section 01 50 00 titled 'Construction Facilities and Temporary Controls' from Doc 00 73 00. It outlines the contractor's responsibilities for temporary utilities, controls, and construction facilities during a project. Key topics include sanitary facilities, barriers, water control, protection of installed work, security, parking, progress cleaning, waste removal, project identification, removal of temporary utilities and controls, and dust control. The document specifies coordination with the Owner, maintenance requirements, and methods to minimize dust. Parts 2 and 3 (Products and Execution) are not used in this section.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Landscape Protection Section 01 56 39: This document is Section 01 56 39 titled Landscape Protection, detailing provisions for protecting landscape elements during construction. It includes requirements for temporary fencing, quality assurance referencing Pennsylvania Dept. of Transportation standards, and job conditions. The document specifies materials such as snow fencing and steel posts, and outlines execution steps including site assessment, erection of fencing, pruning, fertilization, and trenching/tunneling near protected plants. It emphasizes preventing damage to plant roots and maintaining protection areas free from construction encroachment and toxic materials. The document is intended to ensure survival of plant materials during and after construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Material and Equipment Section 01 60 00: This document is Section 01 60 00 titled 'Material and Equipment' and outlines the general requirements for products, transportation, handling, storage, protection, product options, and substitutions related to the contract work. It includes instructions on product quality, handling methods, storage conditions, and procedures for requesting substitutions during the bidding period. The document emphasizes compliance with manufacturer's instructions and contract specifications, and details the process for substitution requests including documentation and approval by the engineer. Parts 2 and 3 of the section are not used.
PDF
PDF, High priority: read this firstpayment-bond
HighAI Summary for Payment Bond for Contract 21-0504003 Willow Manor North Hills Diversion Pipe Project: This document is a Payment Bond for Contract 21-0504003 related to the Willow Manor North Hills Diversion Pipe Project for Upper Dublin Township. It binds the Contractor and Surety to pay for labor, materials, and equipment furnished for the contract. The bond outlines obligations of the Contractor, Surety, and Owner, including claim procedures, notice requirements, and limitations on liability. It includes definitions and legal provisions to ensure payment protection for claimants and compliance with statutory requirements. The bond is executed by authorized representatives of the Contractor and Surety and dated not earlier than the contract award date.
PDF
PDF, High priority: read this firstperformance-bond
HighAI Summary for Performance Bond for Contract 21-0504003 Willow Manor North Hills Diversion Pipe Project: This document is a Performance Bond for Contract 21-0504003 related to the Willow Manor North Hills Diversion Pipe Project awarded by Upper Dublin Township. It outlines the obligations and liabilities of the Contractor and Surety to the Owner, including conditions under which the Surety must act if the Contractor defaults. The bond specifies procedures for notification, default declaration, and Surety's options for completing the contract or compensating the Owner. It also defines key terms such as Balance of the Contract Price and Contractor Default, and includes legal provisions regarding jurisdiction and statutory compliance. The document is essential for ensuring contract performance and mitigating risks associated with contractor default.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Prevailing Minimum Wage Determination for Willow Manor Drainage Project: This document is a prevailing minimum wage determination for the Willow Manor Drainage - N. Hills Diversion Pipe project in Upper Dublin Township, Montgomery County, PA. It includes detailed wage rates effective from various dates for multiple labor classifications such as asbestos workers, boilermakers, carpenters, electricians, and laborers. The document specifies hourly rates, fringe benefits, and total compensation for each classification. The determination date is June 3, 2026, with the contract award date of July 14, 2026. The project involves stormwater diversion infrastructure and is classified as a highway project under the awarding agency Upper Dublin Township. The document is critical for compliance with labor wage laws on this federally influenced construction project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Quality Control Section 01 40 00: This document is Section 01 40 00 titled Quality Control, outlining quality assurance and control measures for installation work. It includes requirements for tolerances, references and standards, mock-ups, testing laboratory services, observation services, and manufacturers' field services. The section details responsibilities for monitoring quality, compliance with manufacturers' instructions, and coordination with engineers. It also covers examination and preparation procedures for substrates and site conditions. The document serves as a technical specification to ensure work meets contract and quality standards.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Quality Control Section 01 40 00: This document is Section 01 40 00 titled Quality Control, detailing quality assurance and control of installation for a construction project. It covers quality assurance, tolerances, references and standards, mock-ups, testing laboratory services, observation services, manufacturers' field services, examination, and preparation. The section outlines responsibilities for monitoring quality control over suppliers, products, workmanship, and site conditions, compliance with manufacturers' instructions and standards, and procedures for testing and observation. It also specifies requirements for mock-ups, testing reports, and cooperation with independent testing firms and observers. The document serves as a statement of work to ensure the project meets specified quality standards and tolerances.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01 29 00 Contract Considerations: This document is Section 01 29 00 titled Contract Considerations, outlining general contract administration procedures. It includes instructions for the schedule of values, applications for payment, change procedures, and alternates. Key content covers submission requirements for schedule of values and payment applications, detailed change order processes including stipulated price, unit price, work change directives, and time and material change orders. The document references related sections and specifies documentation and approval protocols for contract modifications. It serves as a critical guide for managing contract financials and changes during project execution.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 33 00 Submittals Procedures: This document is Section 01 33 00 titled 'Submittals' and outlines the procedures for submitting construction-related documents. It includes instructions on submittal procedures, construction progress schedules, product data, shop drawings, certificates, and manufacturer's instructions. The section specifies requirements for transmitting submittals to the engineer, numbering, scheduling, and review timelines. It also details the format and content for progress schedules, product data, shop drawings, and certifications. The document references related sections on quality control and contract closeout and cites an AGC publication for CPM use in construction. This section is critical for managing project documentation and ensuring compliance with contract requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 54 29 By-Pass Pumping Specifications: This document, Section 01 54 29, outlines the specifications and requirements for by-pass pumping in a sewer system project. It details the contractor's responsibilities to provide equipment, labor, and power to reroute sewage flow temporarily. The document specifies pump capacities, power sources, noise limits, and backup equipment requirements. It also covers installation and operational procedures, including continuous monitoring and emergency notification protocols. The document ensures proper performance and safety during sewer manhole replacement or modification activities.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Section 01 71 13 Mobilization Agreement: This document is Section 01 71 13 titled Mobilization, describing the assembly and setup of facilities required for contract compliance and local regulations. It covers the furnishing of materials and equipment, documentation of existing roadway conditions via video and photos, construction of necessary site facilities, and payment terms stating mobilization is incidental with no separate payment line item. The document ensures proper site preparation and compliance before construction begins.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02 41 16 Demolition Specifications: This document is Section 02 41 16, titled Demolition, outlining the general requirements, related work, submittals, existing conditions, products, and execution procedures for demolition work. It includes instructions on removal of items shown on drawings, protection of existing utilities and facilities, compliance with regulations such as Pennsylvania Act 172 and National Emission Standard for Asbestos, and site preparation. The document details contractor responsibilities for protection, dust control, traffic management, and restoration using approved materials. Execution covers preparation, demolition methods, clean-up, and debris disposal, emphasizing safety, coordination, and maintaining site cleanliness. The document serves as a technical specification for demolition work within a construction contract.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 20 00 Concrete Reinforcement Specifications: This document is Section 03 20 00, Concrete Reinforcement, providing detailed specifications for reinforcing steel bars, wire fabric, and accessories for cast-in-place concrete. It references standards such as ACI 301, ACI 318, ASTM A615, and CRSI manuals. The section covers general requirements, quality assurance, submittals, product standards including reinforcing steel and welded wire fabric, accessories like tie wire and supports, fabrication guidelines, and execution instructions for placement and securing of reinforcement. The document ensures compliance with structural codes and quality certifications, dated as part of the contract specifications.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 11 00 Clearing and Grubbing Specifications: This document is Section 31 11 00, titled Clearing and Grubbing, outlining the scope, definitions, related work, job conditions, submittals, materials, and execution procedures for clearing and grubbing work. It includes requirements for clearing vegetation and obstructions, grubbing roots and stumps, stripping and stockpiling topsoil, and debris disposal. The document specifies contractor responsibilities, permits, agreements for debris disposal, materials like temporary fencing and tree wound dressing, and detailed execution steps such as preparation, utility relocations, clearing, grubbing, topsoil handling, debris disposal, and restoration. The section emphasizes environmental protection, coordination with property owners, and restoration of disturbed areas.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 20 00 Earthwork Specifications: This document is Section 31 20 00, titled Earthwork, providing detailed specifications for site grading, excavation, backfill, and preparation of subgrade for site structures, walks, and pavements. It includes related work references, quality assurance requirements including compaction testing standards, submittal requirements for certified test reports, and job conditions for earthwork activities. The document specifies soil materials, storage and handling of excavated materials, excavation tolerances, cold weather protection, backfill and fill procedures, and placement and compaction methods. It references standards such as Pennsylvania Department of Transportation Publication 408 and ASTM test methods. The document is intended to guide contractors in performing earthwork in compliance with project requirements and quality standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 22 10 Topsoiling and Finish Grading Specifications: This document is Section 31 22 10, titled Topsoiling and Finish Grading, detailing the preparation of subgrade, placing topsoil, and finish grading for lawn seeding, sodding, or planting. It includes related sections, quality assurance requirements including soil testing, reference standards such as ASTM and Pennsylvania regulations, submittal requirements for sod samples and material certifications, and product delivery and handling instructions. The document specifies topsoil sources and quality criteria for existing and imported topsoil. Execution instructions cover subgrade preparation, topsoil placement conditions and depths, and finish grading to ensure proper contours and removal of unsuitable materials. The document is intended for use in landscaping and site preparation work and provides technical and procedural guidance for contractors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 33 Excavation, Backfill and Compaction - General Conditions: This document is Section 31 23 33 titled Excavation, Backfill and Compaction, part of the General Conditions for a construction project. It outlines the scope of work including excavation, backfill, and compaction related to utility construction and structures. It references related sections and quality assurance standards including PennDOT and ASTM testing methods. The document details compaction testing requirements, submittals for certification, job conditions including excavation classification, compaction standards, traffic control, and protection of utilities and vegetation. It also specifies pipe bedding and embedment materials for various pipe types according to PennDOT Publication 408 Specifications. The document serves as a technical specification guiding construction practices and quality control for earthwork and utility installation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 33 Excavation, Backfill and Compaction Specifications: This document is Section 31 23 33 covering Excavation, Backfill and Compaction for utility and structure construction. It includes general work descriptions, related sections, quality assurance requirements including compaction testing standards and procedures, submittal requirements for certifications and test results, job conditions such as excavation classification and backfill compaction standards, traffic control, and protection of existing utilities and structures. The document references Pennsylvania Department of Transportation standards and ASTM test methods. It also details pipe bedding and embedment materials for various pipe types. The document is a technical specification intended to guide construction and testing practices for excavation and backfill work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 01 16.71 Milling Asphalt Pavement Specifications: This document, titled Section 32 01 16.71, details the specifications for milling asphalt paving as part of a construction project. It includes general information, quality assurance referencing Pennsylvania Department of Transportation Publication 408, and execution requirements. Key content covers equipment standards, milling operation procedures to ensure surface quality, dust control, handling of milled material, and timelines for overlay asphalt application. The document ensures compliance with PennDOT standards and proper disposal of milled material.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 12 23 Restoration of Paved Surfaces: This document is Section 32 12 23 titled 'Restoration of Paved Surfaces' and outlines the requirements for temporary and permanent paving, shoulder, walkway, driveway, curb and gutter restoration, and signage related to construction work. It references Pennsylvania Department of Transportation standards and specifies materials, quality assurance, submittals, and execution methods. Key content includes detailed procedures for temporary paving, permanent paving, and restoration of various surfaces, along with traffic control and maintenance requirements. The document ensures compliance with state specifications and proper restoration of damaged areas during construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 17 23.16 Epoxy Pavement Markings Specifications: This document, Section 32 17 23.16, details the specifications for furnishing and installing reflectorized, two-component epoxy resin pavement markings. It includes material requirements such as epoxy resin colors, glass beads, and black aggregate, referencing PennDOT Publication 408 and Bulletin 15. The document outlines application equipment standards, surface preparation, construction methods, and quality control measures including retroreflectivity and protection of surfaces. It also specifies tolerances, traffic control measures, and guarantees for the pavement markings. The document is intended to ensure proper installation and durability of epoxy pavement markings in compliance with applicable codes and standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 92 00 - Finish Grading, Seeding, and Sodding Specifications: This document is Section 32 92 00 detailing the specifications for finish grading, seeding, and sodding work. It includes general descriptions of the work scope such as placing topsoil, soil conditioning, finish grading, seeding, sodding, and maintenance. Quality assurance requirements specify soil testing and reference standards. Submittal requirements include certifications for topsoil, fertilizer, lime, and seed mixtures. Product delivery and handling instructions are provided for seed and sod. The document outlines product specifications for topsoil, fertilizer, lime, seed, seed mixtures, inoculant, mulching materials, and sod. Execution instructions cover timing for operations, preparation of subgrade, placing topsoil, and tillage. The document is intended to ensure restoration of unpaved surfaces and proper establishment of vegetation as part of construction projects.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 93 02 Landscaping Specifications: This document is Section 32 93 02, Landscaping, detailing the planting of trees, shrubs, ground covers, perennials, and ornamental grasses including soil amendments, fertilizer, mulch, and maintenance. It includes definitions, quality assurance requirements for nurseries and installers, regulatory compliance, harvesting, delivery, storage, and handling instructions. Environmental requirements, sequencing and scheduling, warranty provisions, and maintenance services are specified. Part 2 covers product requirements such as nursery membership, plant species and sizes, topsoil characteristics, and organic soil amendment materials. The document ensures compliance with ANSI and USDA standards and provides detailed operational and maintenance data for landscaping work.
PDF
PDF, High priority: read this firstinstruction-to-bidders
HighAI Summary for Section B - Instruction to Bidders - 2026 Mill & Overlay Final Version: This document titled 'Section B - Instruction to Bidders - 2026 Mill & Overlay Final Version' provides detailed instructions and general conditions for bidders participating in the 2026 Mill & Overlay project. It includes definitions of key terms used throughout the contract documents, such as bid, bidder, contract, contractor, bonds, and various standards organizations. The document serves as a guide for bidders on how to prepare and submit their bids, outlining the contractual and procedural requirements necessary for the project. This final version is essential for understanding the bidding process and contractual obligations for the project.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Section C - General Conditions - 2026 Mill & Overlay: This document titled 'Section C - General Conditions - 2026 Mill & Overlay' includes key contract-related forms and affidavits for a public works project. It contains a Bid Bond form outlining surety obligations, a Form of Guaranty certifying bid authenticity, a Non-Collusion Affidavit to ensure fair bidding practices, instructions for the affidavit, and a Public Works Employment Verification form required by Pennsylvania Act 127 of 2012. The document is essential for bidders to comply with bonding, anti-collusion, and employment verification requirements for the project.
PDF
PDF, High priority: read this firstbid-form
HighAI Summary for Section D - Bid Form - 2026 Mill & Overlay Program: This document is the bid form for the 2026 Mill & Overlay Program issued by Upper Dublin Township. It includes the proposal and contract terms, instructions to bidders, and certification requirements. The contractor proposes to furnish materials and perform work as specified in the Schedule of Prices and related specifications. The bid form outlines the deposit of proposals, bid bond requirements, compliance with laws, and performance and payment bond obligations. The document is dated January 23, 2026, and includes spaces for contractor certification and signatures. It serves as a formal offer to perform the specified work under the terms and conditions set forth by the municipality.
XLSX
XLSX, High priority: read this firstspecifications
HighAI Summary for Section E Technical Specifications for Milling/Wearing Course Overlay 2026: This document provides the technical specifications for the milling and wearing course overlay work scheduled for 2026. It outlines the scope of work including full-width road milling to variable depths and construction of a 1-1/2" compacted depth Superpave Asphalt Mixture wearing course overlay. The document details construction requirements, contractor and township responsibilities, equipment specifications, and material requirements. It emphasizes compliance with PennDOT Form 408 and recent updates requiring Warm Mix Asphalt (WMA) instead of Hot Mix Asphalt (HMA). The document also includes special considerations such as ADA-compliant ramp adjustments and storm sewer system protection. The work period is specified between July 31, 2026, and August 21, 2026.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Section E - Technical Specs. 2026 Prevailing Wages: This document is the Bureau of Labor Law Compliance Prevailing Wages Project Rates for the 2026 Mill & Overlay Project in Upper Dublin Township, Montgomery County. It includes detailed hourly wage rates, fringe benefits, and total compensation for various labor classifications such as asbestos workers, boilermakers, carpenters, electricians, and laborers. The rates are effective as of various dates primarily in 2024 and 2025, with some extending into 2026. The document supports compliance with labor wage standards for the project awarded on 2/10/2026, providing critical wage determination data for contractors and subcontractors involved in the highway construction project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Soil Erosion and Sediment Control Specifications: This document is Section 01 57 13 titled Soil Erosion and Sediment Control, outlining the requirements for implementing and maintaining soil erosion and sediment control measures for a construction project. It references Pennsylvania Department of Environmental Protection and PennDOT standards. The document details temporary and permanent control measures, materials to be used such as silt fences and inlet protection devices, and execution guidelines including installation, maintenance, and field modifications. The purpose is to minimize soil erosion, sediment runoff, and ensure compliance with environmental regulations throughout the project lifecycle.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Standard General Conditions of the Construction Contract: This document is the Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee and jointly issued by major engineering and construction organizations. It includes detailed articles covering definitions, preliminary matters, contract documents, availability of lands, bonds and insurance, contractor's responsibilities, owner's responsibilities, engineer's status, changes in the work, cost and payments, suspension and termination, dispute resolution, and miscellaneous provisions. The document is copyrighted in 2007 and endorsed by the Construction Specifications Institute. It serves as a foundational contract document outlining the general conditions applicable to construction contracts.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Storm Drain Pipe Section 33 41 00 Specifications: This document is Section 33 41 00, titled Storm Drain Pipe, detailing the specifications for storm sewer pipelines. It includes general descriptions, related sections, quality assurance standards referencing AASHTO, ASTM, and Pennsylvania Department of Transportation specifications, and submittal requirements. The document specifies product details for various types of pipes including corrugated galvanized steel, non-reinforced concrete, reinforced concrete, elliptical reinforced concrete, and smooth lined corrugated polyethylene pipes. Execution instructions cover preparation, pipe laying in trenches, joint assembly, and backfilling procedures. The document ensures compliance with technical standards and proper installation methods for storm drain pipe systems.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Storm Inlets, Catch Basins, Trench Drains and End Sections Specification: This document is Section 33 44 14, detailing specifications for storm drainage components including curb inlets, catch basins, trench drains, and pipe end sections. It references related sections and standards such as ASTM and Pennsylvania Department of Transportation Publication 408. The document outlines quality assurance requirements, acceptable manufacturers, submittal requirements for shop drawings, product delivery and handling instructions, materials specifications, fabrication standards, and execution procedures including excavation, construction, and backfilling. It serves as a technical guide for construction and installation of storm drainage infrastructure.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Notice updated
Response deadline changed from Jan 23, 2026 to Jul 8, 2026. The notice title changed. The notice description changed. The point of contact changed.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Upper Dublin Township, offices located at 801 Loch Alsh Avenue, Fort Washington, PA 19034, will receive sealed bids online until 10:00 A.M., prevailing time on July 8, 2026, 2026 at which time and place the bids shall be publicly opened and read for: Contract 21-05040 – Willow Manor North Hills Avenue Diversion Pipe The work to be completed under this project in Upper Dublin Township, Montgomery County, PA includes a Base Bid for the construction of a storm sewer diversion system and two alternate items for asphalt mill and overlay. The work consists of installing a diversion manhole structure, several inlets and manholes, and approximately 1,860 LF of 36-inch and 42-inch storm pipe in North Hills and Kimball Avenues, minor utility relocations and sanitary lateral reconnections, roadway restoration, erosion and sediment control, and traffic control. All material, labor, and equipment shall be in accordance with PennDOT Publication 408 and applicable township standards. All Bidding Documents and Solicitation details may be obtained at PennBid™ https://pennbid.bonfirehub.com. Click on the Open Public Opportunities” tab. All documents, specifications, and drawings can be obtained and secure bids submitted online at no cost. A nominal fee of 0.33% of the bid amount (up to $5,000) is assessed only to bidders who are awarded contracts. For bidders who are not the winning bid; there are absolutely no fees.
Each bid shall be submitted in accordance with the Instructions to Bidders and must be accompanied by a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to Upper Dublin Township along with an Agreement of Surety certifying that the required Performance and Payment Bonds will be provided to the Bidder. The successful Bidder shall be required to furnish proof of insurance and bonds for Performance, Payment, and Maintenance in such form as meets the approval of Upper Dublin Township and having as security thereon such Surety company or companies as are approved by Upper Dublin Township. This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry. This project is subject to applicable provisions of Act 127, Pennsylvania Public Works Employment Verification, as amended. No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids. Upper Dublin Township reserves the right to reject any and all bids, or parts thereof, to select any combination of the Base Bid and/or Alternate Bids, and to accept the bid, which it deems, in its sole judgment, to be in the best interest of the Township.