273 Detection Upgrade 1 (02-4K150)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation, District 2 – Redding, plans to upgrade vehicle and bicycle detection systems along State Route 273 between Post Miles 5.15 and 5.90 in the City of Anderson, Shasta County, using state funds. The project targets three key intersections—South Street, North Street, and Briggs Street—where current detection systems are outdated or unreliable. At South and North Streets, existing analog video cameras will be removed and replaced with dual-camera IP systems mounted on signal pole luminaire mast arms to provide backup detection, remote monitoring, and vehicle count edge processing. Microwave detection systems will be added for westbound movements at both intersections to enhance reliability, particularly in adverse weather conditions that affect video performance. At Briggs Street, where in-pavement loop detectors lack redundancy, a new two-camera IP system will be installed as a fail-safe alternative. Additional work includes replacing several pull boxes and extending conduits around traffic signal cabinets to support the new infrastructure. The primary goals are to improve signal timing accuracy, reduce false triggers caused by environmental factors like shadows and glare, and ensure continuous operation during equipment failure or construction. Enhanced detection will enable real-time traffic data collection for immediate operational adjustments and long-term planning. All equipment staging and material storage will occur within existing disturbed areas or traffic lanes, with no new borrow or disposal sites required. The contractor is responsible for off-haul of materials. The project involves work outside Caltrans right-of-way, necessitating encroachment and temporary construction permits from the City of Anderson, City of Redding, Shasta County, and Southern Pacific Railroad. No utility work is anticipated, and the effort is being managed under contract 02-4K150 with primary contact Eric L. Rulison, Senior Environmental Scientist at Caltrans District 2.

General Info

Upgrade detection systems at three SR-273 intersections using IP cameras and microwave sensors to improve reliability and traffic data accuracy.

Agency

California → Caltrans, District 2 - Redding

Place of Performance

State Route 273 at South Street, State Route 273 at North Street, State Route 273 at Briggs St, CA, 96007

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 2 - Redding
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 2 - Redding
Office AddressN/A
Contacts
Eric L. RulisonSenior Environmental Scientist

Full Description

Show more
The Department of Transportation proposes using state funds to upgrade traffic systems on State Route (SR) 273 from Post Miles (PM) 5.15 to 5.90 in City of Anderson, Shasta County. The intersections on SR 273 at South Street and North Street have video detection for the approach east of the railroad tracks. Additionally, the intersection of Route 273 and Briggs Street operates on in-pavement loop detectors without alternative backup detection. Video detection cameras have a history of problems detecting bicycle traffic, issues with reliability, and false calls due to environmental factors such as shadows, wind shake, glare, fog, etc. Scope of Work includes: State Route 273 and South Street • Remove existing analogue cameras for the northbound, southbound, and westbound movements east of the railroad tracks; and install a new, 2-camera IP system on signal pole luminaire mast arms (LMAs) as backup detection / remote monitoring / vehicle count edge processing. • Install microwave detection system for westbound movements east of the railroad tracks with sensors on the signal mast arm (SMA) in the southeast quadrant of the intersection. • Replace several existing pull boxes (PBs) and install additional conduits around the existing traffic signal cabinet’s dirt planter area. State Route 273 and North Street • Remove existing analogue camera for the westbound movements east of the railroad tracks and install a new, 2-camera IP system on the signal pole LMA as backup detection / remote monitoring / vehicle count edge processing. • Install microwave detection systems for westbound movements east of the railroad tracks with sensors on the SMA in the southeast quadrant of the intersection. • Replace several existing PBs and install additional conduits around the existing traffic signal cabinet’s dirt planter area. State Route 273 at Briggs Street • Install a new, 2-camera IP system on existing signal pole LMAs as backup detection / remote monitoring / vehicle count edge processing. Purpose and Need The purpose of the project is to improve signal operations, reliability, and maintainability of several traffic signals by upgrading the vehicle and bicycle detection systems. The project is needed because the traffic signals at North and South Street would benefit from improved reliability if the traffic signals were upgraded with modern microwave and video detection systems. Briggs Street will benefit from an alternate video detection system in case of loop failure or construction activities. An upgraded, more accurate detection system allows Caltrans to rapidly upload traffic flow data and evaluate traffic conditions in real time as well as long-term planning. Staging/Stockpiling Parking, staging, and storage of equipment and materials are expected to take place within and outside Caltrans’ right-of-way in previously disturbed areas, as well as within the existing traffic lanes. Disposal/Borrow Sites No material disposal or borrow sites are included. Requirements for material off-haul will be the responsibility of the contractor as described in the project special provisions. Utilities No utility work is anticipated. Right of Way Much of the proposed work is located outside of Caltrans right-of-way. Encroachment permits, and temporary construction permits will be required from the City of Anderson, City of Redding, Shasta County and Southern Pacific Railroad.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil and utility construction services, including underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, shoring, subsurface investigation, and site clearing. Additional requirements include surface improvements like asphalt paving, traffic signals, and landscaping, along with environmental support services such as storm water pollution prevention (SWPPP) and quality control. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must hold a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Certified DBE, MBE, WBE, or OBE firms must provide certification from an approved agency prior to the bid opening. Quotes will be considered from bidders who can maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 14 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 14 hours ago

DEADLINE

in 26 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS