Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on August 20, 2007. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

44 -- Roller Hearth Furnace

Closed
FA9200-07-M-0285Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333994
New
SLED
Purchase of Walk-in Ovens
Solicitation # F2027038
Tarrant County is soliciting bids for the replacement of three commercial ovens at the Lon Evans Corrections Center under solicitation number F2027038. The project requires the awarded vendor to provide all labor and materials for the uninstallation and removal of existing equipment and the installation of three new double rack rotating ovens. To be eligible for award, bidders must bid on all items and meet strict technical specifications, including the use of a 275k BTU gas system, a Type I hood with UL 710 listed grease filters, compliance with NFPA-96 requirements, and the inclusion of a prison security package. The contract will be awarded to the lowest bidder meeting these specifications. Bidders must submit detailed product specifications, warranty information, and electrical and gas system requirements, ensuring all delivery, labor, travel, and freight costs are included in the installation pricing. The response deadline is November 30, 2026. Tarrant County adheres to a HUB policy for disadvantaged business enterprises and requires that bidders do not owe delinquent property taxes within the county. Payment is typically issued within thirty days of receiving the invoice or items, and the county maintains audit rights for twelve months following final payment. Additionally, vendors must comply with data security standards and may be subject to criminal background checks for personnel accessing secure facilities.
Tarrant County

POSTED

4 days ago

DEADLINE

in about 1 month
NAICS: 333994
New
DIBBS
CARTRIDGE, DEHYDRATOR
Solicitation # SPE8E8-27-T-0203
Solicitation SPE8E8-27-T-0203 is a request for the procurement of 21 dehydrator cartridges, identified by NSN 4440-01-582-6344 and part number 657-400-001 from Compass Instruments Inc. The items are designated as Type 2 Code 9 with an extendable shelf life of 60 months. Delivery is required within 29 days of award, with a need ship date of November 25, 2026, and a final required delivery date of November 30, 2026. The shipment is FOB Origin and will be delivered to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. Inspection and acceptance will occur at the destination. The contract mandates strict adherence to MIL-STD-2073-1E for packaging, RP001 for palletization, and MIL-STD-129 for marking. Technical and quality requirements are governed by the DLA Master List, including specific provisions for source approval requests and the removal of government identification from non-accepted supplies. All quotes must be submitted via the DIBBS portal by October 26, 2026. The award process may be automated, and the government will not evaluate offers utilizing additive manufacturing. Key regulatory compliance includes the Buy American Act, the Berry Amendment, and various FAR/DFARS clauses regarding cybersecurity, human trafficking, and telecommunications equipment. Invoicing must be processed electronically through the Wide Area WorkFlow system.
DDSP NEW CUMBERLAND FACILITY

POSTED

6 days ago

DEADLINE

in 6 days
NAICS: 333994
New
DIBBS
AUTO-CLAVE UPGRADE
Solicitation # SPE4A8-27-Q-0003
Solicitation SPE4A8-27-Q-0003 is a request for a firm-fixed-price contract issued by the Defense Logistics Agency Weapons Support for the upgrade of a medium Thermal Equipment Corporation composite autoclave system located at Fleet Readiness Center East in MCAS Cherry Point, North Carolina. The scope of work includes the replacement of the combustible heating system, vacuum receivers, vacuum control valves, and the Motor Control Center. Additionally, the contractor must replace the hoist scissor-lift bridge system and locking mechanisms, provide a new self-contained Hydraulic Power Unit, and upgrade the Human-Machine Interface to a Windows 11 computer with a color inkjet printer. The project requires the delivery of a Plan of Action and Milestones within 30 days of award, an Acceptance Test Plan, and comprehensive technical manuals. The performance period for the upgrade, installation, and associated deliverables is 365 days after receipt of order, with inspection and acceptance occurring at the destination. Offerors are evaluated based on technical acceptability, past performance from the last five years, and price reasonableness. Technical submissions must include a compliance statement using Exceeds, Comply, or Exception To designations, along with descriptive literature and price support. The contractor is responsible for all rigging, installation, and adherence to strict safety standards, including OSHA, EM 385-1-1, and specific Naval Ordnance Safety and Security Activity requirements for lightning protection systems. All identification marking must comply with MIL-STD-130N, and the resulting PLC ladder logic program will become the property of the government.
Defense Logistics Agency

POSTED

6 days ago

DEADLINE

in about 1 month

General Info

Agency

N/A

NAICS

333994 - Industrial Process Furnace and Oven Manufacturing

Place of Performance

1521 Test Track RoadHolloman AFB New Mexico 88330

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Elesha J. GentryContract Specialist

Full Description

Show more
The Air Armament Center, Eglin AFB FL, intends to solicit and award a sole source firm-fixed price contract for a Roller Hearth Furnace and Temperature Control System to Thermcraft Incorporated of Winston-Salem NC under the authority of FAR 6.302-1(a)(2). Anticipated award date is 28 Aug 2007. This requirement is for: CLIN 0001 (1 EA) Roller Hearth Furnace Model Number FRL-50-48-96-1F in accordance with attached specifications.. These items must be delivered to: 846TH Test Group, 1521 Test Track Road, Holloman AFB NM 88330 no later than 16 weeks after receipt of order on an FOB Destination basis. The North American Industry Classification System (NAICS) for this acquisition is 333994, small business size standard: 500 employees. Interested parties may identify their interest and capability to respond to the requirement. This notice is not a request for competitive proposals/quotes. However, the Government will consider all responses received within 5 days of publication. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Questions shall be submitted electronically to elesha.gentry@46tg.af.mil. Note 22 applies. Point of Contact: Elesha Gentry, Contract Specialist, Phone 505-679-3305, Fax 505-679-3378, email: elesha.gentry@46tg.af.mil or Barbara Minto, Contracting Officer, Phone 505-572-1245, Email: barbara.minto@46tg.af.mil. SPECIFICATIONS FOR ROLLER HEARTH FURNACE Description: Roller Hearth Furnace; Includes the furnace with rollers on the hearth, load table with rollers, power assist loading, and a complete control system with over temperature control. Specifications: Model Number: FLR-50-48-96-1F Internal Chamber Dimensions: 50?H x 48?W x 96?D External Chamber Dimensions: (approx) 85?H x 76?W x 113?D External Overall Dimensions (Including load table) (approx) 85?H x 76?W x 216?D Connected Load: 220 KW, 480 v/3 ph/60 Hz Maximum Output Temperature: 1150 degrees Celsius (2102 degrees Fahrenheit) Type of Heat: Heavy duty cast plate heater Location of Heaters: Both side walls and floor Type Door: Vertical lift Shell Construction: Fabricated/Welded Carbon Steel Finish: Industrial Enamel, Dimenso Dark Blue Insulation: Combination of ceramic fiber, insulating fire brick and insulating castable Stand: Angle iron stand to provide a 45? hearth table (top of rollers) Fans: Two circulation fans to be located in the top of the chamber Load Table: 96? Long with rollers Drive: Electric drive with a manual attachment to be able to move the load into and out of the furnace Maximum Load: 1000 lbs Gas Control System: Manual flow valve to be able to handle either argon or nitrogen; gas flow through the manifold that introduces the gas to the furnace at four separate locations around the furnace for even distribution using 1? pipe to get four charges per hour flow rate. Temperature Control System Equipment Specification: Model: 1-3-300-480-H07ZK Controller: Honeywell DC330B Programmable Power Controller: Zero cross SCR Thermocouple: Type ?K?, metallic sheath Configuration: 1 Zone Power Requirements: 270 Amps, 480 v/3 ph/60 Hz Enclosure: Free standing, totally inter-wired Cables: No interconnecting or power cables to be included Misc Components: Main power circuit breaker, control transformer Independent Over Temperature: Controller: Honeywell DC330B digital Power Controller: Mechanical Contactor Thermocouple: Type ?K?, metallic sheath Enclosure: Mounted in the main control enclosure and totally inter-wired Purpose: To stop power to the furnace/zone in case of malfunction in the primary power controller and/or thermocouple. Installation and Start Up: Moving equipment: Not included. Furnace will be in its proper location upon contractor?s arrival. Utilities will be within 10 feet of the final location of the furnace. Time on Site: Three days; 2 persons for installation and one day for training.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS