2026 Pavement Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Eureka is planning a pavement rehabilitation project across three key streets—2nd Street, N Street, and Harris Street—to enhance roadway conditions and pedestrian accessibility. Work will include removal and replacement of deteriorated asphalt, asphalt overlays of varying thicknesses depending on the location, and comprehensive ADA-compliant pedestrian upgrades such as new curbs, sidewalks, curb ramps, striping, and truncated domes. On 2nd Street, full reconstruction is scheduled with an 18-inch-depth excavation, regrading, and a 0.20-foot asphalt surface. N Street will receive a 0.20-foot overlay after grinding 0.20 feet curb-to-curb, while Harris Street will see driving lanes ground and compacted with a 0.15-foot overlay, along with replacement of 16 traffic detector loops on Harris Street and two each on F and H Streets. Excavation for pedestrian improvements will be limited to one foot or less in previously disturbed areas, and asphalt grinding will be confined to existing road sections to minimize disruption. Construction is set to begin in August 2026 and conclude by May 2027, with work confined to weekday daytime hours to reduce public impact. Typical equipment such as asphalt grinders, pavers, rollers, backhoes, and jackhammers will be used, along with thermoplastic striping machinery. Traffic control will involve temporary lane shifts, short-term detours, or daytime closures, and on-street parking may be restricted with at least 48 hours’ notice to affected properties. Public notifications will be issued throughout the project. All excavation spoils will be transported to a contractor-selected, City-approved permitted disposal facility. The 2nd Street segment lies within the coastal zone and is subject to a separate coastal exemption. The project is forecasted under the City of Eureka’s planning department, with primary contact information listed for inquiries.

General Info

Eureka to rehab 2nd, N, and Harris Streets with ADA upgrades, asphalt work, and traffic detours from August 2026 to May 2027.

Agency

California → City of Eureka

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

N St 7th to 14th, Harris St A to M, 2nd St Commercial to C, Eureka, CA, 95501

Set-Aside

NONE

Documents

(1)

2026 Pavement Rehabilitation Project CEQA Notice of Exemption

PDFceqa-notice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Eureka
Office AddressN/A
Contacts
Chris LohoefenerSenior Planning

Full Description

Show more
The City of Eureka proposes a pavement maintenance project to improve roadway conditions and pedestrian accessibility along portions of three streets: 2nd Street, N Street, and Harris Street. The project includes removal and replacement of failed asphalt, asphalt overlay, and installation of ADA-compliant pedestrian improvements to enhance safety for all users. The 2nd Street work area is located within the coastal zone and is subject to a separate coastal exemption. Project work varies by location but generally includes asphalt removal and replacement, roadway overlay, adjustment of valves, manholes, and survey monuments to grade, and replacement of traffic detector loops. Pedestrian improvements include installation of new curb, sidewalk, curb ramps, striping, and truncated domes. Excavation for curb and sidewalk improvements will generally be one foot or less in previously disturbed areas, and asphalt grinding will be limited to existing disturbed roadway sections. Specific work to be completed in each roadway area is outlined below: • N Street (7th Street to 14th Street): Grind 0.20 feet of existing pavement curb-to-curb, followed by compaction and placement of a 0.20-foot asphalt overlay. • Harris Street (A Street to M Street): Grind and compact the driving lanes, followed by installation of a 0.15-foot asphalt overlay. The project will also replace 16 traffic detector loops on Harris Street, and two loops each on F Street and H Street. • 2nd Street (Commercial Street to C Street): Full roadway reconstruction, including 18-inch-depth excavation, regrading, compaction, and placement of a 0.20-foot asphalt surface. Construction will require typical roadway equipment, including asphalt grinders, pavers, rollers, sweepers, tack trucks, loaders, water trucks, and hand tools, as well as jackhammers and backhoes for curb and sidewalk work. Thermoplastic striping will be installed using standard application equipment. All spoils will be disposed of at a contractor-selected, City-approved permitted facility. Traffic control measures will vary by location and may include temporary lane shifts, short-term detours, or daytime roadway closures. On-street parking may be temporarily restricted with a minimum 48-hour notice to affected properties. Construction will occur during daytime weekday hours and minor traffic delays are expected. Public notices will be provided. Construction is planned to start the month of August 2026 and is expected to take until the end of May 2027.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract entails the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water supplies. The project requires integrated engineering solutions to meet regulatory standards for drinking water safety, with scope covering all phases from site preparation to system commissioning, ensuring seamless integration with existing infrastructure. All work must comply with industry best practices and performance benchmarks for PFAS mitigation. Interested parties must submit responses by September 3, 2026, under solicitation number lacsd-surface-water-pfas-removal-project-no-251-ca, with the project designated for Disadvantaged Business Enterprise participation under Department of Transportation guidelines. The North American Industry Classification System code is 237310, reflecting wastewater and sewage system construction. The contracting entity is Pyramid Building & Engineering, Inc., and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005. Performance is limited to California locations, with no specified city or zip details provided for the worksite.
Pyramid Building & Engineering, Inc.

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
3367 Secondary Treatment System Upgrades
Solicitation # 3367-secondary-treatment-system-upgrades
The Town of Windsor is pursuing upgrades to its secondary treatment system through a solicitation titled 3367 Secondary Treatment System Upgrades, issued by J.F. Shea Construction, Inc. The project is located in Windsor, California, and is intended to enhance wastewater treatment capabilities using NAICS code 237310, with additional relevant codes covering construction, plumbing, electrical, and manufacturing activities tied to infrastructure improvement. The solicitation is exclusively set aside for small business concerns, including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone Small Business, Veteran-Owned Small Business, Service-Disabled Veteran-Owned Small Business, and other designated disadvantaged business categories, ensuring opportunities for traditionally underrepresented and small-scale enterprises. The response deadline is September 3, 2026, with the solicitation posted on August 10, 2026, and all proposals must be submitted via the federal opportunity portal managed by the Small Business Administration. The primary point of contact for inquiries is Lori Olivas of J.F. Shea Construction, Inc., reachable by phone or email for clarification, technical questions, or submission guidance. The scope involves significant civil and mechanical construction work focused on system upgrades, requiring qualified contractors with expertise in treatment infrastructure, environmental compliance, and heavy construction within municipal utility environments.
J.F. Shea Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
LOCAL LET MAINTENANCE CONTRACT, TOM GREEN CO, LIMESTONE ROCK ASPHALT
Solicitation # 6508-40-001_0926
The Texas Department of Transportation is soliciting bids for a limestone rock asphalt maintenance project on US-67 in Tom Green County, with an estimated contract value of $373,411.00. The solicitation, numbered 6508-40-001_0926, was posted on August 10, 2026, and bids are due by September 8, 2026, at 10:00 AM, with submissions required through the Electronic State Business Daily and Electronic Bidding System. Work is to be performed within the San Angelo District, encompassing multiple locations along the specified highway, and must be completed within 180 calendar days from the award date. The contract falls under NAICS code 237310 and is administered by TxDOT’s Maintenance Contract Office in San Angelo, with all communications and bid submissions directed to their physical address at 4502 Knickerbocker Rd, San Angelo, TX. No federal acquisition regulation clauses are included in the provided documentation, and the procurement is classified as a state-level maintenance contract with no indicated socioeconomic set-asides, as the Small Business Enterprise goal is zero percent. The scope of work involves maintaining limestone rock asphalt to meet transportation infrastructure standards, though detailed technical specifications, inspection criteria, or acceptance protocols are not present in the available materials and are presumed to be contained in referenced addenda or official contract documents. Payment and contract administration are handled by TxDOT’s San Angelo District office, with no designatedCOR, COTR, or PCO named in the solicitation. The estimated cost represents the full contract value without option periods or additional line items, and no packaging, marking, invoicing system, or FOB terms are specified, reflecting the simplicity and routine nature of this maintenance contract under state authority.