Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2026 MIM I5 Various Locations Pavement Repair

Closed
S-73000-00015856State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
T6026-1 North River Gap Sidewalk Project
Solicitation # 27-018
The City of Sandy Springs is soliciting bids for the T6026-1 North River Gap Sidewalk Project, which involves the construction of approximately 300 linear feet of sidewalk on the east side of North River Drive, spanning from 100 North River Drive to 501 North River Parkway. The scope of work includes site preparation through the removal of granite, concrete, and vegetation, the supply and grading of clean fill and topsoil, the reconstruction of two driveways, and the installation of ADA-compliant ramps. All work must adhere to Georgia Department of Transportation (GDOT) Standard Specifications and the Manual of Uniform Traffic Control Devices (MUTCD), with materials sourced from GDOT certified suppliers. The project requires a 75-day performance period from the issuance of the Notice to Proceed, with work permitted on weekdays from 8:00 AM to 5:00 PM and traffic-interfering activities restricted to 9:00 AM to 4:00 PM. Bids for solicitation 27-018 must be submitted by January 7, 2027. Required documentation includes a bid schedule, price certification, drug-free workplace certification, and a Georgia Security and Immigration Compliance Act affidavit. A bid bond is mandatory if the bid price exceeds $100,000, and the successful contractor must provide performance and payment bonds, as well as a certificate of insurance. Key deliverables include before-and-after project videos, independent testing for concrete and sub-grade compaction, and a two-year warranty on sod installation. There is no specified set-aside status for this solicitation.
City of Sandy Springs

POSTED

about 8 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
International
EN27TFM021 South Peter FSR Extension - Arrow
Solicitation # EN27TFM021
The EN27TFM021 South Peter FSR Extension - Arrow is a Major Works Contract for forest road construction issued by the BC Timber Sales Branch of the Province of British Columbia. The scope of work involves mobilization and demobilization, site preparation including clearing and debris disposal, and roadway and drainage excavation such as embankments, ballasting, and excavation in solid rock. The project is located in British Columbia, Canada, and requires the contractor to commence work immediately upon execution of the agreement, with completion dates defined in the contract schedules. Award is based on identifying the lowest compliant bidder, with evaluation factors focusing on the bidder's technical experience, qualifications, and possession of necessary machinery and equipment. Key requirements include mandatory BC Forest Safety Council SAFE certification for all subcontractors and adherence to strict camp standards regarding health, sanitation, and water safety. The contract is administered by the Minister of Forests through the Kootenay Business Area, with payments typically processed between 30 to 60 days after invoice certification. Bidders must provide bid security, and the successful contractor is required to provide performance and labour and material payment bonds, as well as WorkSafe BC coverage.
BC Timber Sales Branch

POSTED

about 9 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The contract involves furnishing, placing, and compacting 4 and 5 inches of Level 4, ½-inch Dense Asphalt Concrete Pavement (ACP) mixture, as well as cold plane pavement removal at these depths. It also includes the removal and installation of bridge joints, application of tack coat, and the installation of both temporary pavement markings and permanent striping. Traffic control measures must be provided throughout the project to ensure safety and compliance. All work is required to adhere to the 2024 Oregon Standard Specifications for Construction. This solicitation, titled "2026 MIM I5 Various Locations Pavement Repair," is managed by Oregon's Region 1 office in Clackamas, OR. The posting date was January 30, 2026, with a response deadline of February 17, 2026. Ivory Williams serves as both the point of contact and purchaser for the project. The work location is also in Clackamas, Oregon, and interested parties can find more details through the OregonBuys procurement portal.

General Info

Pavement repair with asphalt placement, bridge joint work, markings, and traffic control in Clackamas, Oregon.

Place of Performance

Clackamas, OR, 97015, USA

Set-Aside

NONE

Documents

4
PDF, High priority: read this first34 pages · specifications
High
DOCX, High priority: read this first28 pages · itb
High
XLSX, High priority: read this first2 pages · bid-pricing-form
High
DOCX, High priority: read this first26 pages · contract-document
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 7 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Department of Transportation
Contacts2 people available
OfficeClackamas, OR, 97015, USA

Full Description

Show more
Contract requires Contractor furnish, place and compact 4-inches and 5-inches of Level 4, ½â?? Dense ACP Mixture, cold plane pavement removal at 4-inches and 5-inches, furnish and install bridge joints, remove bridge joints, provide and apply tack coat, furnish and install temporary pavement markings, furnish and install permanent striping and traffic control. Comply with the 2024 Oregon Standard Specifications for Construction

More opportunities from Oregon → Department of Transportation

Same awarding agency

NAICS: 238160
New
SLED
Davis Slough three roofs replacement
Solicitation # 00018265
The Oregon Department of Transportation is soliciting bids for the replacement of metal roofs, insulation, and gutters on three buildings at the Davis Slough Maintenance Station in Coos Bay: Storage building #04, Maintenance building #01, and Electrical storage building #03. The scope of work includes the demolition and removal of existing materials and the installation of new systems, including fasteners, ridge caps, and eave trim. The contractor is responsible for obtaining the Coos County Building Department permit and coordinating all inspections. Performance is subject to State Buy America requirements, BOLI prevailing wage rates, and Oregon OSHA safety standards. Substantial completion is required by March 31, 2027, with final completion by April 10, 2027. Award will be granted to the responsible bidder submitting the lowest responsive bid, evaluated based on total price using lump sum, unit price, or a combination of both. Bidders must provide bid security equal to 10% of the total bid amount and must submit a record of three similar projects completed within the last three years. Required certifications include non-discrimination in subcontracting and adherence to workplace policies regarding sexual harassment and discrimination. There is no set-aside status specified for this solicitation. All materials must be delivered in original packaging and stored according to specific moisture control and stacking guidelines to ensure quality.
Roofing Contractors

POSTED

about 8 hours ago

DEADLINE

in about 2 months
View Details

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS