Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 20, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

38--North Coast Mechanical Dredging

Awarded
W9127N08B0010Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for contract 9585, project 13863, to perform the Castle Creek Channel Improvements at Warner Park in Dane County, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening the channel from Sherman Avenue to Warner Lagoon, implementing storm sewer improvements, and performing native plant restoration. The project includes the potential removal, salvage, and reinstallation of existing bridges following final grading and riprap placement. Contractors must adhere to various environmental permits, including authorizations from the US Army Corps of Engineers, the WDNR for hydrologic restoration and storm water construction, and the City of Madison for erosion control. Bidders must be prequalified, specifically in category 246 for Ecological Restoration, or utilize a prequalified subcontractor for related work items. The contract is designated as a Best Value Contract for multi-trade bids equal to or greater than 386,500 dollars. A 5 percent bid bond is required, and the project carries a Small Business Enterprise goal of 12 percent. Awardees must provide payment and performance bonds and comply with the City of Madison Affirmative Action Ordinance. Performance is subject to strict quality standards, including a one-year guarantee on seeded areas and compliance with Wind Sock Standards for erosion control. Failure to comply with specific contract articles may result in liquidated damages of 0.5 percent of the award price per week, capped at 5 percent or 10,000 dollars. Grant funds for the project are administered on a reimbursement basis.
City of Madison

POSTED

about 3 hours ago

DEADLINE

in 2 days
NAICS: 237990
New
SLED
Ashley River Scenic Blue Trail Obstruction Clearing
Solicitation # 2027-09
Dorchester County is soliciting bids for the Ashley River Scenic Blue Trail Obstruction Clearing project to restore safe motorized recreational navigation along a four to five mile segment of the river. The scope of work involves removing, cutting, and repositioning woody debris and natural obstructions between Ashley River Park at Bacons Bridge Road and Highway 17A, establishing a continuous navigable passage with a minimum clear width of 25 feet. The project must be performed in accordance with SCDNR Best Management Practices and requires substantial completion within 180 calendar days of the Notice to Proceed, with final completion due 30 days thereafter. The contract will be awarded to the lowest responsive and responsible bidder. Evaluation is based on the total price of consecutive navigation clearing segments starting with Segment A, estimated quantities for contractor and county haul, and a fixed disposal fee allowance of 5,000 dollars. Bidders must provide a Project Manager or Superintendent with at least three years of experience in marine waterway clearing. Bids are due electronically via the OpenGov portal by November 5, 2026, at 2:00 PM. Any bid exceeding 25,000 dollars requires a bid bond of at least five percent of the total bid amount. Compliance with several federal and state regulations is mandatory, including FHWA-1273 contract provisions, the Davis-Bacon and Related Act, the South Carolina Drug-free Workplace Act, and Title VI of the Civil Rights Act of 1964. All contractors and subcontractors must be registered in the federal System for Award Management (SAM). Payment terms are set at 30 days from the date of approved invoices, with specific requirements for itemizing South Carolina sales and use tax. The County's Purchasing Services Manager maintains the authority to modify or terminate the contract for convenience or due to non-appropriation of funds.
Purchasing Services Division

POSTED

about 4 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The Portland District Corps of Engineers is seeking a contractor for the North Coast Mechanical Dredging 2008 project, which involves maintenance dredging of approximately 60,000 cubic yards at Baker Bay and Chinook Channel along the Washington State side of the lower Columbia River. The work includes in water disposal and is scheduled to take place between September 1, 2008, and October 31, 2008. The estimated magnitude of construction for this project is between 500,000 and 1,000,000 dollars. This unrestricted procurement is open to both small and large business concerns, with a small business size standard of 18.5 million dollars for dredging. A key requirement for the project is the appointment of a Site Safety and Health Officer who must possess at least three years of relevant safety experience and a 30 Hour OSHA construction safety certification completed within the last three years. Administrative and technical inquiries are directed to Cha Cha Gillett and Courtney Jones, respectively.

General Info

Contract Value

$2,246,978.8

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Portland District, US Army Corps of Engineers Contracting Division (CENWP-CT_, P.O. Box 2946 Portland OR 97208-2946 US, OR, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Jul 17, 2008 to Aug 6, 2008. The notice description changed.

Deadline changed

Response deadline changed from Aug 6, 2008 to Aug 19, 2008.

Deadline changed

Response deadline changed from Aug 19, 2008 to Aug 22, 2008.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Portland
ContactsNo contacts available
OfficePORTLAND, OR, 97204-3495, USA
Office AddressPORTLAND, OR, 97204-3495, USA
ContactsNo contact information available

Full Description

Show more
North Coast Mechanical Dredging - 2008 Synopsis The Portland District Corps of Engineers intends to award a contract for North Coast Mechanical Dredging 2008. This dredging project includes maintenance dredging of two port locations along the Washington State side of the lower Columbia River at Baker Bay and Chinook Channel. The project consists of dredging an estimated 60,000 cubic yards with in water disposal. Dredging will take place between 01 September 2008 and 31 October 2008. For this project, the person that will act as the SSHO is required to have a minimum of 3 years safety work with similar projects and a 30 Hour OSHA construction safety class, or equivalent, taken within the last 3 years. The SSHO may have other duties for this work that include being the Contractor on-site Project Manager and/or the on-site CQC Manager or other responsible individual. Administrative point of contact is Cha Cha Gillett, phone: +1 (555) 000-0000, email contact@example.gov. Technical point of contact is Courtney Jones, phone: +1 (555) 000-0000, email: contact@example.gov. Magnitude of Construction is between $500,000.00 and $1,000,000.00. This procurement is unrestricted and open to small and large business concerns. The small business size standard is $18,500,000.00 for dredging. The Solicitation Package (technical data package) will be available for download from FBO www.fbo.gov on or about 17 June 2008 with bids due 30 days after issuance.

More opportunities from Department Of Defense → W071 Endist Portland

Same awarding agency

NAICS: 238220
New
Federal
John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007)
Solicitation # W9127N27BA007
Solicitation W9127N27BA007 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, Portland District, for comprehensive HVAC upgrades at the John Day Dam Powerhouse in Rufus, Oregon. The project scope involves replacing failing automation and non-compliant systems with a modern automated HVAC control system, including the installation of four skid units totaling approximately 600 tons of refrigeration, new distributing ducting, roof-mounted air-cooled condensers, and substantial fire protection upgrades. The work is divided into several line items, including mobilization, rehabilitation of dry and wet side HVAC systems, monitoring and control systems, seasonal testing and balancing, and asbestos survey and abatement. The overall period of performance is 1,004 calendar days from the date of the Notice to Proceed, with approximately 5 million dollars currently available for payment. Interested offerors must be registered in PIEE and provide their CAGE Code and CMMC Unique Identifier to access restricted Controlled Unclassified Information (CUI) drawing packages. Bids are due by December 28, 2026, and will be evaluated with a 10 percent price preference for HUBZone small business concerns. The contract mandates strict adherence to cybersecurity standards per DoD Instructions 8500.01 and 8510.01, as well as compliance with the Buy American Requirement-Construction and prevailing wage laws. Final acceptance is contingent upon a formal inspection involving the Contracting Officer and the contractor's quality control personnel, with electrical systems requiring independent testing according to NETA ATS 2025 standards.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

4 days ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS