Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

30'' PCCP Sewer Force Main Replacement

Closed
PSUT-26-02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and transportation necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes, concrete structures, and fabricated pipe and fittings. Specialized services required for the project include traffic control, SWPPP, construction survey, electrical work, welding, and preconstruction video. Norstar Plumbing and Engineering, Inc. is acting as the prime contractor and is actively seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The solicitation is categorized under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications for the project are available through the Inland Empire Utilities Agency bidding website. Primary points of contact for outreach and coordination are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 30 minutes
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran-owned, service-disabled veteran-owned, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds equal to the contract price and insurance from companies with an A.M. Best rating of A-VII or better. Technical standards include AWWA Specification C-600 for pipelines and NEMA MG1 for electric motors. Administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payments are processed via applications for payment and become due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is soliciting quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, and surveying. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. This is a union project, and all subcontractors are required to utilize union labor. Potential subcontractors must be capable of providing a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company and must provide their bond rate at the time of bidding for reimbursement. Contracting will be based on Garney Standard Purchase Order and Subcontract documents, and any exceptions to these terms must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 20 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains. Key construction elements include the creation of a new Mountain Avenue Lift Station with a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, FRP enclosures, fire suppression, piping, valves, and electrical and instrumentation. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by October 29, 2025, at 2:00 PM. Filanc has indicated a willingness to assist qualified small business subcontractors with bonding, insurance, credit lines, and materials to facilitate project participation.
Filanc

POSTED

about 1 hour ago

DEADLINE

in 30 minutes

AI Contract Overview

Show more

The City of Pembroke Pines, Florida, is soliciting bids for the replacement of a 30-inch Prestressed Concrete Cylinder Pipe (PCCP) sewer force main, with a estimated contract value between $4.15 million and $4.57 million. The project includes the removal and abandonment of existing 14-inch and 30-inch force mains, installation of new 30-inch DIPS HDPE DR11 pipe and associated fittings, cured-in-place pipe (CIPP) lining of 8-inch vitrified clay pipe, and installation of new 8-inch PVC DR18 pipe with fittings. Work also encompasses mobilization, erosion and sedimentation control, traffic maintenance, and proper disposal of debris, with all materials required to be new, of the highest grade, and conforming to industry standards such as C900 PVC DR18 and 316L schedule 40 piping. Performance is to be completed at various locations within the city, with delivery terms specified as F.O.B. destination, meaning costs and risks are the contractor’s responsibility until the materials are delivered on-site. The contract has a submission deadline of May 26, 2026, at 2:00 PM, with bids to be submitted exclusively via the City’s e-Procurement Portal, and a bid opening scheduled for the same day at 2:30 PM at the City Clerk’s Office. The procurement is governed by comprehensive compliance, insurance, and workforce requirements. Contractors must carry minimum general liability insurance of $1 million per occurrence and $2 million aggregate, naming the City as an additional insured, and must provide proof before work begins. All personnel must be verified using E-Verify, and subcontractors must provide affidavits of compliance. Non-discrimination and affirmative action policies are strictly enforced, with requirements extending to employment, training, and subcontracting practices. The contractor must also comply with HUD Section 3 regulations, which mandate the participation of low- and very low-income individuals in employment, training, and contracting opportunities tied to this federally assisted project. Indemnification obligations are broad, requiring the contractor to defend and hold the City harmless from all claims arising from performance, regardless of insurance limits. Evaluation will be based on the most advantageous bid to the City—not necessarily the lowest—and the award will consider technical merit, experience, and overall value. Submission materials include background information forms, bid bonds or cashier’s checks, and socioeconomic certifications, with vendors required

General Info

Replacement of 30-inch sewer force main in Pembroke Pines, Florida; bid deadline May 26, 2026.

Documents

19

Addendum #1 for RFP PSUT-26-02 30-Inch PCCP Force Main Replacement

PDF, High priority: read this firstamendment
High

City of Pembroke Pines 30-Inch PCCP FM Replacement Bid Schedule Feb 2026

PDF, High priority: read this firstbid-schedule
High

Construction Agreement - City of Pembroke Pines

PDF, High priority: read this first34 pages · contract-document
High

Contractual Services Agreement - City of Pembroke Pines

PDF, High priority: read this first32 pages · contract-document
High

Davis-Bacon Wage Determination FL20250197 for Broward County, FL

PDF, High priority: read this first7 pages · wage-determination
High

Engineering Design Services Agreement - City of Pembroke Pines

PDF, High priority: read this first25 pages · contract-document
High

HUD Section 3 Implementation Plan and Forms

PDF, High priority: read this first8 pages · sow
High

IFB PSUT-26-02 30" PCCP Sewer Force Main Replacement

PDF, High priority: read this firstifb
High

IFB PSUT-26-02 30" PCCP Sewer Force Main Replacement

PDF, High priority: read this firstifb
High

Internal Guidance for Davis-Bacon Wage Decisions

DOCX, High priority: read this first5 pages · wage-determination
High

PSEN-22-01 30-Inch PCCP Force Main Replacement Bid Set

PDF, High priority: read this firstrfb
High

30-Inch PCCP FM Replacement Signage Plan

PDF, Low priorityother
Low

City of Pembroke Pines PSEN 22-01 WO 2 Opinion of Probable Construction Costs

PDF, Low priorityprobable-construction-cost
Low

HUD Davis-Bacon and Labor Standards Contractor Guide Addendum

PDF, Low priority21 pages · other
Low

Sample Insurance Certificate for City of Pembroke Pines

PDF, Low priority1 page · insurance-certificate
Low

Standard Release of Lien - City of Pembroke Pines

PDF, Low priority1 page · release-of-lien
Low

429193-1-52-01_SUE_Final_Deliverable.pdf

PDF

City_of_Pembroke_Pines_30-Inch_PCCP_FM_Replacement_Project_Specifications_Nov_2025.pdf

PDF

Geotechnical_Report_(UES)_24.08.15.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 2, 2026 to May 26, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Utilities
Contacts2 people available
OfficePembroke Pines, FL, 33025, USA
Organization / AgencyFlorida → Utilities
Office AddressPembroke Pines, FL, 33025, USA
Contacts
Laura EusseProject Manager
Daniel DeleonProcurement Specialist

Interested Companies (68)

Metro Equipment ServiceMiami, FL
B&B Underground and DrillingLake Helen, FL
EllingsonWest Concord, MN

See All 68 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Pembroke Pines, Florida, ranked as the eleventh largest city among the state's four hundred plus municipalities and the second largest in Broward County, maintains a welcoming small-town ambiance that resonates with its residents. Located conveniently in southwest Broward County, the city provides seamless access to major highways, employment centers, entertainment venues, parks, golf courses, and a diverse array of dining and shopping options. With a population of approximately 170,000 residents spread across 32.68 square miles, Pembroke Pines is renowned as one of the best cities to live in America. The city boasts 28 superior parks, lush landscaping, and a distinctive South Florida charm that contributes to its natural beauty. Notably recognized as 2024's Best Place to Raise a Family in Florida, and 2024's Best City of Hispanic Entrepreneurs by WalletHub, Pembroke Pines also earned a place as the on Money Magazine's esteemed Best Places to Live list in 2014, as the sole Florida representative, ranking in at #32 in the nation. Incorporated in 1960, Pembroke Pines is celebrated as a safe and desirable community, having received accolades such as the All-America City designation. The city's commitment to arts and culture, exceptional schools, diverse population, numerous parks, and forward-thinking approach in an ever-evolving world make it a standout destination. Pembroke Pines is also the home to the largest municipal-run charter school system in the nation, serving over 6,000 students across five separate campuses. The City's award-winning charter school system is located in the Broward County School District, which is the sixth largest school district in the nation.

More opportunities from Florida → Utilities

Same awarding agency

NAICS: 237110
SLED
Replacement of Water Service Lines (Age and/or Emergency)
Solicitation # 26-T01417
Hernando County Utilities is soliciting bids for a term contract under solicitation number 26-T01417 for the replacement of water service lines due to age or emergency conditions. The project requires a licensed underground and excavation contractor registered in the State of Florida to provide all labor, materials, and equipment for the installation of 1-inch and 2-inch long side and short side water services using open cut and trenchless methods. Key technical requirements include the installation of corporation stops, service tubing, TPS T3 service saddles, and TPS Quick-Cam repair clamps, as well as comprehensive roadway restoration involving asphalt milling, concrete replacement, and full depth lime rock backfill. The estimated annual budget for these services is 1 million dollars. Bids must be submitted via the County eProcurement Portal by November 9, 2026, at 10:00 a.m. local time. Evaluation is based on price, completeness, compliance, and the bidder's resources, with a price preference of up to 5 percent available for local vendors. Performance is required within 14 calendar days of receiving a purchase order, and contractors must provide pre-construction audio-video documentation and passing density tests for roadway backfill prior to payment. For projects valued at 250,000 dollars or more, both performance and payment bonds are required. Payments are made via ACH within 45 days of invoice submission.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS