35664600
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This project for the City of Findlay involves the removal of a 12 inch water line and a 15 inch sanitary line from an existing 36 inch storm sewer. The scope of work includes lowering the water line by approximately 5 feet and replacing two manholes with new structures positioned 3 feet lower than the originals. A new 408 linear foot 18 inch sanitary sewer will be installed beneath the storm sewer, along with an additional 58 linear foot section to connect to the southeast existing pipe. The contractor is responsible for all labor, equipment, traffic control, excavation, material disposal, and pavement restoration, ensuring all manholes meet engineering tolerances for stability and surface smoothness. The contract is funded by City of Findlay local funds with an engineer's estimate of 185,320 dollars and a final completion date of May 28, 2027. Bidders must comply with State prevailing wages, Equal Employment Opportunity requirements, and domestic steel use regulations per the Ohio Revised Code. Maintenance of traffic and access for local businesses and residents are primary concerns during construction. The project is located within the City of Findlay corporation limits and is subject to City Income Tax collection.
General Info
Place of Performance
OH, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
The work also includes all labor, equipment, traffic control, pavement saw cutting, incidental excavation, disposal of removed materials, pavement restoration immediately surrounding the structures, and all other work necessary to complete the adjustments. Upon completion, all manholes shall provide a smooth riding surface, be free from movement or rocking, and meet the required line and grade tolerances established by the Engineer.
Bidders are advised to pay close attention to the specific details of the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items.
During construction, maintenance of traffic and access to local businesses and residences will be major concerns for the City, Contractor, and adjacent property owners.
This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by City of Findlay local funds. Bidders shall be aware of any required Equal Employment Opportunity requirements as well as the State prevailing wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction.
Specific Notes: 1. Rock Elevation: 781.00’ +/- 2. Remove 12” Water line and 15” Sanitary Sewer from existing 36” Storm Sewer including existing vaults, Reestablish flow in 36” RCP.
FINAL COMPLETION DATE: May 28, 2027
ENGINEER’S ESTIMATE: $ 185,320
Similar Contracts
Same NAICS industry code
More opportunities from Ohio → City of Findlay
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
