Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

2026 Street Resurfacing Project No. 01-26

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 2026 Street Resurfacing Project No. 01-26 is a forecast infrastructure initiative managed by the City of Pleasant Hill Public Works department in California. The project focuses on comprehensive pavement restoration and street improvements within two specific residential areas: Zone 4, bounded by Gloria Drive, Gregory Drive, Lucille Lane, and Ardith Drive; and Zone 14, bounded by Creekside Road, Gregory Lane, Pleasant Hill Road, and Helen Road. The scope of work includes base failure repairs, monument preservation, utility adjustments, concrete curb and gutter repairs, and the installation of ADA-compliant curb ramps. Technical operations will involve cold planning, milling, wedge grinding, full depth recycling, and hot mix asphalt overlay, complemented by temporary and permanent striping. Additional project requirements include traffic control, tree trimming, and root pruning to facilitate the street improvements. The project is classified under NAICS code 237310 and has been determined exempt from the California Environmental Quality Act under Class 1 and Class 2 guidelines, as the work consists of repair and maintenance within existing city right-of-way without expanding the current use. Primary points of contact for the project are Associate Engineer Shawn Hung and Public Works Director Ann James.

General Info

Pleasant Hill to resurface streets in 2026 with asphalt, curb, ADA ramp, and utility upgrades.

Agency

California → City of Pleasant Hill

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Elinora Drive to Pleasant Hill Road (East & West) Maureen Lane to Gregory Lane (North Bound), Pleasant Hill, CA, 94523

Set-Aside

NONE

Documents

(1)

NOE - 2026 Street Resurfacing Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pleasant Hill
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Pleasant Hill
Office AddressN/A
Contacts
Shawn HungAssociate Engineer
Ann JamesPublic Works Director

Full Description

Show more
The project includes pavement restoration, such as base failure repairs, monument preservation, utility adjustments, concrete curb and gutter repairs, ADA curb ramp installations, cold planning/milling, wedge grinding, and full depth recycling. Additional work includes hot mix asphalt overlay, temporary and permanent striping, traffic control, tree trimming and root pruning and all other related improvements along the project streets.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, directional drilling, underground piping, asphalt and concrete paving, electrical work, and telecommunications. The project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating strict adherence to DBE Program requirements and the California Labor Code. Eligible bidders must possess a valid California Contractor’s license and provide acceptable insurance. SBE and VSBE firms must provide certification evidence from the Department of General Services and the Port of Long Beach PlanetBids portal. The project is subject to a Project Labor Agreement, prevailing wage rates, and requires firms performing onsite work to be signatory to collective bargaining agreements with specific trades to ensure labor harmony. Subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact the Lead Estimator to receive an Invitation to Bid via the BuildingConnected system before the September 15, 2026, deadline.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS