Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on January 17, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

24-011 Automated Exit Lanes at Pensacola International Airport

Closed
477State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

Documents

1

Bid No. 24-011: Automated Exit Lanes at Pensacola International Airport

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Pensacola
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → City of Pensacola
Office AddressN/A
Contacts
ADA CoordinatorADA Coordinator

Full Description

Show more
AUTOMATED EXIT LANES SCOPE OF SERVICES  Pensacola International Airport desires to procure two (2), 24-foot long, 3-Door, pedestrian exit lane breach control corridors (ELBC) in accordance with the provided specifications. The project will require the Contractor to provide turnkey installation of the automated exit lanes. In addition to providing the ELBC, the Contractor will be responsible for select drywall removal, raising the header located above the existing automatic sliding doors 5-inches, expanding the door frame opening 8-inches, connecting circuits from the former automatic sliding doors and automatic bifold doors to the ELBC, installing brake metal trim, drywall repair, painting, and other necessary finish work in accordance with the installation plans. Floor tiling to be performed by others will be completed outside the scope of this project. A floor to ceiling wall will be constructed by others outside the scope of this project to protect the construction area. Lockable Swing doors will be provided to the Contractor to allow construction access. The Contractor shall secure the doors via lock and key a copy of which will be held by the Airport while construction is ongoing. When construction is active, the doors must be secured or staffed to prevent inadvertent entry of passengers into the construction area. When construction is not occurring, the door will be secured with a lock and key. No restrictions will be placed on Contractor working hours.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS