This Solicitation opportunity from Florida was posted on October 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Daytona Beach Utilities Department is soliciting bids for the Tomoka Farms Road and Bellevue Avenue Watermain Realignment Project (Solicitation #2701ITB). The scope of work involves the removal of approximately 154 linear feet of existing 12-inch Ductile Iron Pipe and the installation of 218 linear feet of 12-inch PVC and 82 linear feet of 12-inch Ductile Iron Pipe. The project also includes the replacement of water services, meters, and meter boxes along the route, with specific requirements to provide 1-inch services at vacant lot edges to prevent future roadway cutting. All work must adhere to FDOT and City of Daytona Beach standards, including strict sediment control, stormwater management, and ADA compliance for sidewalks. Bids must be submitted exclusively through the OpenGov procurement platform, with a final submission deadline of November 5, 2026, at 3:30 pm. The City will evaluate bidders based on their experience with similar projects and satisfactory references, with a local vendor preference applied per the Daytona Beach Code of Ordinances. The successful contractor is required to provide 100% Performance and Payment Bonds for contracts exceeding $100,000. Key technical requirements include pressure testing all piping after installation and providing final as-built record drawings in AutoCAD and PDF formats. Bids may be held by the City for up to 60 days for qualification reviews prior to the contract award.
General Info
Place of Performance
Set-Aside
Documents
11AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 11 days
- Columbia, SC Major Pipe Rehabilitation GeopolymerOpen now, due in 21 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
The notice title changed.
Response deadline changed from Oct 29, 2026 to Nov 5, 2026.
The notice description changed.
Deadline has passed
Submission Closed
Organization & Contact Information
Interested Companies (56)
See All 56 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
Addendum #1: ADDENDUM #1 - October 14, 2026 - 2701ITB Tomoka Farms Road and Bellvue Avenue Watermain Realignment In response to question #7 - see attached Geotech reports. In response to question #8 - Section 3.1 has been revised to remove the following sentence: "This project will include replacing all water services, water meters, and meter boxes along this route. 1-inch services will also be provided at the edge of the right of way at the vacant lot locations to ensure no open cutting of the roadway for these lots after this project has been completed." Attachments: Tomoka_Farms_Rd_&_ISB_Vousia_Improvements_Geo_Report_ECS_56-1887_SS.pdf, 56-1887-A_Volusia_County_W_ISB_at_Tomoka_Farms_Road_Culvert_SS.pdf
Addendum #2: Addendum #2 - October 22, 2026 - 2701ITB Tomoka Farms Road and Bellvue Avenue Watermain Realignment The City is extending the Question due date from October 22, 2026 at 5:00 pm to October 29, 2026 at 5:00 pm. The City is extending the Bid due date from October 29, 2026 at 3:30 pm to November 5, 2026 at 3:30 pm.
Addendum #3: Addendum #3 - October 22, 2026 - 2701ITB Tomoka Farms Road and Bellvue Avenue Watermain Realignment Pricing proposal was changed as follows: Line 16 Unit of Measure was LF with a Quantity of 1 Line 16 is now Unit of Measure SF with a Quantity of 6,000
Addendum #4: Addendum #4 - October 22, 2026 - 2701ITB Tomoka Farms Road and Bellvue Avenue Watermain Realignment Attachment F - 100-CODB-TOMOKA FARM-BELLEVUE-PLANS-10-22-26 has been added to the project documents. Attachments: Attachment_F_-_100-CODB-TOMOKA_FARM-BELLEVUE-PLANS-10-22-26.pdf
More opportunities from Florida → Utilities Department
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
