Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

2027 Milling and Resurfacing Project

Closed
C007139State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and infrastructure works, including underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, shoring, asphalt paving, and the installation of utilities, manholes, and traffic signals. Additional requirements include land surveying, site security, traffic control, and storm water pollution prevention. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to various collective bargaining agreements. Interested parties must submit their quotes by November 18, 2025, via the Building Connected electronic system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Davison Rd MP 0.01 Bridge Rehabilitation
Solicitation # CRP 2198
Lewis County Public Works is soliciting sealed bids for the Davison Rd MP 0.01 Bridge Rehabilitation project, identified as County Road Project 2198 and Federal Aid Project BHOS-2021(075). The scope of work involves providing all labor, materials, and equipment to improve the bridge, specifically focusing on replacing the deck and cleaning and painting the metal surfaces of steel truss members, floorbeams, stringers, and other steel components. The engineer's estimate for the project is between 1.9 and 2 million dollars. All work must comply with WSDOT 2026 standard specifications, and specific technical requirements include strict adherence to an in-water work window from April 1st to September 30th for cleaning and painting activities. Sealed bids must be submitted electronically or delivered to the Clerk of the Board of Lewis County Commissioners by 12:15 PM on Thursday, November 19, 2026. Proposals must include a bid deposit equal to five percent of the bid amount in the form of cash, certified check, cashier's check, or surety bond. Required documentation includes a signed proposal page acknowledging two addendums, a non-collusion declaration, wage law compliance certification, a bidder questionnaire, and a local agency certification for federal-aid contracts. The successful bidder will be required to provide a contract bond and submit certified payrolls on a weekly basis.
Public Works- Roads

POSTED

about 17 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
Beresford Ave Extension Phase 2B: S Kepler Rd/ Dr MLK Beltway to SR 44
Solicitation # 27-B-17JD, C2103
The County of Volusia, Engineering and Construction department, is soliciting bids for the Beresford Avenue Extension Phase 2B project, identified as solicitation number 27-B-17JD, C2103. This infrastructure project involves the new construction of Beresford Avenue, extending the roadway from approximately 1,100 feet east of Kepler Road to the intersection of SR 44 and Summit Avenue, as well as the realignment of 1,600 feet of Summit Avenue. The scope of work includes the creation of two 11-foot travel lanes in each direction with 6-foot paved shoulders, roadside ditches, drainage structures, and a 12-foot concrete trail on the south side. All pavement markings must be thermoplastic and adhere to FDOT standard plans. The estimated construction cost for this project is 4,911,975.00 dollars. The contract will be awarded to the single lowest responsive and responsible respondent based on criteria including business location, financial resources, technical experience, and past performance. Bids are due by December 1, 2026, and must be accompanied by a bid bond of at least five percent of the bid amount. The project is subject to liquidated damages of 2,529.00 dollars per day for failure to meet delivery dates. Payment terms are set at thirty days from the receipt of undisputed invoices, with funding limited to the budget approved by the Volusia County Council. The contractor is responsible for all quality control sampling and must comply with ADA and civil rights regulations.
Engineering & Construction

POSTED

about 19 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
250218.01 Reconstruction of 84th Avenue and Riley Street Bike Path
Solicitation # 250218.01
The City of Zeeland is soliciting bids for the reconstruction of 84th Avenue and the Riley Street Bike Path in Ottawa County, Michigan. This project involves approximately 1,450 feet of street and drive reconstruction and 1,450 feet of a shared use path, including HMA paving, culvert replacement, drainage improvements, and signage. Major work items include 5,800 square yards of 8-inch aggregate base, 540 feet of 18-inch sewer in a stone trench, and 2,800 feet of modified concrete curb and gutter. The project is entirely funded by the City of Zeeland with an engineer's estimate of 1,111,000 dollars, and all work must be completed by April 30, 2027. Encrypted bids must be submitted via the Bid Express site by 11 a.m. local time on Thursday, November 12, 2026. Only bidders prequalified by the City of Zeeland will have their bids opened. Proposals must be based on unit prices and must be accompanied by a proposal guarantee of five percent of the bid amount. Award evaluation is primarily based on the total bid price and the competency of the bidder. Successful contractors are required to provide performance and lien bonds each totaling 100 percent of the contract value, as well as certifications for Workmen's Compensation Insurance and manufacturer certifications for sewer pipes. Project direction is managed by Scott A. Smith, P.E. of ZEEZON LLC, with inspection services provided by Moore & Bruggink, Inc.
Moore & Bruggink, Inc

POSTED

about 19 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The 2027 Milling and Resurfacing Project, solicitation number C007139, is a construction contract issued by the Central Florida Tourism Oversight District for the maintenance of public infrastructure. The scope of work involves milling and resurfacing Bonnet Creek Parkway and adjoining roadways from Buena Vista Drive to Vista Blvd, including Backstage Lane and Overpass Road, as well as Hotel Plaza Blvd from E. Buena Vista Drive to SR 535. Technical requirements include milling depths between 1.5 and 5 inches using SP Structural and Friction Course FC-12.5 asphalt. Additional work at Hotel Plaza Blvd includes the removal of existing crosswalks, concrete header curbs, and pavers, which will be replaced with colored asphalt patterned pavement. The project is scheduled to begin on November 23, 2026, with an estimated completion date of August 10, 2027. Eligible bidders must demonstrate at least eight years of roadway experience, hold specific FDOT pre-qualifications, and provide three references for similar projects completed within the last five years. Strict operational constraints are in place, including work hours limited to 11:00 PM through 7:00 AM, holiday moratoriums, and the requirement to maintain at least one accessible entrance for resorts at all times. Contractors must provide a 5.00% bid bond, payment and performance bonds, and comprehensive insurance coverage. Compliance requirements include submitting a Project Specific Safety Plan, adhering to storm preparation procedures, and signing affidavits regarding conflicts of interest, public entity crimes, human trafficking, and foreign countries of concern. Awarding will be based on the lowest responsive and responsible bidder.

General Info

Road milling and resurfacing project for Central Florida Tourism Oversight District starting November 2026.

Place of Performance

1900 Hotel Plaza Blvd Lake Buena Vista, Florida 32830, CA, USA

Set-Aside

NONE

Documents

22
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstindustry-day
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first2 pages · conflict-of-interest-affidavit
High
PDF, High priority: read this first76 pages · contract-document
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first4 pages · past-performance
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this first667 pages · specifications
High
PDF, High priority: read this first10 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priority1 page · affidavit
Low
PDF, Low priority1 page · form
Low
PDF, Low priorityspecial-notice
Low
PDF, Low priority1 page · affidavit
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Construction Management Department of Central Florida Tourism Oversight District
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: 1.1         The Central Florida Tourism Oversight District (herein after “District”, “Owner” and “CFTOD”) is a Special Taxing District that serves as a local government entity. The District is responsible for its public infrastructure including, but not limited to roads, bridges, and water control system. The scope of work for the 2027 Milling & Resurfacing Project includes but is not limited to: Maintenance of Traffic/Temporary Traffic Control/Lane Closures; Erosion & Sedimentation Control; Existing Paver and Concrete Header Curb Demolition; Milling & Resurfacing; Signage & Pavement Markings and Patterned Pavement Installation1.2         The Project is briefly described as follows:A.      Milling & Resurfacing of the following locations:Bonnet Creek Parkway and adjoining roadways from Buena Vista Drive to Vista Blvd including Backstage Lane and Overpass Road.Hotel Plaza Blvd. from E. Buena Vista Drive to SR 535.B.      Milling & Resurfacing includes milling depths ranging from 1.5” to 5” and shall utilize the following asphalt courses: SP Structural (Traffic E) (PG 82-22) depths ranging from 1.5” to 3.5” and Friction Course FC-12.5 (Traffic E) (PG 82-22) depth 1.5”.C.      Scope of work at Hotel Plaza Blvd. also includes the removal of existing crosswalks, including concrete header curbs and pavers, and replacement with installation of final colored asphalt patterned pavement. Coordination with resort entrances is required to maintain at least one accessible entrance/exit at each resort throughout construction, with appropriate restrictions and traffic control measures implemented as needed.
Bid Bond: 5.00%

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS