Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

2027 Overhead Sign Structure Replacements

Open
ITB # C007126State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 2027 Overhead Sign Structure Replacement project, managed by the Construction Management Department of the Central Florida Tourism Oversight District, involves the removal and replacement of two overhead spanning sign trusses on eastbound and westbound Epcot Center Drive between Buena Vista Drive and World Drive. The scope further extends to the replacement of ground-mounted and overhead wayfinding signage and foundations across the property, including all necessary area restoration. Technical requirements are governed by the WDW Roadway Signage Style Guide and specific Type E signage specifications, with construction adhering to F-DOT 700 standards and the National Electrical Code 2023. Bidders must be FDOT pre-qualified for Roadway Signing and hold FDEP Erosion Control certification and FDOT Traffic Flagger certifications. The contract requires a 5.00% bid bond, as well as payment and performance bonds. Key deliverables include a milestone schedule and a one-year warranty on labor and materials. Contractors must comply with strict safety protocols, including RCES Underground Construction Rules and Lock Out Tag Out programs, and must demonstrate emergency response capabilities with a two-hour response time. Award is based on the lowest responsive and responsible bidder.

General Info

Replacement of overhead sign structures and wayfinding signage on Epcot Center Drive.

Place of Performance

1900 Hotel Plaza Blvd Lake Buena Vista, Florida 32830, CA, USA

Set-Aside

NONE

Documents

27
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first2 pages · bidder-requirements
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first76 pages · contract-document
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first1 page · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsupporting-document
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstsow
High
PDF, High priority: read this first3 pages · specifications
High
PDF, High priority: read this first10 pages · specifications
High
PDF, High priority: read this first7 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, Low priority1 page · affidavit
Low
PDF, Low priority1 page · form
Low
PDF, Low priorityother
Low
PDF, Low priority3 pages · past-performance
Low
PDF, Low prioritysupporting-document
Low
PDF, Low priorityspecifications
Low

Read all 27 documents

Due in 20 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 20 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 27 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Construction Management Department of Central Florida Tourism Oversight District
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: The 2027 Overhead Sign Structure Replacement includes the removal and replacement of two overhead spanning sign trusses located on eastbound and westbound Epcot Center Drive, between Buena Vista Drive and World Drive.The scope of work also includes removal and replacement of existing overhead and ground mounted wayfinding signage and foundations throughout property including all area restoration.
Bid Bond: 5.00%

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Federal
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting quotes for the North Hollywood Central Remediation Well Collector Line project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, covering site preparation, construction, and finishing services. Key activities include land surveying, site photography, subsurface investigation, tunneling, boring, jacking, micro tunneling, and the installation of utilities and cathodic protection. Additionally, the project requires asphalt paving, concrete drilling, saw cutting, welding services, landscaping, and the provision of materials such as ready mix and precast concrete. Environmental and safety requirements include storm water pollution prevention (SWPPP) and traffic control. This opportunity is set aside for Small Business (SB), SBA certified Women-Owned Small Business (WOSB), and Disadvantaged Business Enterprise (DBE) – Dept of Transportation. To be considered responsive, bidders must possess a valid California Contractor’s license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. Bidders must also demonstrate an ability to foster and maintain labor harmony on the project. Interested firms should contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a response deadline of December 16, 2026.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 21 days
View Details

More opportunities from California → Construction Management Department of Central Florida Tourism Oversight District

Same awarding agency

NAICS: 238160
SLED
Roofing Project - SSA Operations Building
Solicitation # C007073
The SSA Operations Building Roofing Project, managed by the Construction Management Department of the Central Florida Tourism Oversight District, involves the comprehensive removal and replacement of roofing systems at Roof Areas A and B. The scope includes the demolition of existing membranes, insulation, and flashings down to the structural metal deck, followed by the installation of multi-ply modified bitumen roofing, drainage improvements, and the replacement of interior ceilings and lighting. Additionally, the contractor is responsible for the removal and reinstallation of mechanical and electrical equipment, skylight removal, and deck opening infill. The project is scheduled for a total duration of 105 days, with a Notice to Proceed date of January 25, 2027. The contract will be awarded to the responsive and responsible bidder offering the lowest price. Bidders must hold a Florida General or Roofing Contractor license, possess ten years of commercial roofing experience, and provide three references for commercial roofs exceeding 10,000 square feet completed within the last five years. Mandatory requirements include a 5% bid bond, payment and performance bonds, and a project-specific safety plan. Bidders must also certify an emergency response capability of two hours and adhere to strict storm preparation procedures. This solicitation is not set aside for any specific business category.
Roofing Contractors

POSTED

12 days ago

DEADLINE

in 21 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS