Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on August 19, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Island Lake Campground Reconstruction

Closed
AG-82X9-S-08-0260Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for contract 9585, project 13863, to perform the Castle Creek Channel Improvements at Warner Park in Dane County, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening the channel from Sherman Avenue to Warner Lagoon, implementing storm sewer improvements, and performing native plant restoration. The project includes the potential removal, salvage, and reinstallation of existing bridges following final grading and riprap placement. Contractors must adhere to various environmental permits, including authorizations from the US Army Corps of Engineers, the WDNR for hydrologic restoration and storm water construction, and the City of Madison for erosion control. Bidders must be prequalified, specifically in category 246 for Ecological Restoration, or utilize a prequalified subcontractor for related work items. The contract is designated as a Best Value Contract for multi-trade bids equal to or greater than 386,500 dollars. A 5 percent bid bond is required, and the project carries a Small Business Enterprise goal of 12 percent. Awardees must provide payment and performance bonds and comply with the City of Madison Affirmative Action Ordinance. Performance is subject to strict quality standards, including a one-year guarantee on seeded areas and compliance with Wind Sock Standards for erosion control. Failure to comply with specific contract articles may result in liquidated damages of 0.5 percent of the award price per week, capped at 5 percent or 10,000 dollars. Grant funds for the project are administered on a reimbursement basis.
City of Madison

POSTED

about 4 hours ago

DEADLINE

in 2 days
NAICS: 237990
New
SLED
Ashley River Scenic Blue Trail Obstruction Clearing
Solicitation # 2027-09
Dorchester County is soliciting bids for the Ashley River Scenic Blue Trail Obstruction Clearing project to restore safe motorized recreational navigation along a four to five mile segment of the river. The scope of work involves removing, cutting, and repositioning woody debris and natural obstructions between Ashley River Park at Bacons Bridge Road and Highway 17A, establishing a continuous navigable passage with a minimum clear width of 25 feet. The project must be performed in accordance with SCDNR Best Management Practices and requires substantial completion within 180 calendar days of the Notice to Proceed, with final completion due 30 days thereafter. The contract will be awarded to the lowest responsive and responsible bidder. Evaluation is based on the total price of consecutive navigation clearing segments starting with Segment A, estimated quantities for contractor and county haul, and a fixed disposal fee allowance of 5,000 dollars. Bidders must provide a Project Manager or Superintendent with at least three years of experience in marine waterway clearing. Bids are due electronically via the OpenGov portal by November 5, 2026, at 2:00 PM. Any bid exceeding 25,000 dollars requires a bid bond of at least five percent of the total bid amount. Compliance with several federal and state regulations is mandatory, including FHWA-1273 contract provisions, the Davis-Bacon and Related Act, the South Carolina Drug-free Workplace Act, and Title VI of the Civil Rights Act of 1964. All contractors and subcontractors must be registered in the federal System for Award Management (SAM). Payment terms are set at 30 days from the date of approved invoices, with specific requirements for itemizing South Carolina sales and use tax. The County's Purchasing Services Manager maintains the authority to modify or terminate the contract for convenience or due to non-appropriation of funds.
Purchasing Services Division

POSTED

about 5 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The Island Lake Campground Reconstruction project, solicitation number AG-82X9-S-08-0260, is a total small business set-aside contract issued by the USDA Forest Service Rocky Mountain Regional Office. Located in Cedaredge, Colorado, within the Grand Valley Ranger District, the project involves the comprehensive reconstruction of the Island Lake Recreation Area, encompassing the Island Lake Campground, Island Lake Day Use area, and Little Bear Campground. The base bid scope includes extensive site work such as clearing, grubbing, and the construction of aggregate roads, spurs, and trails. Key infrastructure improvements involve the reconstruction of camp units with timber borders and rock retaining walls, the installation of a fee station, and the complete overhaul of the water system, which includes a new treatment building, waterlines, and hydrants. Additionally, the project requires electrical upgrades to the treatment building and host units, as well as the installation of a host sewage holding tank and the demolition of an existing septic tank. The contract is estimated to be valued between 500,000 and 1,000,000 dollars with a mandatory performance period of 120 calendar days. Optional bid items include the installation of recreational vehicle electric pedestals, the extension of waterlines to the Little Bear Campground and its flush toilet, and the construction of 14 additional campground spurs. Technical requirements are governed by detailed site plans and specifications covering electrical schematics, plumbing, and roadway cross sections. Bidders are required to provide performance and payment bonds, with all work adhering to the specific design standards for the Grand Valley Ranger District.

General Info

USDA Forest Service contract for Island Lake Campground reconstruction in Colorado, valued up to $1M.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

This project is located approximately 20 miles north of the town of Cedaredge, Colorado on the Grand Valley Ranger District of , CEDAREDGE, CO, 81413, USA

Set-Aside

SBA

Documents

8
PDF, High priority: read this first4 pages · specifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first177 pages · specifications
High
PDF, High priority: read this first18 pages · specifications
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Rocky Mountain Regional Office
Contacts1 person available
OfficeLAKEWOOD, CO, 80401, USA
Office AddressLAKEWOOD, CO, 80401, USA

Full Description

Show more
Work for this project consists of furnishing labor and equipment for the reconstruction of the Island Lake Recreation Area which consists of: Island Lake Campground, Island Lake Day Use and Little Bear Campground. Items of work in the base bid include (but not limited to) are: Clearing, grubbing, and stump removal; Obliteration of roadways and relocation of barrier rocks; Construction staking and quality control; Construction Closure Signs; Constructing the aggregate main campground roads, spurs, and trails associated with units in the base bid (1-5), (7-9), (13), (14), (18-24), (26-28), (31), (33), (35), (37); Replacing/installing culverts and drainage ditches; Host unit improvements; Fee station with bulletin board; Installing government furnished entrance sign posts, Reconstruction of all camp units and construction of new camp units including aggregate surfaced impact areas, timber borders, steps, rock retaining walls, site boulders, number posts, and site furnishings; concrete dumpster pad; and Coordination and installation of government furnished items, including concrete wheelstops, fire rings and rock for retaining walls. Work also includes reconstruction of the water system that serves Island Lake Campground, Island Lake Day Use Area and Little Bear Campground. This includes; a new treatment building, waterlines, drains, valves, a spillway crossing, asphalt patching and hydrants. Install one host sewage holding tank at Island Lake CG and demolish the existing flush toilet septic tank. The electrical system work includes: relocating and installing panels to the new treatment building, base power to the Island Lake CG Host and Well/Treatment Building, and relocating a power pole in the Island Lake CG group loop. B. Optional Bid Items include (but not limited to) are: Furnishing and installation of three recreational vehicle electric pedestals at Units #2, #3 and #5 with powerlines, Constructing the waterline with valves and hydrants from Island Lake Day Use Area to Little Bear Campground, Constructing the waterline with valves and hydrants from the Little Bear Campground Host Unit to the existing Little Bear CG flush toilet, and last unit by unit construction of 14 Island Lake Campground spurs. pull-thrus, use pads and tent pads. All work associated with constructing these optional units is included in each of these bid items.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS