Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on November 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26-004 Groundwater Wells 4 & 5

Closed
PE-66241-NONST-2026-000000023State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
IFB No. 134173 Roll-up Door Replacement, Sacramento Okinawa FMS-22
Solicitation # 134173
The California Military Department is soliciting bids under IFB No. 134173 for the removal and replacement of one 19 by 14 foot roll-up door at Okinawa FMS 22 in Sacramento, California. The scope of work includes providing all labor, materials, and equipment to install a new door equipped with a motor, a three-button control station, safety photo eyes, and a manual chain hoist. The project requires the contractor to perform function testing, apply required labeling, and ensure site cleanup. All work must comply with local, state, and federal building codes, as well as CAL-OSHA safety regulations. The prime contractor must possess a type D-28 license for Doors, Gates and Activating Devices. The contract will be awarded to the lowest responsive and responsible bidder, with specific incentives provided for certified Disabled Veteran Business Enterprises (DVBE), Small Businesses, or Microbusinesses. Bids must be submitted as a single PDF via email to [email hidden] by 2:00 PM on November 19, 2026, with the bid opening occurring shortly after at 2:15 PM. The performance period for the project is 180 calendar days, beginning from the date of the job start meeting. Key requirements include the submission of a bid bond, and depending on the final contract value, performance and payment bonds may be required. Invoicing is to be handled electronically in arrears, not more than once a month.
California Military Department

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 238990
New
SLED
27057-A: Kiwanis Park Barrier Netting
Solicitation # 27057-A
Fayette County, Georgia, is soliciting quotes for RFQ 27057-A to provide turnkey, all-inclusive services for the removal of existing netting and the installation of high-impact barrier netting at Kiwanis Park Fields 5 and 6 on Redwine Road. The project requires the contractor to provide all labor, materials, and equipment, ensuring the netting meets Fayette County wind load requirements. The scope includes demolition, installation, site protection, and cleanup, with any ground restoration requiring the use of Bermuda Tiftway 419 sod. Work is scheduled to begin no earlier than November 30, 2026, and must be completed by February 1, 2027, with performance occurring between 8:00 a.m. and 5:00 p.m. on weekdays. Quotes are due by 3:00 p.m. on November 16, 2026, and must be submitted via email or fax to Tamia Carnell. Submissions must include a lump sum price, technical specifications for netting and hardware, a list of three similar project references, and a Contractor Affidavit under O.C.G.A. 13-10-91(b)(1) regarding E-Verify compliance. For contracts exceeding 10,000 dollars, an ethics disclosure regarding relationships with County officials is required. The successful contractor must maintain 1,000,000 dollars in both General and Auto Liability insurance, as well as Worker's Compensation per Georgia statute. Payment terms are Net 30, and the contract is subject to termination if appropriated funds become unavailable.
Fayette County Board of Commissioners

POSTED

about 4 hours ago

DEADLINE

in 18 days

General Info

Place of Performance

Flowery Branch, GA, USA

Set-Aside

NONE

Documents

2

Addendum Number One for Groundwater Wells 4 & 5 Project

PDF, High priority: read this first1 page · amendment
High

City of Flowery Branch Groundwater Wells 4 & 5 Advertisement for Bids

PDF, High priority: read this first2 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Flowery Branch
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The City of Flowery Branch Wells 4 and 5 Project will bring two existing wells online to enhance the City¿s water supply system. The work includes construction of a chemical feed building, installation of new water mains, and reconditioning of the existing wells. Site work will involve traditional development and utility construction within both City right-of-way and property, as well as GDOT rights-of-way, including demolition, grading, drainage, and erosion control. All GDOT encroachments will be properly permitted. Water main extensions will be installed using horizontal directional drilling (HDD) and open-cut trenching methods. Work includes a 4-inch DIP HDD crossing (±114 LF) and abandonment of an existing 2-inch main (±103 LF) within GDOT right-of-way. Approximately 1,400 LF of new 8-inch main will be installed along Railroad Street and Cantrell Road with tie-in to Cemetery Road, and another 1,000 LF of 8-inch main will be added along Vireo Drive. Well head lines will range from 4- to 6-inch DIP and vary in lengths. The chemical feed building will contain separate sodium hypochlorite and fluoride rooms, a pipe gallery, and associated well houses. One 12-inch and one 8-inch well will be reconditioned, tested, and equipped with permanent pumps. All facilities will be enclosed within a secure perimeter fence. This project is approved by the Georgia Environmental Protection Division (EPD). A GDOT Utility Encroachment Permit has been obtained for HDD and waterline abandonment, with modifications pending. The contractor will coordinate and pay applicable fees to Georgia Power for pole relocations and to Atlanta Gas Light for gas service to the auxiliary power supply.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS