This project involves the removal of an existing 6 inch water line and the installation of a new 443 linear foot 6 inch water line, including two valves and two fire hydrant assemblies, along with a 298 linear foot 12 inch storm sewer featuring three catch basins. Located on Washington Street between Marshall and Shinkle Streets in the City of Findlay, Ohio, the scope of work encompasses all labor, equipment, traffic control, excavation, material disposal, and pavement restoration. The contractor must ensure all manholes meet specific engineering tolerances for stability and grade, while prioritizing the maintenance of traffic and access for local businesses and residents. The project is funded by City of Findlay local funds and is subject to City Income Tax collection, State prevailing wages, Equal Employment Opportunity requirements, and domestic steel use regulations per the Ohio Revised Code. Bidders should refer to the Supplemental Specifications and Pay Item Descriptions for detailed pay limits and requirements. The engineer's estimate for the project is 171,830.00 dollars, with a final completion deadline of July 2, 2027.
General Info
Place of Performance
OH, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
The work also includes all labor, equipment, traffic control, pavement saw cutting, incidental excavation, disposal of removed materials, pavement restoration immediately surrounding the structures, and all other work necessary to complete the adjustments. Upon completion, all manholes shall provide a smooth riding surface, be free from movement or rocking, and meet the required line and grade tolerances established by the Engineer.
Bidders are advised to pay close attention to the specific details of the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items.
During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders shall be aware of any required Equal Employment Opportunity requirements as well as the State prevailing wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction.
FINAL COMPLETION DATE: July 2, 2027
ENGINEER’S ESTIMATE: $ 171,830.00
Similar Contracts
Same NAICS industry code
More opportunities from Ohio → City of Findlay
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS