Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on June 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26-05 Wri922420D (Wright)

Closed
26-05 Wri922420D (Wright)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
San Vicente and Mt. Olivette Reservoir Improvements Project - Construction
Solicitation # SP2797-CT
The San Vicente and Mt. Olivette Reservoir Improvements Project (SP2797-CT) is a construction solicitation issued by the City of Santa Monica's Public Works Engineering Division. The project involves addressing civil, mechanical, structural, and electrical deficiencies for four water reservoirs located at the Mt. Olivette Reservoir and the San Vicente Reservoir. With a project estimate of $27,344,000, the work requires a contractor holding a Class A General Engineering license. The estimated contract duration is 730 calendar days, although some contract documents reference a term of 520 days from the notice to proceed. Liquidated damages for delays are set at $13,200 per day. Bids must be submitted electronically via the OpenGov Procurement portal, with a final deadline of October 29, 2026, at 3:00 PM PT. Submission requirements include a bid guarantee of at least 10 percent of the bid amount and certification of a mandatory pre-bid job walk. Awarded contractors must provide Labor and Material Payment and Performance Bonds for 100 percent of the contract sum. The scope of work includes strict adherence to local noise ordinances, prevailing wage requirements, and technical specifications for potable water materials and electrical labeling. Performance is subject to inspection by the City and its designated engineers at both the project site and the place of manufacture.
D500 PUBLIC WORKS - ENGINEERING DIVISION

POSTED

about 11 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 18 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

This project involves the construction of a traditional breakpoint nutrient reduction wetland in Wright County, Iowa, with a focus on improving water quality through engineered wetland features. The scope includes selective clearing, excavation, grading, and earthwork totaling approximately 12,950 cubic yards, along with the installation of 932 square feet of steel sheet pile, 2,500 linear feet of tile drainage, 59 linear feet of drawdown pipe, 532 tons of riprap, 106 cubic yards of concrete grout, and 26.3 acres of seeding. A water control structure is also required as part of the system. The project is governed by detailed Plans and Construction Specifications prepared by Andrew Schippers, P.E. of Ducks Unlimited, which dictate design and construction standards. All work must be completed in accordance with these specifications and under the supervision of the Iowa Department of Agriculture and Land Stewardship. The construction must begin no later than 14 days after the preconstruction meeting and is scheduled for completion by June 15, 2027. Seeding is divided into two phases: buffer seeding must be completed by June 30, 2027, and structure seeding by September 15, 2027, with both required to occur within the designated seasonal seeding window. The estimated cost of the project ranges from $450,000 to $550,000, and bids must be submitted electronically through the Iowa Management of Procurement and Contracts System (IMPACS) by 3:00 PM local time on July 16, 2026. Bidders are required to submit a bid bond equal to 10% of their bid amount and, if selected, provide a performance and payment bond equal to 100% of the contract value. All bidders must be registered with the Iowa Department of Inspections, Appeals & Licensing. Questions regarding the technical specifications should be directed to Andrew Schippers, while general contract inquiries should be addressed to Tracy Blocker at the Iowa Department of Agriculture and Land Stewardship in Des Moines.

General Info

Construct traditional nutrient reduction wetland in Iowa with excavation, piling, tile installation, seeding by 2027.

Place of Performance

Wright County, IA, USA

Set-Aside

NONE

Documents

1

Wri922420D Notice to Bidders Nutrient Reduction Wetland Project

PDF, High priority: read this firstnotice-to-bidders
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → Agriculture and Land Stewardship
Contacts1 person available
OfficeDes Moines, IA, 50319, USA
Office AddressDes Moines, IA, 50319, USA

Full Description

Show more
This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile installation, tile installation, water control structure and seeding. This project includes about 12,950 cubic yards of earthwork, installation of 932 square feet of steel sheet pile, water control structure, 2,500 linear feet (LF) of tile installation, 59 LF of drawdown pipe, 532 tons of riprap, 106 cubic yards of concrete grout and 26.3 acres of seeding. The estimated construction cost range for this project is $450,000 to $550,000.
Completion Dates: Construction: June 15, 2027 Seeding: June 30, 2027 (Buffer Seeding must be done within seeding period) September 15, 2027 (Structure Seeding must be done within seeding period)

More opportunities from Iowa → Agriculture and Land Stewardship

Same awarding agency

NAICS: 237110
SLED
26-13 Wor982210D (Worth)
Solicitation # 26-13
The Wor982210D Nutrient Reduction Wetland Project, managed by the Iowa Department of Agriculture and Land Stewardship, involves the construction of East and West wetland systems in Worth County, Iowa. The scope of work includes selective clearing, excavation of approximately 7,500 cubic yards of earthwork, installation of 700 linear feet of pipe, and the placement of 129 tons of riprap. Key infrastructure deliverables include three solar pump systems, two modified SW-512 intake concrete structures, three modified SW-513 outlet concrete structures, and two modified SW-401 and 402 lift station concrete structures, concluding with 2.5 acres of seeding. The estimated construction cost is between $225,000 and $325,000. The contract will be awarded to the lowest responsible bidder, with a bid submission deadline of November 12, 2026. Performance requirements include a 10% bid bond and a performance/payment bond equal to 100% of the contract price, which must remain in place for one year following final acceptance. All work except seeding must be completed by September 1, 2027, with all seeding finalized by December 15, 2027. Project administration includes a 3% retainage on progress payments and requires strict adherence to OSHA safety standards and NRCS specifications. Final acceptance is contingent upon a written certification from the engineer, Bolton & Menk, and the completion of all punch list items.
Water and Sewer Line and Related Structures Construction

POSTED

12 days ago

DEADLINE

in 15 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS