26-055 Port of Pensacola Berth 6 Structural Sustainability Survey
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Contractors are required to conduct a structural sustainability survey of Berth 6 at the Port of Pensacola, focusing on the steel sheet pile bulkhead wall and the reinforced concrete dock structure. The bulkhead, approximately 645 feet long, consists of US Steel MZ 38 sheet piling with a concrete cap and is supported by 126 precast prestressed concrete batter piles anchored near the waterline. The dock is supported by 295 precast prestressed 18-inch square piles. The inspection must cover the entire submerged and exposed structure from the mudline to the top of the superstructure, performed in accordance with the ASCE Waterfront Facilities Inspection and Assessment Manual at Level 1—general visual inspection—unless significant damage necessitates further evaluation. Ultrasonic Testing must be applied to the steel sheet piles at every fifth column line or every 50 feet, measuring thickness at the top, midsection, and bottom. Diving services must be conducted by commercially certified divers holding ADC and FHWA Underwater Bridge Inspection credentials, with video equipment on-site for detailed documentation if needed. Damage assessment must follow ASCE Tables 2-5, 2-6, and 2-7 for rating the condition of the steel pile wall, concrete cap, and prestressed piles respectively. Overall structural ratings for both the bulkhead and dock piling must be assigned per ASCE Table 2-14 on a scale of 1 to 6, where 6 indicates good condition and 1 indicates critical condition. Above-water damage must be photographed and precisely located, and all findings compiled into a comprehensive written report. This work is funded by local Port of Pensacola funds under solicitation number 13612471, with responses due by September 2, 2026, and the contract managed by the City of Pensacola, Florida.
General Info
Agency
NAICS
Place of Performance
222 W. Main St., Pensacola, FL, 32502, USASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Contractors shall commence a structural sustainability survey on Berth 6 Port of Pensacola
Berth 6 consists of a bulkhead wall and cast in place reinforced concrete dock. The bulkhead wall, situated adjacent to and south of Warehouse 6, is constructed of steel sheet piling (US Steel MZ 38) with a concrete cap and extends approximately 645 feet in length. This bulkhead is stabilized with approximately 126 pre-cast pre-stressed concrete batter piles that tie into the concrete cap near the waterline. The concrete dock is supported by approximately 295 pre-cast pre-stressed 18-inch square piling. Refer to the drawings provided for additional information and use in generating inspection documentation.
The inspection to be performed consists of the bulkhead wall (steel sheet piling, battered concrete piling and reinforced concrete cap/wall) and the concrete piling of the dock from the mudline to the bottom of the dock’s superstructure. The bottom of the dock’s superstructure is the top of the bulkhead wall and the top of the piling for the dock. The inspection is to be conducted in conformance with the American Society of Civil Engineers (ASCE) Waterfront Facilities Inspection and Assessment Manual, and the level of the inspection is to be level 1 – general visual inspection, unless damages discovered warrant further inspection. In addition to the level 1 inspection of the bulkhead wall, the thickness of the steel sheet pile shall use Ultrasonic Testing (UT) methods to evaluate the thickness of the steel sheet pile. The UT soundings are to be made at every 5th column line or 50 feet, and the thickness measured at the top, middle (12-15 ft) and bottom (20-25 ft) of the sheet pile. Diving services are to be performed with commercial divers that contain certifications with the Association of Diving Contractors (ADC) and the Federal Highway Administration (FHWA) Underwater Bridge Inspection. Video equipment is to be included on site in case areas are found to need more detailed inspection and reporting based upon the findings of the visual inspection.
The inspection shall be documented with a comprehensive, written report summarizing conditions, location, size and severity of damage. Photographs of damage above the waterline are to be provided and the location noted. Section 2.5, Tables 2-5, 2-6 and 2-7 of the ASCE Manual are to be used for rating the damage of the steel sheet pile wall, reinforced concrete cap/wall and prestressed piling respectively.
Overall condition assessment ratings shall be provided for the bulkhead (steel sheet piling, prestressed concrete piling and reinforced concrete cap/wall) and the dock’s prestressed concrete piling accordance Section 2.6 and Table 2-14 of the ASCE Manual which provides ratings on a scale of 1 to 6. A rating of 6 represents a structure in good condition, whereas a rating of 1 represents a structure in critical condition.
Note: Funding for this activity is provided through the Port of Pensacola local funds.