This Solicitation opportunity from Texas was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
26-018 RFCSP Junell Center 254 Classroom Conversion
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the renovation of classrooms 254C and 254D in the Junell Center at Angelo State University into a single large tiered-seating classroom, the creation of a smaller multipurpose classroom (254A) equipped with a movable partition that can divide the space into two separate rooms, and the replacement of existing movable partitions on two sides of the computer lab (254B) with permanent walls. All work must adhere to the IFC CD Technical Specifications issued on May 27, 2026, and include complete electrical power distribution systems for all lighting, devices, appliances, and equipment along with associated hardware such as raceways, junction boxes, wiring connectors, and labeling. The project further requires site protection measures, including fencing and tree preservation, a construction kick-off meeting to coordinate logistics and safety protocols, and direct coordination with the university’s IT and networking contractor. The work is subject to strict material handling requirements, mandating that all products be delivered in original factory packaging with full manufacturer labeling, including product density, thermal ratings, VOC content, and application instructions, particularly for paints and insulation, with all labeling compliant with NFPA 70 and 70E standards. The solicitation, numbered 26-018RFCSP, is a Request for Competitive Sealed Proposals with a response deadline of July 2, 2026, and is evaluated on a best-value basis using four weighted factors: proposed cost at 45%, firm and project team qualifications at 25%, commitment to the project schedule at 20%, and RFCSP compliance and quality at 10%. Contractors must submit a detailed Schedule of Values at least 21 days before the first payment request, with overhead, profit, and general conditions clearly separated into distinct line items for labor and materials. Bonds are required — a 5% bid bond for proposals exceeding $25,000, a payment bond equal to the total contract price for contracts over $25,000, and a performance bond equal to the total contract price for contracts over $100,000, all issued by Texas-authorized sureties listed in the U.S. Treasury’s Circular 570. The contractor must also comply with prevailing wage requirements, Title VII of the Civil Rights Act, and make a good faith effort to subcontract with Historically Underutilized Businesses through the VetHUB program, submitting a detailed subcontracting plan
General Info
Agency
NAICS
Place of Performance
TX, USASet-Aside
Timeline
Submission Closed
