408319 Dozier's Corner Pump Station Repl (AT015400)

Active
DBB-127650State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hampton Roads Sanitation District is soliciting bids for the replacement of the Dozier's Corner Pump Station located at 1109 Keats Street in Chesapeake, Virginia. The scope of work includes the installation of two 25-HP submersible solids handling pumps and a permanent natural gas bypass pump, along with the installation of approximately 720 linear feet of 10-inch HDPE force main. Additional requirements involve replacing a triple culvert with a precast box culvert, rehabilitating two manholes and associated piping, and the demolition of the existing station. Contractors must utilize a temporary ingress and egress easement through an adjacent cemetery, ensuring that access remains clear for visitors and employees throughout the project. All responses must be submitted via the HRSD Online Oracle ERP system by the deadline of October 20, 2026, as submissions through eVA will not be accepted.

General Info

HRSD seeks bids for Dozier's Corner Pump Station replacement in Chesapeake by October 2026.

Agency

Virginia → Hampton Roads Sanitation DistrictView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Chesapeake, VA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Hampton Roads Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
Virginia → Hampton Roads Sanitation District
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
The Project or Work consists of construction of a replacement pump station to include two (2) 25-HP submersible solids handling pumps and a permanent natural gas bypass pump, force main tie-in with approximately 720 linear feet of new 10-inch HDPE force main, appurtenances, drainage work including replacement of the existing triple culvert with a new precast box culvert, pipe and two (2) manhole rehabilitations, and the demolition of the existing Dozier’s Corner Pump Station at 1109 Keats Street in Chesapeake. Access to the project site will be through a temporary ingress/egress easement through the adjacent cemetery property. Clear access must be maintained along the easement area for cemetery visitors and employees. Coordination with the cemetery may be required throughout the project duration.
*NOTE: Do not respond through eVA. HRSD only accepts responses submitted online through HRSD's Online Oracle ERP system. Detailed information about this solicitation (including specifications and/or any addenda) is available through HRSD's Online Oracle ERP system. To register or log into HRSD's Online Oracle ERP system, please visit: https://www.hrsd.com/procurement.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and painting. Electrical work and the supply of various piping materials, such as ductile iron, PVC, and stainless steel, are also required. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected electronic system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed through the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, making it subject to American Iron and Steel (AIS) provisions, the Davis-Bacon Related Acts, and DBE Program requirements. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100% of their contract value, with bond premiums reimbursed by Kiewit. The solicitation specifically encourages participation from certified DBE, MBE, WBE, and other small business enterprises, requiring evidence of certification from recognized agencies such as the US EPA, SBA, or CA DOT.
Kiewit Infrastructure West Co.

POSTED

about 16 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. Located in Haleiwa, Oahu, Hawaii, the scope of work involves maintenance dredging of approximately 4,260 cubic yards with ocean disposal south of Oahu, vegetation clearance, and repairs to the revetted mole, including stone rework and filling voids. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This solicitation is set aside for small businesses, including SDB, WOSB, HUBZone, VOSB, and SDVOSB concerns, with a specific price evaluation preference for HUBZone small businesses. Bids must be submitted as sealed physical envelopes by September 30, 2026, as electronic submissions are not permitted. Key requirements for a responsive bid include active SAM registration, a bid guarantee, and the submission of SF 1442. The contractor must provide key personnel, including a Project Manager and Site Safety and Health Officer, and adhere to Davis-Bacon Act wage requirements. Acceptance of the dredging work is based on pre- and post-dredge multi-beam hydrographic surveys conducted by a third-party qualified surveyor. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 16 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237990
New
Federal
Virtual Industry Day for FY27 USACE National Dredging Procurement Strategies
Solicitation # W912PM27DREDG
The USACE National Dredging Center is hosting a Virtual Industry Day on September 9, 2026, to discuss three planned national contract acquisition strategies for FY27. The first strategy involves Hopper Contracts, where maintenance dredging and beach renourishment projects will be awarded as consolidated packages. The second strategy, Scope Dredge to Budget, focuses on the Galveston/Houston Area of Responsibility and utilizes a two-phase selection process. Phase One involves a technical qualifications-based evaluation of bonding capacity, past performance, and proposed plant, leading to a down-select of up to five offerors. Phase Two will then use a best-value determination based on channel maintenance duration, beneficial use of material, schedule, and management approach. This strategy covers various Texas harbors and waterways, including the Houston Ship Channel and Corpus Christi Ship Channel. The third strategy is a National Small Business Multiple Award Task Order Contract (MATOC) for recurring and emergency dredging requirements across the United States. This five-year contract will cover activities such as maintenance and new work dredging, material placement, and facility maintenance. To qualify, offerors must provide documentation for owned dredges meeting specific minimum requirements, such as a cutter suction dredge with at least a 10-inch discharge diameter or a mechanical dredge with at least a 5 cubic yard bucket. Evaluation factors for the MATOC include technical capability and three examples of relevant past performance from the last six years. Interested parties must RSVP by 10 AM ET on September 8, 2026.
W074 Endist Wilmington

POSTED

about 20 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah
Solicitation # 1240LT26Q0106
Solicitation 1240LT26Q0106 is a request for quotation for the Kent’s Lake Campground Reconstruction Project in the Fishlake National Forest, Utah, as part of the Great American Outdoors Act program. This total small business set-aside under NAICS 237990 has an estimated value between 1 million and 5 million dollars. The project focuses on restoring the natural environment while updating facilities to support modern vehicle requirements and increased recreational use. The scope of work includes the demolition of existing structures, installation of concrete sidewalks, stairs, and pads, construction of 29 family units with picnic tables and fire rings, and improvements to water, sewer, roadway, and drainage infrastructure. The contractor must begin work within 10 calendar days of the notice to proceed and complete all work, including final cleanup, within 195 calendar days. The government will award a firm fixed price contract based on the lowest price technically acceptable criteria. To be considered responsive, offerors must submit a signed SF1442, a price proposal schedule of items, a technical proposal detailing their approach and resources, and a past performance record featuring three similar projects completed within the last three years. The project is subject to Davis-Bacon wage determinations and requires bid guarantees, performance bonds, and payment bonds. Key compliance requirements include adherence to a strict fire plan, ADA accessibility for tables, and specific quality standards for signage and concrete. Proposals are due by September 23, 2026, at 3:00 PM Mountain Time.
USDA Forest Service

POSTED

about 20 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Virginia → Hampton Roads Sanitation District

Same awarding agency