Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Illinois was posted on February 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

26-557THA-ENGCO-B-51014 | I-25-4768 (I-490) Grading/Drainage Improvements Beeline Dr to Supreme DR MP3.0 to MP4.0

Closed
26-557THA-ENGCO-B-51014State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 4 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 10 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

This contract, designated I-25-4768 (I-490), involves grading and drainage improvements along a segment of the Illinois Tollway from Beeline Drive to Supreme Drive, specifically between mileposts 3.0 and 4.0. Managed by the Illinois State Toll Highway Authority with performance located in Downers Grove, Illinois, the project encompasses earth excavation, structure excavation, installation of concrete end sections, select backfill, erosion and sediment control, dust control watering, and related site grading activities. The scope mandates adherence to IDOT Standard Specifications and Tollway Supplemental Specifications, while enforcing compliance with contract-specific Special Provisions, which include allowances for railroad flagging services and strict insurance, human rights, and funding-related provisions. The multi-item pay schedule outlines extensive excavation and drainage infrastructure work, though actual unit prices and total contract value are not disclosed. The procurement process emphasizes a lowest price technically acceptable (LPTA) award approach, where price competitiveness is paramount but accompanied by mandatory demonstration of good faith efforts to achieve Disadvantaged Business Enterprise (DBE) and Veteran-Owned Small Business (VOSB) participation goals. Bidders must submit comprehensive utilization plans and evidence of outreach, with failure to comply risking bid disqualification. Technical and operational criteria include equipment ownership, material sourcing, subcontractor qualifications, and compliance with reporting and documentation obligations. The work period extends to September 24, 2027, with a contract expiration in 2029 and options for renewal. Contract administration involves electronic bid submissions exclusively through the BidBuy portal, inspection and acceptance at the project site, and detailed recordkeeping to support audit and FOIA compliance. Special contract conditions include a prohibition on contingent fees, a minority contractor opportunity fee, and strict performance and payment bond requirements, underscoring the regulatory and fiscal rigor governing the delivery of this transportation infrastructure improvement.

General Info

Illinois Tollway contract for grading, drainage, excavation from Beeline to Supreme Drive, Downers Grove.

Place of Performance

Central Administration, Downers grove, IL, 60515, USA

Set-Aside

NONE

Documents

9

Addendum 2 to Contract I-25-4768 Illinois State Toll Highway Authority

PDF, High priority: read this firstamendment
High

Addendum 3 to Contract I-25-4768 Illinois State Toll Highway Authority

PDF, High priority: read this firstamendment
High

Contract I-25-4768 Elgin O'Hare Western Access Grading and Drainage Improvements Volume I

PDF, High priority: read this firstrfp
High

CPO Notice 2023.12 Electronic Submission

PDF, High priority: read this firstspecial-notice
High

Illinois Vendor Disclosure Form v26 2-7-22

DOCX, High priority: read this firstvendor-disclosure
High

IPG Active Registered Vendor Disclosure Form

DOCX, High priority: read this firstvendor-disclosure
High

Bid Opening Announcement for Contract I-25-4768

PDF, Low priorityspecial-notice
Low

affidavit-for-illinois-business-bid-preference-v-25-1-2-24-25~22.pdf

PDF

I-25-4768 Addendum1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline added: Mar 19, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIllinois → Construction
Contacts1 person available
OfficeDowners grove, IL, 60515, USA
Organization / AgencyIllinois → Construction
Office AddressDowners grove, IL, 60515, USA
Contacts
Vanessa RamosPurchaser

Full Description

Show more
I-25-4768 (I-490) Grading/Drainage Improvements Beeline Dr to Supreme DR MP3.0 to MP4.0

More opportunities from Illinois → Construction

Same awarding agency

NAICS: 237310
New
SLED
RR-26-2066 Jane Addams Meml Tlwy I-90 Rdwy and Bridge Rehab and Plaza Impr Rock Cut Pk Rd to Genoa R
Solicitation # RR-26-2066
Solicitation RR-26-2066, issued by the Illinois State Toll Highway Authority on October 22, 2026, seeks a contractor for roadway and bridge rehabilitation and plaza improvements on the Jane Addams Memorial Tollway (I-90) between Mile Post 10.3 and Mile Post 25.3 in Winnebago and Boone Counties. The scope of work includes mill and overlay, longitudinal joint repairs, bridge and retaining wall repairs, drainage improvements, pavement marking and signing upgrades, and general earthwork. All work must adhere to the Illinois Department of Transportation Standard Specifications and Illinois Tollway Supplemental Specifications. The project is supervised by a Construction Manager, whose decisions on quality and performance are final, with ultimate dispute resolution handled by the Chief Engineering Officer of the Tollway. The contract will be awarded to the most responsible and responsive bidder based on an award criteria formula consisting of the Base Bid (sum of core work, quality program, and contingency work) minus any applicable Bid Credits. Bidders must provide a bid bond and, upon acceptance, furnish performance and payment bonds. Compliance requirements include meeting a 1.5% Veteran Small Business participation goal and adhering to Disadvantaged Business Enterprise (DBE) goals. Additionally, contractors must comply with Illinois prevailing wage laws, employ at least 90% Illinois laborers during periods of high unemployment, and submit an Equal Employment Opportunity program form within five days of the bid deadline. Bids are due by December 3, 2026, and must include a Vendor Disclosure and a DBE Utilization Plan to be considered responsive.
Highway, Street, and Bridge Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS